PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 01/22/08 EST. NO.02 TIME 01:10 PM R.E. NAME: TRAN, K. 07-224804 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 01/22/08 EST. NO.02 TIME 01:10 PM R.E. NAME: TRAN, K. 07-224804 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 01/22/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-224804 TIME 01:10 PM ESTIMATE NO. 02 BID OPENING 09/27/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 01/20/08 R.E. NAME: TRAN, K. DATE OF THIS ESTIMATE 01/22/08 LOCATION PROGRESS ESTIMATE 07-LA-47-0.9/2.0 ----------------- GRIFFITH COMPANY IN LOS ANGELES COUNTY IN LOS P.O. BOX 2150 ANGELES FROM 0.2 KM WEST OF HARBOR SANTA FE SPRINGS, CA 90670 BOULEVARD UNDERCROSSING TO 0.1 KM EAST OF FERRY STREET UNDERCROSSING FED. AID NO. ACNH-P047(8)E REPAIR BRIDGE DECKS ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 5,000.0000 5,000.00 0.500 2,500.00 0.500 2,500.00 02 TIME-RELATED OVERHEAD WDAY 800.0000 200,000.00 25.000 20,000.00 49.000 39,200.00 03 PREPARE WATER POLLUTION CONTROL LS 5,400.0000 5,400.00 0.500 2,700.00 0.500 2,700.00 PROGRAM 04 WATER POLLUTION CONTROL LS 35,000.0000 35,000.00 0.100 3,500.00 0.100 3,500.00 05 CONSTRUCTION AREA SIGNS LS 25,000.0000 25,000.00 0.500 12,500.00 0.500 12,500.00 S) 06 TRAFFIC CONTROL SYSTEM LS 300,000.0000 300,000.00 0.100 30,000.00 0.100 30,000.00 S) 07 TEMPORARY TRAFFIC STRIPE (PAINT) M 0.8000 8,880.00 0.000 0.00 S) 08 TEMPORARY PAVEMENT MARKER EA 3.6000 5,508.00 0.000 0.00 S) 09 REMOVE CEMENT MORTAR DECK SURFACE M2 12.5000 273,250.00 5,465.000 68,312.50 5,465.000 68,312.50 10 PREPARE CONCRETE BRIDGE DECK SURFACE M2 2.2000 48,092.00 2,186.000 4,809.20 2,186.000 4,809.20 11 BRIDGE REMOVAL (PORTION) LS 60,000.0000 60,000.00 0.000 0.00 12 ROADWAY EXCAVATION M3 110.0000 8,250.00 0.000 0.00 13 CLASS 3 AGGREGATE BASE M3 300.0000 7,800.00 0.000 0.00 14 LEAN CONCRETE BASE M3 500.0000 11,500.00 0.000 0.00 15 CONCRETE PAVEMENT M3 400.0000 14,800.00 0.000 0.00 16 MINOR CONCRETE (MINOR STRUCTURE) M3 2,200.0000 28,600.00 0.000 0.00 F) 17 REPAIR SPALLED DECK SOFFIT M2 1,000.0000 22,000.00 0.000 0.00 18 FURNISH POLYESTER CONCRETE OVERLAY M3 2,400.0000 1,548,000.00 0.000 0.00 19 PLACE POLYESTER CONCRETE OVERLAY M2 10.5000 229,530.00 0.000 0.00 F) 20 STRUCTURAL STEEL (BRIDGE) KG 90.0000 184,500.00 0.000 0.00 SF) 21 RECONSTRUCT TRAVELER DECK M2 1,400.0000 469,000.00 0.000 0.00 SF) 22 150 MM CLAY SEWER PIPE M 360.0000 2,160.00 0.000 0.00 S) PROGRAM CAS145 PAGE 2 DATE 01/22/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-224804 TIME 01:10 PM ESTIMATE NO. 02 BID OPENING 09/27/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 01/20/08 R.E. NAME: TRAN, K. DATE OF THIS ESTIMATE 01/22/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 50 MM PVC SEWER PIPE (JACKED) M 130.0000 3,640.00 0.000 0.00 S) 24 50 MM PVC SEWER PIPE M 65.0000 26,650.00 0.000 0.00 S) 25 100 MM GALVANIZED STEEL SEWER PIPE M 450.0000 6,300.00 0.000 0.00 S) 26 150 MM PVC SEWER PIPE M 350.0000 6,650.00 0.000 0.00 S) 27 SEWER CLEANOUT EA 290.0000 4,640.00 0.000 0.00 S) 28 TRAFFIC GRADED FIBERGLASS GRATE M2 385.0000 1,155.00 0.000 0.00 S) 29 MISCELLANEOUS METAL (BRIDGE) KG 275.0000 188,925.00 0.000 0.00 SF) 30 WATER STORAGE TANK EA 2,750.0000 16,500.00 0.000 0.00 F) 31 100 MM THERMOPLASTIC TRAFFIC STRIPE M 1.5000 11,100.00 0.000 0.00 S) 32 100 MM THERMOPLASTIC TRAFFIC STRIPE M 1.2000 4,440.00 0.000 0.00 S) (BROKEN 10.98 M - 3.66 M) 33 PAVEMENT MARKER (NON-REFLECTIVE) EA 2.0000 2,040.00 0.000 0.00 S) 34 PAVEMENT MARKER (RETROREFLECTIVE) EA 4.0000 2,080.00 0.000 0.00 S) 35 ELECTRICAL WORK LS 750,000.0000 750,000.00 0.080 60,000.00 0.080 60,000.00 36 MECHANICAL WORK LS 1000,000.0000 1,000,000.00 0.000 0.00 PROGRAM CAS145 PAGE 3 DATE 01/22/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-224804 TIME 01:10 PM ESTIMATE NO. 02 BID OPENING 09/27/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 01/20/08 R.E. NAME: TRAN, K. DATE OF THIS ESTIMATE 01/22/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 204,321.70 223,521.70 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 204,321.70 223,521.70 37 MOBILIZATION LS 580,000.0000 580,000.00 0.000 0.00 ORIGINAL CONTRACT AMOUNT 6,096,390.00 TOTAL WORK COMPLETED 204,321.70 223,521.70 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 204,321.70 223,521.70 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 11/05/07 250 01/02/08 11/20/07 08/15/08 49 11 0 2 4% 19% PROGRESS IS SATISFACTORY TRAN, K. RESIDENT ENGINEER PROGRAM CAS145 PAGE 2 DATE 01/22/08