PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 11/22/06 EST. NO.02 TIME 12:15 PM R.E. NAME: IZADPANAH, MOE 07-232304 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 11/22/06 EST. NO.02 TIME 12:15 PM R.E. NAME: IZADPANAH, MOE 07-232304 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 11/22/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-232304 TIME 12:15 PM ESTIMATE NO. 02 BID OPENING 08/24/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/20/06 R.E. NAME: IZADPANAH, MOE DATE OF THIS ESTIMATE 11/22/06 LOCATION PROGRESS ESTIMATE 07-LA-101-0.6/10.4 ----------------- PETERSON-CHASE GENERAL IN LOS ANGELES COUNTY IN ENGINEERING CONSTRUCTION, INC LOS ANGELES AT VARIOUS LOCATIONS 1792 KAISER AVENUE IRVINE, CA 92614-5706 FED. AID NO. N O N E ROADSIDE MAINTENANCE ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 PREPARE STORM WATER POLLUTION LS 2,250.0000 2,250.00 0.250 562.50 0.750 1,687.50 PREVENTION PLAN 02 WATER POLLUTION CONTROL LS 20,000.0000 20,000.00 0.200 4,000.00 03 CONSTRUCTION AREA SIGNS LS 10,500.0000 10,500.00 0.300 3,150.00 0.400 4,200.00 S) 04 TRAFFIC CONTROL SYSTEM LS 180,000.0000 180,000.00 0.015 2,700.00 0.020 3,600.00 S) 05 TEMPORARY TRAFFIC STRIPE (TAPE) M 7.7000 22,561.00 0.000 0.00 S) 06 CHANNELIZER (SURFACE MOUNTED) EA 60.0000 3,360.00 28.000 1,680.00 40.000 2,400.00 S) 07 TEMPORARY RAILING (TYPE K) M 75.0000 121,500.00 494.100 37,057.50 632.100 47,407.50 S) 08 TEMPORARY CRASH CUSHION MODULE EA 350.0000 29,400.00 56.000 19,600.00 70.000 24,500.00 S) 09 TEMPORARY CRASH CUSHION (ADIEM) LS 6,000.0000 6,000.00 0.000 0.00 S) 10 REMOVE METAL BEAM GUARD RAILING M 130.0000 2,340.00 0.000 0.00 11 REMOVE YELLOW THERMOPLASTIC TRAFFIC M 22.0000 2,640.00 0.000 0.00 S) STRIPE 12 REMOVE THERMOPLASTIC TRAFFIC STRIPE M 3.3000 3,300.00 0.000 0.00 S) 13 REMOVE PAVEMENT MARKER EA 1.2000 1,308.00 0.000 0.00 S) 14 RELOCATE ROADSIDE SIGN EA 600.0000 1,200.00 0.000 0.00 15 REMOVE CONCRETE CURB M 25.0000 5,750.00 0.000 0.00 16 CLEARING AND GRUBBING LS 10,000.0000 10,000.00 0.000 0.00 17 ROADWAY EXCAVATION M3 115.0000 66,700.00 0.000 0.00 18 ROADWAY EXCAVATION (TYPE Z-2) M3 189.0000 134,190.00 0.000 0.00 (AERIALLY DEPOSITED LEAD) 19 ROADWAY EXCAVATION (TYPE Z-3) M3 515.0000 36,050.00 0.000 0.00 (AERIALLY DEPOSITED LEAD) 20 LEAD COMPLIANCE PLAN LS 6,000.0000 6,000.00 0.750 4,500.00 0.750 4,500.00 21 STRUCTURE EXCAVATION (RETAINING WALL) M3 55.0000 73,260.00 0.000 0.00 F) 22 STRUCTURE EXCAVATION (TYPE Z-2) M3 189.0000 74,277.00 0.000 0.00 F) (AERIALLY DEPOSITED LEAD) PROGRAM CAS145 PAGE 2 DATE 11/22/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-232304 TIME 12:15 PM ESTIMATE NO. 02 BID OPENING 08/24/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/20/06 R.E. NAME: IZADPANAH, MOE DATE OF THIS ESTIMATE 11/22/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 STRUCTURE EXCAVATION (TYPE Z-3) M3 515.0000 36,565.00 0.000 0.00 F) (AERIALLY DEPOSITED LEAD) 24 STRUCTURE BACKFILL (RETAINING WALL) M3 100.0000 143,400.00 0.000 0.00 F) 25 HIGHWAY PLANTING LS 51,000.0000 51,000.00 0.000 0.00 S) 26 MAINTAIN EXISTING PLANTED AREAS LS 16,500.0000 16,500.00 0.000 0.00 S) 27 PLANT ESTABLISHMENT WORK LS 31,000.0000 31,000.00 0.000 0.00 S) 28 MAINTAIN EXISTING IRRIGATION FACILITIES LS 11,000.0000 11,000.00 0.000 0.00 S) 29 IRRIGATION SYSTEM LS 135,000.0000 135,000.00 0.000 0.00 S) 30 CLASS 3 AGGREGATE BASE M3 115.0000 34,500.00 0.000 0.00 31 LEAN CONCRETE BASE M3 260.0000 59,800.00 0.000 0.00 32 ASPHALT CONCRETE (TYPE B) TONN 300.0000 29,100.00 0.000 0.00 33 CONCRETE PAVEMENT M3 325.0000 100,750.00 0.000 0.00 34 SEAL PAVEMENT JOINT M 30.0000 8,100.00 0.000 0.00 35 SEAL LONGITUDINAL ISOLATION JOINT M 30.0000 8,100.00 0.000 0.00 36 STRUCTURAL CONCRETE, RETAINING WALL M3 1,100.0000 456,500.00 0.000 0.00 F) 37 BAR REINFORCING STEEL (RETAINING WALL) KG 5.5000 60,478.00 0.000 0.00 SF) 38 100 MM PLASTIC PIPE M 150.0000 3,450.00 0.000 0.00 39 MINOR CONCRETE (GUTTER) M 180.0000 43,200.00 0.000 0.00 40 MINOR CONCRETE (COBBLESTONE TEXTURED M2 150.0000 265,500.00 0.000 0.00 PAVING) 41 MINOR CONCRETE (TEXTURED PAVING) M2 120.0000 282,000.00 0.000 0.00 42 INLET GRATE EA 200.0000 2,600.00 0.000 0.00 43 1.5 M CHAIN LINK GATE (TYPE CL-1.8) EA 1,250.0000 68,750.00 0.000 0.00 S) 44 CABLE RAILING M 62.0000 14,260.00 0.000 0.00 SF) 45 TRANSITION RAILING (TYPE WB) EA 4,000.0000 12,000.00 0.000 0.00 46 ALTERNATIVE IN-LINE TERMINAL SYSTEM EA 3,800.0000 11,400.00 0.000 0.00 47 CONCRETE BARRIER (TYPE 60D) M 305.0000 82,350.00 0.000 0.00 48 CONCRETE BARRIER (TYPE 736B) M 800.0000 2,400.00 0.000 0.00 49 100 MM THERMOPLASTIC TRAFFIC STRIPE M 4.4000 2,552.00 0.000 0.00 S) PROGRAM CAS145 PAGE 3 DATE 11/22/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-232304 TIME 12:15 PM ESTIMATE NO. 02 BID OPENING 08/24/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/20/06 R.E. NAME: IZADPANAH, MOE DATE OF THIS ESTIMATE 11/22/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 50 100 MM THERMOPLASTIC TRAFFIC STRIPE M 1.6500 2,442.00 0.000 0.00 S) (BROKEN 10.98 M - 3.66 M) 51 PAVEMENT MARKER (NON-REFLECTIVE) EA 2.2000 2,728.00 0.000 0.00 S) 52 PAVEMENT MARKER (RETROREFLECTIVE) EA 5.5000 4,125.00 0.000 0.00 S) 53 LOCATE COMMUNICATION ROUTING CONDUITS LS 8,500.0000 8,500.00 0.900 7,650.00 0.900 7,650.00 S) 54 MODIFY LIGHTING LS 49,000.0000 49,000.00 0.000 0.00 S) PROGRAM CAS145 PAGE 4 DATE 11/22/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-232304 TIME 12:15 PM ESTIMATE NO. 02 BID OPENING 08/24/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/20/06 R.E. NAME: IZADPANAH, MOE DATE OF THIS ESTIMATE 11/22/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 76,900.00 99,945.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 76,900.00 99,945.00 55 MOBILIZATION LS 265,000.0000 265,000.00 0.000 0.00 ORIGINAL CONTRACT AMOUNT 3,116,636.00 TOTAL WORK COMPLETED 76,900.00 99,945.00 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 76,900.00 99,945.00 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 09/12/06 340 00/00/00 09/27/06 08/30/07 33 4 0 0 3% 15% PROGRESS IS SATISFACTORY IZADPANAH, MOE RESIDENT ENGINEER PROGRAM CAS145 PAGE 2 DATE 11/22/06