PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 02/25/14 EST. NO.24 TIME 12:55 PM R.E. NAME: DOUGHLY JOE 07-286904 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 02/25/14 EST. NO.24 TIME 12:55 PM R.E. NAME: DOUGHLY JOE 07-286904 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE ITEM37-7DAY STRENGTH -79,430.00 20 ANNUAL 2013 SOLID WS -10,000.00 23 ANNUAL 2013 SOLID WS 10,000.00 24 10,000.00 -79,430.00 TOTAL DEDUCTIONS 10,000.00 -79,430.00 PROGRAM CAS145 PAGE 1 DATE 02/25/14 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-286904 TIME 12:55 PM ESTIMATE NO. 24 BID OPENING 11/17/11 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/14 R.E. NAME: DOUGHLY JOE DATE OF THIS ESTIMATE 02/25/14 LOCATION PROGRESS ESTIMATE 07-LA-60-11.6/R23.6 ----------------- FLATIRON WEST INC IN LA COUNTY IN CITY OF INDUSTRY 1770 LA COSTA MEADOWS DRIVE AND DIAMOND BAR FROM ROUTE 60/605 SAN MARCOS CA 92078 SEPARATION TO S57/60 SEPARATION FED. AID NO. ACNH-P060(140)E REPLACE PCC SLAB, GRIND PAVEMENT ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 3,000.0000 3,000.00 0.500 1,500 002 TIME-RELATED OVERHEAD WDAY 2,200.0000 1,430,000.00 23.000 50,600.00 498.000 1,095,600 003 CONSTRUCTION SITE MANAGEMENT LS 120,000.0000 120,000.00 0.080 9,600.00 0.800 96,000 004 PREPARE STORM WATER POLLUTION LS 3,500.0000 3,500.00 0.780 2,730 PREVENTION PLAN 005 TEMPORARY DRAINAGE INLET PROTECTION EA 300.0000 7,500.00 0.000 0 006 STREET SWEEPING LS 325,000.0000 325,000.00 0.080 26,000.00 0.800 260,000 007 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 200,000.0000 200,000.00 0.080 16,000.00 0.800 160,000 008 RAIN EVENT ACTION PLAN EA 500.0000 25,000.00 22.000 11,000 009 STORM WATER ANNUAL REPORT EA 2,000.0000 6,000.00 2.000 4,000 010 STORM WATER SAMPLING AND ANALYSIS DAY EA 500.0000 13,500.00 8.000 4,000 011 CONSTRUCTION AREA SIGNS LS 50,000.0000 50,000.00 0.750 37,500 012 TRAFFIC CONTROL SYSTEM LS 2,300,000.0000 2,300,000.00 0.080 184,000.00 0.800 1,840,000 013 CHANNELIZER (SURFACE MOUNTED) EA 30.0000 13,200.00 624.000 18,720 014 TEMPORARY RAILING (TYPE K) LF 7.0000 81,200.00 21,600.000 151,200 015 TEMPORARY CRASH CUSHION MODULE EA 150.0000 9,000.00 56.000 8,400 016 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 0.3200 96,000.00 304,407.000 97,410 STRIPE (HAZARDOUS WASTE) 017 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 0.5500 35,805.00 15,784.000 8,681 018 REMOVE PAVEMENT MARKER EA 0.5500 34,155.00 2,456.000 1,350 019 REMOVE ASPHALT CONCRETE DIKE LF 2.0000 1,000.00 0.000 0 020 REMOVE CONCRETE PAVEMENT SQYD 15.0000 4,440,000.00 15,245.685 228,685.28 195,129.638 2,926,944 021 REPLACE UNDERLYING BASE CY 220.0000 418,000.00 76.750 16,885 022 REMOVE UNSOUND CONCRETE CF 855.0000 18,810.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 02/25/14 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-286904 TIME 12:55 PM ESTIMATE NO. 24 BID OPENING 11/17/11 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/14 R.E. NAME: DOUGHLY JOE DATE OF THIS ESTIMATE 02/25/14 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 CLEARING AND GRUBBING LS 7,500.0000 7,500.00 1.000 7,500 024 ROADWAY EXCAVATION CY 23.7500 3,823,750.00 7,635.330 181,339.09 108,530.927 2,577,609 025 ROADWAY EXCAVATION (TYPE Z-2) CY 135.0000 63,450.00 0.000 0 (AERIALLY DEPOSITED LEAD) 026 LEAD COMPLIANCE PLAN LS 15,000.0000 15,000.00 0.000 0 027 DITCH EXCAVATION CY 130.0000 1,950.00 0.000 0 028 SUBGRADE ENHANCEMENT FABRIC SQYD 3.1000 85,560.00 26,607.999 82,484 029 MECHANICALLY STABLIZED LAYER (GEOGRID) SQYD 3.1000 281,170.00 24,922.999 77,261 030 EROSION CONTROL (HYDROSEED) (SQFT) SQFT 0.2000 2,920.00 0.000 0 031 AGGREGATE BASE (APPROACH SLAB) CY 700.0000 174,300.00 0.000 0 032 CLASS 3 AGGREGATE BASE CY 24.5000 345,450.00 4,668.566 114,379 033 LEAN CONCRETE BASE (RAPID SETTING) CY 145.0000 7,105,000.00 2,598.074 376,720.73 33,012.350 4,786,790 034 HOT MIX ASPHALT (TYPE A) TON 175.0000 8,575.00 0.000 0 035 PLACE ASPHALT CONCRETE DIKE (TYPE C) LF 35.0000 4,550.00 0.000 0 036 PLACE ASPHALT CONCRETE DIKE (TYPE F) LF 30.0000 5,100.00 0.000 0 037 JOINTED PLAIN CONCRETE PAVEMENT CY 260.0000 27,560,000.00 5,315.761 1,382,097.86 71,142.451 18,497,037 (RAPID STRENGTH CONCRETE) 038 JOINTED PLAIN CONCRETE PAVEMENT CY 32.0000 16,000.00 458.640 14,676 (RAPID STRENGTH CONCRETE) (550 PSI) 039 INDIVIDUAL SLAB REPLACEMENT CY 370.0000 5,291,000.00 12,640.040 4,676,814 040 SEAL PAVEMENT JOINT LF 1.8500 1,039,700.00 0.000 0 041 SEAL ISOLATION JOINT LF 13.0000 1,885,000.00 2,290.500 29,776.50 38,278.750 497,623 042 REPAIR SPALLED JOINTS (POLYESTER GROUT) SQYD 900.0000 333,000.00 23.810 21,429.00 141.320 127,188 043 SEAL JOINT (EXISTING CONCRETE PAVEMENT) LF 2.2800 752,400.00 0.000 0 044 GRIND EXISTING CONCRETE SQYD 3.4800 1,165,800.00 321,458.000 1,118,673 PAVEMENT 045 STRUCTURAL CONCRETE, APPROACH SLAB CY 650.0000 1,608,100.00 0.000 0 (TYPE R) 046 MINOR CONCRETE (MINOR STRUCTURE) CY 800.0000 5,120.00 0.000 0 (F) 047 PAVING NOTCH EXTENSION CF 65.0000 112,320.00 0.000 0 048 CLEAN EXPANSION JOINT LF 13.0000 12,103.00 0.000 0 049 RAPID SETTING CONCRETE (PATCH) CF 300.0000 6,600.00 0.000 0 PROGRAM CAS145 PAGE 3 DATE 02/25/14 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-286904 TIME 12:55 PM ESTIMATE NO. 24 BID OPENING 11/17/11 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/14 R.E. NAME: DOUGHLY JOE DATE OF THIS ESTIMATE 02/25/14 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 050 JOINT SEAL (MR 2") LF 65.0000 210,145.00 0.000 0 051 18" REINFORCED CONCRETE PIPE LF 70.0000 17,500.00 0.000 0 052 18" CORRUGATED STEEL PIPE RISER LF 800.0000 3,520.00 0.000 0 (.168" THICK) 053 18" STEEL FLARED END SECTION EA 1,100.0000 1,100.00 0.000 0 054 ROCK SLOPE PROTECTION (DRAINAGE OUTLET) CY 600.0000 2,400.00 0.000 0 055 MISCELLANEOUS IRON AND STEEL LB 2.0000 1,052.00 0.000 0 (F) 056 SPECIAL MARKER EA 100.0000 400.00 0.000 0 057 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.3500 148,750.00 0.000 0 058 8" THERMOPLASTIC TRAFFIC STRIPE LF 1.0000 12,300.00 0.000 0 (BROKEN 12-3) 059 THERMOPLASTIC PAVEMENT MARKING SQFT 3.4000 16,660.00 0.000 0 060 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.2000 81,000.00 0.000 0 (BROKEN 36-12) 061 8" THERMOPLASTIC TRAFFIC STRIPE LF 1.0000 15,600.00 0.000 0 (BROKEN 36-11.5) 062 PAINT TRAFFIC STRIPE (2-COAT) LF 0.3600 38,160.00 130,000.000 46,800 063 PAINT PAVEMENT MARKING (2-COAT) SQFT 3.5000 1,190.00 252.000 882 064 PAVEMENT MARKER (NON-REFLECTIVE) EA 1.1000 37,290.00 644.000 708 065 PAVEMENT MARKER (RETROREFLECTIVE) EA 3.0000 63,300.00 6,456.000 19,368 066 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 3,500.0000 3,500.00 0.000 0 SYSTEM ELEMENTS DURING CONSTRUCTION 067 MODIFY TRAFFIC MONITORING STATION LS 70,000.0000 70,000.00 0.000 0 068 MODIFY RAMP METERING SYSTEM LS 70,000.0000 70,000.00 0.000 0 069 MODIFY AUTOMATIC VEHICLE CLASSIFICATION LS 30,000.0000 30,000.00 0.000 0 STATION PROGRAM CAS145 PAGE 4 DATE 02/25/14 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-286904 TIME 12:55 PM ESTIMATE NO. 24 BID OPENING 11/17/11 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/14 R.E. NAME: DOUGHLY JOE DATE OF THIS ESTIMATE 02/25/14 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 2,506,248.46 39,387,720.58 ADJUSTMENT OF COMPENSATION 0.00 1,332,415.08 EXTRA WORK 0.00 156,114.20 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 2,506,248.46 40,876,249.86 070 MOBILIZATION LS 5,500,000.0000 5,500,000.00 1.000 5,500,000 ORIGINAL CONTRACT AMOUNT 67,665,955.00 TOTAL WORK COMPLETED 2,506,248.46 46,376,249.86 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 10,000.00 -79,430.00 TOTAL 2,516,248.46 46,296,819.86 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 01/18/12 650 04/27/12 02/02/12 07/30/14 498 168 7 0 66% 76% PROGRESS IS SATISFACTORY DOUGHLY JOE RESIDENT ENGINEER PROGRAM CAS145 DATE 02/25/14