PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 08/25/04 EST. NO.01 TIME 01:02 PM R.E. NAME: ISSAM ABUMUHOR 07-208044 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 08/25/04 EST. NO.01 TIME 01:02 PM R.E. NAME: ISSAM ABUMUHOR 07-208044 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 08/25/04 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-208044 TIME 01:02 PM ESTIMATE NO. 01 BID OPENING 07/15/04 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/04 R.E. NAME: ISSAM ABUMUHOR DATE OF THIS ESTIMATE 08/25/04 LOCATION PROGRESS ESTIMATE 07-LA-10-21.6/42.2 ----------------- D.W. POWELL CONSTRUCTION, INC. IN LOS ANGELES COUNTY AT VARIOUS P.O. BOX 1406 LOCATIONS FONTANA CA 92334-1406 FED. AID NO. ACST-X037(121)E ,PHG-X037(121)E UPGRADE CRASH CUSHION ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 PREPARE WATER POLLUTION CONTROL LS 500.0000 500.00 0.500 250.00 0.500 250.00 PROGRAM 02 WATER POLLUTION CONTROL LS 6,000.0000 6,000.00 0.000 0.00 03 CONSTRUCTION AREA SIGNS LS 10,000.0000 10,000.00 0.360 3,600.00 0.360 3,600.00 S) 04 TRAFFIC CONTROL SYSTEM LS 90,000.0000 90,000.00 0.050 4,500.00 0.050 4,500.00 S) 05 CHANNELIZER (SURFACE MOUNTED) EA 25.0000 4,750.00 0.000 0.00 S) 06 TEMPORARY TERMINAL SECTION (TYPE K) EA 1,200.0000 4,800.00 0.000 0.00 S) 07 TEMPORARY RAILING (TYPE K) M 50.0000 69,000.00 0.000 0.00 S) 08 TEMPORARY CRASH CUSHION MODULE EA 300.0000 63,000.00 0.000 0.00 S) 09 REMOVE METAL BEAM GUARD RAILING M 80.0000 6,000.00 0.000 0.00 10 REMOVE ASPHALT CONCRETE DIKE M 40.0000 5,600.00 31.500 1,260.00 31.500 1,260.00 11 REMOVE CONCRETE CURB M 40.0000 2,000.00 0.000 0.00 12 REMOVE CRASH CUSHION EA 1,500.0000 10,500.00 0.000 0.00 13 REMOVE CRASH CUSHION (SAND FILLED) EA 800.0000 3,200.00 0.000 0.00 14 ROADWAY EXCAVATION M3 100.0000 800.00 5.180 518.00 5.180 518.00 15 LEAD COMPLIANCE PLAN LS 4,500.0000 4,500.00 0.250 1,125.00 0.250 1,125.00 16 ASPHALT CONCRETE (TYPE B) TONN 220.0000 6,600.00 0.000 0.00 17 PLACE ASPHALT CONCRETE (MISCELLANEOUS M2 75.0000 12,750.00 0.000 0.00 AREA) 18 PLACE ASPHALT CONCRETE DIKE (TYPE C) M 25.0000 3,250.00 0.000 0.00 19 PLACE ASPHALT CONCRETE DIKE (TYPE F) M 25.0000 1,375.00 0.000 0.00 20 GRIND CONCRETE CURB M 100.0000 8,200.00 0.000 0.00 S) 21 METAL BEAM GUARD RAILING (WOOD POST) M 160.0000 16,000.00 0.000 0.00 S) 22 TERMINAL SYSTEM (TYPE ET) EA 3,000.0000 6,000.00 0.000 0.00 S) PROGRAM CAS145 PAGE 2 DATE 08/25/04 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-208044 TIME 01:02 PM ESTIMATE NO. 01 BID OPENING 07/15/04 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/04 R.E. NAME: ISSAM ABUMUHOR DATE OF THIS ESTIMATE 08/25/04 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 TERMINAL ANCHOR ASSEMBLY (TYPE SFT) EA 500.0000 1,000.00 0.000 0.00 S) 24 TERMINAL ANCHOR ASSEMBLY (TYPE CA) EA 650.0000 650.00 0.000 0.00 S) 25 CRASH CUSHION, SAND FILLED EA 4,800.0000 9,600.00 0.000 0.00 S) 26 CRASH CUSHION (ADIEM) EA 17,000.0000 17,000.00 0.000 0.00 S) 27 CRASH CUSHION (REACT 9SCBS) EA 42,000.0000 126,000.00 0.000 0.00 S) 28 QUADGUARD (MODEL QS3606) EA 28,000.0000 84,000.00 0.000 0.00 S) 29 QUADGUARD (MODEL QS6906) EA 30,000.0000 60,000.00 0.000 0.00 S) 30 QUADGUARD (MODEL QS9006) EA 32,000.0000 64,000.00 0.000 0.00 S) 31 CONCRETE BARRIER (TYPE 60) M 480.0000 19,200.00 0.000 0.00 PROGRAM CAS145 PAGE 3 DATE 08/25/04 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-208044 TIME 01:02 PM ESTIMATE NO. 01 BID OPENING 07/15/04 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/04 R.E. NAME: ISSAM ABUMUHOR DATE OF THIS ESTIMATE 08/25/04 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 11,253.00 11,253.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 11,253.00 11,253.00 32 MOBILIZATION LS 70,000.0000 70,000.00 0.000 0.00 ORIGINAL CONTRACT AMOUNT 786,275.00 TOTAL WORK COMPLETED 11,253.00 11,253.00 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 11,253.00 11,253.00 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 08/10/04 100 00/00/00 00/00/00 12/02/04 0 0 0 0 1% 0% PROGRESS IS SATISFACTORY ISSAM ABUMUHOR RESIDENT ENGINEER PROGRAM CAS145 PAGE 10 DATE 08/25/04