PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 11/22/06 EST. NO.10 TIME 01:34 PM R.E. NAME: IZADPANAH, MOE 07-244304 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 11/22/06 EST. NO.10 TIME 01:34 PM R.E. NAME: IZADPANAH, MOE 07-244304 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- OVERBID ITEMS OVERBID ITEM NO. 029 -2,499.50 05 OVERBID ITEM NO. 029 -1,249.75 07 OVERBID ITEM NO. 029 -999.80 08 0.00 -4,749.05 TOTAL DEDUCTIONS 0.00 -4,749.05 PROGRAM CAS145 PAGE 1 DATE 11/22/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-244304 TIME 01:34 PM ESTIMATE NO. 10 BID OPENING 09/22/05 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/20/06 R.E. NAME: IZADPANAH, MOE DATE OF THIS ESTIMATE 11/22/06 LOCATION PROGRESS ESTIMATE 07-LA-170-14.6/20.6 ----------------- O'DONNELL CONSTRUCTION IN LOS ANGELES COUNTY IN LOS 559 W. COVINA BLVD. ANGELES AT VARIOUS LOCATIONS SAN DIMAS, CA. 91773-2911 FED. AID NO. ACST-S170(2)E ,P-S170(2)E SLAB REPLACEMENT AND GRINDING ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 5,000.0000 5,000.00 0.000 0.00 02 TIME-RELATED OVERHEAD WDAY 500.0000 155,000.00 16.000 8,000.00 197.000 98,500.00 03 PREPARE WATER POLLUTION CONTROL LS 2,250.0000 2,250.00 0.750 1,687.50 PROGRAM 04 HEALTH AND SAFETY PLAN LS 5,000.0000 5,000.00 1.000 5,000.00 05 WATER POLLUTION CONTROL LS 15,000.0000 15,000.00 0.500 7,500.00 06 CONSTRUCTION AREA SIGNS LS 15,000.0000 15,000.00 0.500 7,500.00 S) 07 TRAFFIC CONTROL SYSTEM LS 250,000.0000 250,000.00 0.020 5,000.00 0.470 117,500.00 S) 08 REMOVE PAVEMENT MARKER EA 1.0000 32,500.00 12,000.000 12,000.00 09 COLD PLANE ASPHALT CONCRETE PAVEMENT M2 4.5000 103,500.00 11,142.800 50,142.60 S) 10 AGGREGATE BASE (APPROACH SLAB) M3 400.0000 4,800.00 31.100 12,440.00 11 RUBBERIZED ASPHALT CONCRETE (TYPE G) TONN 110.0000 456,500.00 1,953.000 214,830.00 12 REPLACE CONCRETE PAVEMENT M3 875.0000 227,500.00 238.000 208,250.00 (RAPID STRENGTH CONCRETE) 13 GRIND EXISTING AND REPLACEMENT CONCRETE M2 6.5000 2,931,500.00 16,835.300 109,429.45 128,552.000 835,588.00 PAVEMENT 14 STRUCTURAL CONCRETE, APPROACH SLAB M3 1,150.0000 187,450.00 167.500 192,625.00 (TYPE R) 15 PAVING NOTCH EXTENSION M3 4,000.0000 20,000.00 4.440 17,760.00 16 CLEAN EXPANSION JOINT M 40.0000 2,760.00 0.000 0.00 17 JOINT SEAL (MR 30 MM) M 170.0000 4,590.00 0.000 0.00 S) 18 JOINT SEAL (MR 40 MM) M 200.0000 4,800.00 0.000 0.00 S) 19 JOINT SEAL (MR 50 MM) M 280.0000 5,040.00 0.000 0.00 S) 20 THERMOPLASTIC PAVEMENT MARKING M2 20.0000 66,800.00 0.000 0.00 S) 21 100 MM THERMOPLASTIC TRAFFIC STRIPE M 1.0000 137,000.00 0.000 0.00 S) 22 200 MM THERMOPLASTIC TRAFFIC STRIPE M 2.0000 16,600.00 0.000 0.00 S) PROGRAM CAS145 PAGE 2 DATE 11/22/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-244304 TIME 01:34 PM ESTIMATE NO. 10 BID OPENING 09/22/05 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/20/06 R.E. NAME: IZADPANAH, MOE DATE OF THIS ESTIMATE 11/22/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 PAVEMENT MARKER (NON-REFLECTIVE) EA 1.4000 21,140.00 0.000 0.00 S) 24 PAVEMENT MARKER (RETROREFLECTIVE-SPECIAL EA 3.0000 6,780.00 0.000 0.00 S) TYPE C) 25 PAVEMENT MARKER (RETROREFLECTIVE-SPECIAL EA 3.0000 9,000.00 0.000 0.00 S) TYPE G) 26 PAVEMENT MARKER (RETROREFLECTIVE-SPECIAL EA 3.0000 36,300.00 0.000 0.00 S) TYPE H) 27 INDUCTIVE LOOP DETECTOR (REPLACEMENT) EA 610.0000 73,200.00 0.000 0.00 S) 28 MODIFY AUTOMATIC VEHICLE CLASSIFICATION LS 15,000.0000 15,000.00 0.000 0.00 S) PROGRAM CAS145 PAGE 3 DATE 11/22/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-244304 TIME 01:34 PM ESTIMATE NO. 10 BID OPENING 09/22/05 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/20/06 R.E. NAME: IZADPANAH, MOE DATE OF THIS ESTIMATE 11/22/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 122,429.45 1,781,323.10 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 122,429.45 1,781,323.10 29 MOBILIZATION LS 540,000.0000 540,000.00 0.950 513,000.00 ORIGINAL CONTRACT AMOUNT 5,350,010.00 TOTAL WORK COMPLETED 122,429.45 2,294,323.10 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 -4,749.05 TOTAL 122,429.45 2,289,574.05 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE MAXIMUM CONTRACT OVERBID VALUE PRICE AMOUNT 029 MOBILIZATION 535,001.00 540,000.00 4,999.00 DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 10/26/05 310 11/10/05 11/10/05 04/30/07 203 54 0 0 43% 65% PROGRESS IS SATISFACTORY IZADPANAH, MOE RESIDENT ENGINEER PROGRAM CAS145 PAGE 4 DATE 11/22/06