PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 03/22/06 EST. NO.02 TIME 10:06 AM R.E. NAME: IZADPANAH, MOE 07-244304 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 03/22/06 EST. NO.02 TIME 10:06 AM R.E. NAME: IZADPANAH, MOE 07-244304 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 03/22/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-244304 TIME 10:06 AM ESTIMATE NO. 02 BID OPENING 09/22/05 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/06 R.E. NAME: IZADPANAH, MOE DATE OF THIS ESTIMATE 03/22/06 LOCATION PROGRESS ESTIMATE 07-LA-170-14.6/20.6 ----------------- O'DONNELL CONSTRUCTION IN LOS ANGELES COUNTY IN LOS 559 W. COVINA BLVD. ANGELES AT VARIOUS LOCATIONS SAN DIMAS, CA. 91773-2911 FED. AID NO. ACST-S170(2)E ,P-S170(2)E SLAB REPLACEMENT AND GRINDING ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 5,000.0000 5,000.00 0.000 0.00 02 TIME-RELATED OVERHEAD WDAY 500.0000 155,000.00 6.000 3,000.00 53.000 26,500.00 03 PREPARE WATER POLLUTION CONTROL LS 2,250.0000 2,250.00 0.750 1,687.50 PROGRAM 04 HEALTH AND SAFETY PLAN LS 5,000.0000 5,000.00 1.000 5,000.00 05 WATER POLLUTION CONTROL LS 15,000.0000 15,000.00 0.500 7,500.00 06 CONSTRUCTION AREA SIGNS LS 15,000.0000 15,000.00 0.000 0.00 S) 07 TRAFFIC CONTROL SYSTEM LS 250,000.0000 250,000.00 0.000 0.00 S) 08 REMOVE PAVEMENT MARKER EA 1.0000 32,500.00 0.000 0.00 09 COLD PLANE ASPHALT CONCRETE PAVEMENT M2 4.5000 103,500.00 0.000 0.00 S) 10 AGGREGATE BASE (APPROACH SLAB) M3 400.0000 4,800.00 0.000 0.00 11 RUBBERIZED ASPHALT CONCRETE (TYPE G) TONN 110.0000 456,500.00 0.000 0.00 12 REPLACE CONCRETE PAVEMENT M3 875.0000 227,500.00 0.000 0.00 (RAPID STRENGTH CONCRETE) 13 GRIND EXISTING AND REPLACEMENT CONCRETE M2 6.5000 2,931,500.00 0.000 0.00 PAVEMENT 14 STRUCTURAL CONCRETE, APPROACH SLAB M3 1,150.0000 187,450.00 0.000 0.00 (TYPE R) 15 PAVING NOTCH EXTENSION M3 4,000.0000 20,000.00 0.000 0.00 16 CLEAN EXPANSION JOINT M 40.0000 2,760.00 0.000 0.00 17 JOINT SEAL (MR 30 MM) M 170.0000 4,590.00 0.000 0.00 S) 18 JOINT SEAL (MR 40 MM) M 200.0000 4,800.00 0.000 0.00 S) 19 JOINT SEAL (MR 50 MM) M 280.0000 5,040.00 0.000 0.00 S) 20 THERMOPLASTIC PAVEMENT MARKING M2 20.0000 66,800.00 0.000 0.00 S) 21 100 MM THERMOPLASTIC TRAFFIC STRIPE M 1.0000 137,000.00 0.000 0.00 S) 22 200 MM THERMOPLASTIC TRAFFIC STRIPE M 2.0000 16,600.00 0.000 0.00 S) PROGRAM CAS145 PAGE 2 DATE 03/22/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-244304 TIME 10:06 AM ESTIMATE NO. 02 BID OPENING 09/22/05 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/06 R.E. NAME: IZADPANAH, MOE DATE OF THIS ESTIMATE 03/22/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 PAVEMENT MARKER (NON-REFLECTIVE) EA 1.4000 21,140.00 0.000 0.00 S) 24 PAVEMENT MARKER (RETROREFLECTIVE-SPECIAL EA 3.0000 6,780.00 0.000 0.00 S) TYPE C) 25 PAVEMENT MARKER (RETROREFLECTIVE-SPECIAL EA 3.0000 9,000.00 0.000 0.00 S) TYPE G) 26 PAVEMENT MARKER (RETROREFLECTIVE-SPECIAL EA 3.0000 36,300.00 0.000 0.00 S) TYPE H) 27 INDUCTIVE LOOP DETECTOR (REPLACEMENT) EA 610.0000 73,200.00 0.000 0.00 S) 28 MODIFY AUTOMATIC VEHICLE CLASSIFICATION LS 15,000.0000 15,000.00 0.000 0.00 S) PROGRAM CAS145 PAGE 3 DATE 03/22/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-244304 TIME 10:06 AM ESTIMATE NO. 02 BID OPENING 09/22/05 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/06 R.E. NAME: IZADPANAH, MOE DATE OF THIS ESTIMATE 03/22/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 3,000.00 40,687.50 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 3,000.00 40,687.50 29 MOBILIZATION LS 540,000.0000 540,000.00 0.000 0.00 ORIGINAL CONTRACT AMOUNT 5,350,010.00 TOTAL WORK COMPLETED 3,000.00 40,687.50 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 3,000.00 40,687.50 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE MAXIMUM CONTRACT OVERBID VALUE PRICE AMOUNT 029 MOBILIZATION 535,001.00 540,000.00 4,999.00 DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 10/26/05 310 11/10/05 11/10/05 02/15/07 53 35 0 0 1% 17% PROGRESS IS SATISFACTORY IZADPANAH, MOE RESIDENT ENGINEER PROGRAM CAS145 DATE 03/22/06