PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 08/22/12 EST. NO.08 TIME 02:42 PM R.E. NAME: SAAD, HUSSEIN 07-260104 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 007 0002-1 -12,026.45 E.W. @ U.P (+) 051812 N 0001 0 DAO CORRECTING ENTRY 0002-2 11,598.65 051812 N 0001 0 DAO CORRECTING ENTRY 0004 427.80 051812 N 0004 0 0005 -427.80 A.C. @ L.S.(-) 051812 N 802192 -427.80 TOTAL THIS ESTIMATE 22,809.12 TOTAL PREVIOUS ESTIMATE 22,381.32 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 08/22/12 EST. NO.08 TIME 02:42 PM R.E. NAME: SAAD, HUSSEIN 07-260104 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE SECTION 10-1.11 -10,000.00 08 -10,000.00 -10,000.00 TOTAL DEDUCTIONS -10,000.00 -10,000.00 PROGRAM CAS145 PAGE 1 DATE 08/22/12 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-260104 TIME 02:42 PM ESTIMATE NO. 08 BID OPENING 09/22/11 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/12 R.E. NAME: SAAD, HUSSEIN DATE OF THIS ESTIMATE 08/22/12 LOCATION PROGRESS ESTIMATE 07-LA-91-11.7/12.0 ----------------- WESTERN STRUCTURES IN LOS ANGELES COUNTY IN LONG BEACH 6005 TYLER STREET AT ROUTE 91/710 SEPARATION RIVERSIDE CA 92503 FED. AID NO. NHPP-911(33E) REPLACE BRIDGE RAILING ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 001 CONSTRUCTION SITE MANAGEMENT LS 4,577.2000 4,577.20 0.100 457.72 0.900 4,119.48 002 PREPARE WATER POLLUTION CONTROL LS 1,262.4000 1,262.40 1.000 1,262.40 PROGRAM 003 TEMPORARY DRAINAGE INLET PROTECTION EA 213.6200 1,708.96 8.000 1,708.96 004 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 7,925.4000 7,925.40 0.200 1,585.08 0.800 6,340.32 005 CONSTRUCTION AREA SIGNS LS 1,003.1300 1,003.13 0.750 752.35 006 TRAFFIC CONTROL SYSTEM LS 79,000.0000 79,000.00 0.050 3,950.00 0.900 71,100.00 007 TEMPORARY TRAFFIC STRIPE (TAPE) LF 1.8700 27,863.00 21,281.000 39,795.47 008 TEMPORARY PAVEMENT MARKER EA 5.6600 5,943.00 1,577.000 8,925.82 009 TEMPORARY RAILING (TYPE K) LF 15.1700 76,456.80 5,580.000 84,648.60 010 TEMPORARY CRASH CUSHION MODULE EA 101.9000 4,279.80 52.000 5,298.80 011 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 2.8300 8,971.10 2,693.000 7,621.19 STRIPE (HAZARDOUS WASTE) 012 REMOVE METAL BEAM GUARD RAILING LF 29.4400 2,944.00 100.000 2,944.00 013 REMOVE PAINTED TRAFFIC STRIPE LF 1.1300 1,096.10 2,292.000 2,589.96 014 REMOVE PAVEMENT MARKING LF 2.9400 2,205.00 643.000 1,890.42 015 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 1.1300 4,226.20 5,802.000 6,556.26 016 REMOVE PAVEMENT MARKER EA 1.6700 918.50 914.000 1,526.38 017 REMOVE ROADSIDE SIGN (WOOD POST) EA 67.9300 815.16 12.000 815.16 018 REMOVE ROADSIDE SIGN EA 67.9300 135.86 2.000 135.86 (STRAP AND SADDLE BRACKET METHOD) 019 REMOVE OVERHEAD SIGN PANEL EA 943.5000 943.50 1.000 943.50 1.000 943.50 020 SALVAGE METAL BRIDGE RAILING LF 6.6600 26,886.42 3,679.000 24,502.14 021 SALVAGE CONCRETE BARRIER (TYPE K) LF 17.6500 9,178.00 0.000 0.00 022 REMOVE CONCRETE BARRIER LF 92.0000 371,404.00 4,037.000 371,404.00 PROGRAM CAS145 PAGE 2 DATE 08/22/12 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-260104 TIME 02:42 PM ESTIMATE NO. 08 BID OPENING 09/22/11 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/12 R.E. NAME: SAAD, HUSSEIN DATE OF THIS ESTIMATE 08/22/12 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 023 REMOVE CRASH CUSHION EA 166.5000 166.50 1.000 166.50 024 BRIDGE REMOVAL (PORTION) LS 116,871.9000 116,871.90 1.000 116,871.90 025 ROADWAY EXCAVATION (TYPE Z-2) CY 220.8900 3,755.13 27.000 5,964.03 (AERIALLY DEPOSITED LEAD) 026 LEAD COMPLIANCE PLAN LS 4,528.8000 4,528.80 1.000 4,528.80 027 STRUCTURE EXCAVATION (BRIDGE) CY 234.6800 2,816.16 12.000 2,816.16 (F) 028 STRUCTURE BACKFILL (BRIDGE) CY 288.0800 3,456.96 4.000 1,152.32 (F) 029 CLASS 3 AGGREGATE BASE CY 145.1700 1,451.70 10.000 1,451.70 030 STRUCTURAL CONCRETE, BRIDGE CY 724.0000 228,784.00 82.000 59,368.00 316.000 228,784.00 (F) 031 MINOR CONCRETE (MINOR STRUCTURE) CY 794.5600 5,561.92 7.000 5,561.92 (F) 032 BAR REINFORCING STEEL (BRIDGE) LB 1.5500 100,285.00 16,038.000 24,858.90 64,700.000 100,285.00 (F) 033 FURNISH FORMED PANEL SIGN (OVERHEAD) SQFT 15.1000 7,248.00 480.000 7,248.00 480.000 7,248.00 034 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 12.7700 1,915.50 0.000 0.00 (0.063"-UNFRAMED) 035 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 38.8500 621.60 0.000 0.00 (0.080"-UNFRAMED) 036 METAL (BARRIER MOUNTED SIGN) LB 6.2200 10,822.80 2,081.000 12,943.82 037 INSTALL SIGN (STRAP AND SADDLE BRACKET EA 138.7500 138.75 0.000 0.00 METHOD) 038 INSTALL SIGN PANEL ON EXISTING FRAME SQFT 10.6600 5,116.80 480.000 5,116.80 480.000 5,116.80 039 CRASH CUSHION (REACT 62B060) EA 88,734.3900 88,734.39 0.000 0.00 040 CONCRETE BARRIER (TYPE 60S) LF 98.6000 13,804.00 0.000 0.00 041 CONCRETE BARRIER (TYPE 732 MODIFIED) LF 99.2200 16,272.08 164.000 16,272.08 164.000 16,272.08 042 CONCRETE BARRIER (TYPE 732) LF 72.8200 174,331.08 1,027.000 74,786.14 1,027.000 74,786.14 043 CONCRETE BARRIER (TYPE 742) LF 85.3800 121,239.60 1,420.000 121,239.60 044 CONCRETE BARRIER (TYPE 742 MODIFIED) LF 222.0400 13,100.36 59.000 13,100.36 045 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.1600 1,017.60 0.000 0.00 046 8" THERMOPLASTIC TRAFFIC STRIPE LF 1.1300 485.90 0.000 0.00 047 THERMOPLASTIC PAVEMENT MARKING SQFT 5.6600 2,264.00 0.000 0.00 048 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.4000 1,636.00 0.000 0.00 (BROKEN 36-12) 049 PAVEMENT MARKER (NON-REFLECTIVE) EA 2.2600 791.00 0.000 0.00 PROGRAM CAS145 PAGE 3 DATE 08/22/12 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-260104 TIME 02:42 PM ESTIMATE NO. 08 BID OPENING 09/22/11 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/12 R.E. NAME: SAAD, HUSSEIN DATE OF THIS ESTIMATE 08/22/12 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 050 PAVEMENT MARKER (RETROREFLECTIVE) EA 5.6600 1,415.00 0.000 0.00 051 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 2,264.4000 2,264.40 0.200 452.88 0.900 2,037.96 SYSTEM ELEMENTS DURING CONSTRUCTION 052 MODIFY LIGHTING LS 102,605.6300 102,605.63 0.140 14,364.79 0.500 51,302.82 PROGRAM CAS145 PAGE 4 DATE 08/22/12 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-260104 TIME 02:42 PM ESTIMATE NO. 08 BID OPENING 09/22/11 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/12 R.E. NAME: SAAD, HUSSEIN DATE OF THIS ESTIMATE 08/22/12 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 209,403.89 1,416,510.98 ADJUSTMENT OF COMPENSATION -427.80 -427.80 EXTRA WORK 0.00 22,809.12 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 208,976.09 1,438,892.30 053 MOBILIZATION LS 125,000.0000 125,000.00 1.000 125,000.00 ORIGINAL CONTRACT AMOUNT 1,798,246.09 TOTAL WORK COMPLETED 208,976.09 1,563,892.30 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS -10,000.00 -10,000.00 TOTAL 198,976.09 1,553,892.30 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 12/21/11 95 01/05/12 01/05/12 10/30/12 130 19 13 0 83% 100% PROGRESS IS SATISFACTORY UNSATIS PROGRESS OVERRIDEN BECAU CCO DAYS SAAD, HUSSEIN RESIDENT ENGINEER PROGRAM CAS145 DATE 08/22/12