PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 12/26/06 EST. NO.18 TIME 12:45 PM R.E. NAME: ALI, MASHHUR 07-244704 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 12/26/06 EST. NO.18 TIME 12:45 PM R.E. NAME: ALI, MASHHUR 07-244704 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE NON-SUB. SWPP -93,240.12 03 NON-SUBMITTAL SWPP 93,240.12 04 SOLID WASTE REPORT -10,000.00 09 SOLID WASTE REPORT 10,000.00 10 LATE OPENING LANES -15,900.00 14 0.00 -15,900.00 OVERBID ITEMS OVERBID ITEM NO. 015 -6,250.00 02 0.00 -6,250.00 TOTAL DEDUCTIONS 0.00 -22,150.00 PROGRAM CAS145 PAGE 1 DATE 12/26/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-244704 TIME 12:45 PM ESTIMATE NO. 18 BID OPENING 06/02/05 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/20/06 R.E. NAME: ALI, MASHHUR DATE OF THIS ESTIMATE 12/26/06 LOCATION PROGRESS ESTIMATE 07-LA-710-18.4/26.5 ----------------- ALL AMERICAN ASPHALT IN LOS ANGELES COUNTY IN VARIOUS P O BOX 2229 LOCATIONS CORONA CA 92878 FED. AID NO. ACNH-710 -1(781)E SLAB REPLACEMENT AND GRINDING ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 2,500.0000 2,500.00 0.500 1,250.00 02 TIME-RELATED OVERHEAD WDAY 445.0000 222,500.00 19.000 8,455.00 439.000 195,355.00 03 PREPARE STORM WATER POLLUTION LS 1,900.0000 1,900.00 0.750 1,425.00 PREVENTION PLAN 04 WATER POLLUTION CONTROL LS 59,500.0000 59,500.00 0.060 3,570.00 0.900 53,550.00 05 TEMPORARY CONCRETE WASHOUT FACILITY LS 3,580.0000 3,580.00 0.000 0.00 06 CONSTRUCTION AREA SIGNS LS 11,000.0000 11,000.00 0.700 7,700.00 S) 07 TRAFFIC CONTROL SYSTEM LS 520,000.0000 520,000.00 0.010 5,200.00 0.980 509,600.00 S) 08 TEMPORARY TRAFFIC STRIPE (PAINT) M 0.5000 16,650.00 11,411.000 5,705.50 S) 09 TEMPORARY PAVEMENT MARKER EA 3.0000 109,500.00 10,000.000 30,000.00 13,080.000 39,240.00 S) 10 REMOVE YELLOW THERMOPLASTIC TRAFFIC M 1.4000 67,480.00 0.000 0.00 S) STRIPE 11 REMOVE THERMOPLASTIC TRAFFIC STRIPE M 1.2000 97,920.00 0.000 0.00 S) 12 REMOVE THERMOPLASTIC PAVEMENT MARKING M2 30.0000 1,440.00 0.000 0.00 S) 13 REMOVE PAVEMENT MARKER EA 0.7500 57,150.00 20,000.000 15,000.00 20,000.000 15,000.00 S) 14 COLD PLANE ASPHALT CONCRETE PAVEMENT M2 1.8000 49,320.00 0.000 0.00 S) 15 LEAD COMPLIANCE PLAN LS 22,500.0000 22,500.00 0.500 11,250.00 16 RUBBERIZED ASPHALT CONCRETE (TYPE G) TONN 76.0000 295,640.00 0.000 0.00 17 REPLACE CONCRETE PAVEMENT M3 820.0000 9,922,000.00 13,039.070 10,692,037.40 (RAPID STRENGTH CONCRETE) 18 TIE BAR (DRILL AND BOND) EA 7.1200 127,448.00 14,389.000 102,449.68 19 GROOVE EXISTING CONCRETE PAVEMENT M2 2.9900 956,800.00 59,758.930 178,679.20 S) 20 GRIND ASPHALT CONCRETE SURFACING M2 10.0000 67,400.00 0.000 0.00 S) 21 GRIND EXISTING CONCRETE M2 5.9000 1,888,000.00 43,672.900 257,670.11 183,733.740 1,084,029.07 S) PAVEMENT 22 DRILL AND BOND DOWEL M 19.9300 390,628.00 12,349.540 246,126.33 PROGRAM CAS145 PAGE 2 DATE 12/26/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-244704 TIME 12:45 PM ESTIMATE NO. 18 BID OPENING 06/02/05 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/20/06 R.E. NAME: ALI, MASHHUR DATE OF THIS ESTIMATE 12/26/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 THERMOPLASTIC PAVEMENT MARKING M2 32.0000 1,536.00 0.000 0.00 S) 24 100 MM THERMOPLASTIC TRAFFIC STRIPE M 0.8500 81,940.00 0.000 0.00 S) 25 200 MM THERMOPLASTIC TRAFFIC STRIPE M 2.5000 6,375.00 0.000 0.00 S) 26 200 MM THERMOPLASTIC TRAFFIC STRIPE M 2.2500 11,025.00 0.000 0.00 S) (BROKEN 3.66 M - 0.92 M) 27 100 MM THERMOPLASTIC TRAFFIC STRIPE M 0.7500 25,050.00 0.000 0.00 S) (BROKEN 10.98 M - 3.66 M) 28 PAVEMENT MARKER (NON-REFLECTIVE) EA 1.2500 45,875.00 0.000 0.00 S) 29 PAVEMENT MARKER (RETROREFLECTIVE) EA 3.0000 42,600.00 0.000 0.00 S) 30 AUTOMATIC VEHICLE CLASSIFICATION LS 7,600.0000 7,600.00 0.000 0.00 S) (LOCATION 1) 31 AUTOMATIC VEHICLE CLASSIFICATION LS 7,600.0000 7,600.00 0.000 0.00 S) (LOCATION 2) 32 MODIFY TRAFFIC MONITORING STATION LS 24,800.0000 24,800.00 0.000 0.00 S) 33 MODIFY RAMP METERING SYSTEM LS 43,000.0000 43,000.00 0.000 0.00 S) PROGRAM CAS145 PAGE 3 DATE 12/26/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-244704 TIME 12:45 PM ESTIMATE NO. 18 BID OPENING 06/02/05 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/20/06 R.E. NAME: ALI, MASHHUR DATE OF THIS ESTIMATE 12/26/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 319,895.11 13,143,397.18 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 319,895.11 13,143,397.18 34 MOBILIZATION LS 3,240.0000 3,240.00 1.000 3,240.00 ORIGINAL CONTRACT AMOUNT 15,191,497.00 TOTAL WORK COMPLETED 319,895.11 13,146,637.18 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 -22,150.00 TOTAL 319,895.11 13,124,487.18 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE MAXIMUM CONTRACT OVERBID VALUE PRICE AMOUNT 015 LEAD COMPLIANCE PLAN 10,000.00 22,500.00 12,500.00 DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 06/17/05 500 07/12/05 06/10/05 03/31/07 439 120 0 9 82% 86% PROGRESS IS SATISFACTORY ALI, MASHHUR RESIDENT ENGINEER PROGRAM CAS145 DATE 12/26/06