PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 10/22/14 EST. NO.32 TIME 11:21 AM R.E. NAME: DOUGHLY JOE 07-286904 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 003 0016 4.00 A.C. @ U.P.(+) 043012 N 0087.0 0017 41.60 053112 N 0088.0 0018 157.20 063012 N 0089.0 0019 185.20 073112 N 0090.0 0020 110.00 083112 N 0091.0 0021 152.80 093012 N 0092.0 0023 30.00 113012 N 0094.0 0024 39.60 123112 N 0095.0 720.40 TOTAL THIS ESTIMATE 2,014,799.38 TOTAL PREVIOUS ESTIMATE 2,015,519.78 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 10/22/14 EST. NO.32 TIME 11:21 AM R.E. NAME: DOUGHLY JOE 07-286904 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE ITEM37-7DAY STRENGTH -79,430.00 20 ANNUAL 2013 SOLID WS -10,000.00 23 ANNUAL 2013 SOLID WS 10,000.00 24 0.00 -79,430.00 TOTAL DEDUCTIONS 0.00 -79,430.00 PROGRAM CAS145 PAGE 1 DATE 10/22/14 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-286904 TIME 11:21 AM ESTIMATE NO. 32 BID OPENING 11/17/11 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/14 R.E. NAME: DOUGHLY JOE DATE OF THIS ESTIMATE 10/22/14 LOCATION PROGRESS ESTIMATE 07-LA-60-11.6/R23.6 ----------------- FLATIRON WEST INC IN LA COUNTY IN CITY OF INDUSTRY 1770 LA COSTA MEADOWS DRIVE AND DIAMOND BAR FROM ROUTE 60/605 SAN MARCOS CA 92078 SEPARATION TO S57/60 SEPARATION FED. AID NO. ACNH-P060(140)E REPLACE PCC SLAB, GRIND PAVEMENT ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 3,000.0000 3,000.00 0.750 2,250 002 TIME-RELATED OVERHEAD WDAY 2,200.0000 1,430,000.00 28.000 61,600.00 697.000 1,533,400 003 CONSTRUCTION SITE MANAGEMENT LS 120,000.0000 120,000.00 0.010 1,200.00 0.990 118,800 004 PREPARE STORM WATER POLLUTION LS 3,500.0000 3,500.00 0.900 3,150 PREVENTION PLAN 005 TEMPORARY DRAINAGE INLET PROTECTION EA 300.0000 7,500.00 0.000 0 006 STREET SWEEPING LS 325,000.0000 325,000.00 0.010 3,250.00 0.990 321,750 007 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 200,000.0000 200,000.00 0.020 4,000.00 1.000 200,000 008 RAIN EVENT ACTION PLAN EA 500.0000 25,000.00 27.000 13,500 009 STORM WATER ANNUAL REPORT EA 2,000.0000 6,000.00 3.000 6,000 010 STORM WATER SAMPLING AND ANALYSIS DAY EA 500.0000 13,500.00 11.000 5,500 011 CONSTRUCTION AREA SIGNS LS 50,000.0000 50,000.00 0.750 37,500 012 TRAFFIC CONTROL SYSTEM LS 2,300,000.0000 2,300,000.00 0.010 23,000.00 0.990 2,277,000 013 CHANNELIZER (SURFACE MOUNTED) EA 30.0000 13,200.00 624.000 18,720 014 TEMPORARY RAILING (TYPE K) LF 7.0000 81,200.00 21,600.000 151,200 015 TEMPORARY CRASH CUSHION MODULE EA 150.0000 9,000.00 56.000 8,400 016 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 0.3200 96,000.00 304,407.000 97,410 STRIPE (HAZARDOUS WASTE) 017 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 0.5500 35,805.00 58,590.000 32,224 018 REMOVE PAVEMENT MARKER EA 0.5500 34,155.00 325.000 178.75 58,915.000 32,403 019 REMOVE ASPHALT CONCRETE DIKE LF 2.0000 1,000.00 0.000 0 020 REMOVE CONCRETE PAVEMENT SQYD 15.0000 4,440,000.00 2,596.690 38,950.35 324,249.031 4,863,735 021 REPLACE UNDERLYING BASE CY 220.0000 418,000.00 76.750 16,885 022 REMOVE UNSOUND CONCRETE CF 855.0000 18,810.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 10/22/14 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-286904 TIME 11:21 AM ESTIMATE NO. 32 BID OPENING 11/17/11 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/14 R.E. NAME: DOUGHLY JOE DATE OF THIS ESTIMATE 10/22/14 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 CLEARING AND GRUBBING LS 7,500.0000 7,500.00 1.000 7,500 024 ROADWAY EXCAVATION CY 23.7500 3,823,750.00 322.820 7,666.98 174,852.850 4,152,755 025 ROADWAY EXCAVATION (TYPE Z-2) CY 135.0000 63,450.00 0.000 0 (AERIALLY DEPOSITED LEAD) 026 LEAD COMPLIANCE PLAN LS 15,000.0000 15,000.00 1.000 15,000.00 1.000 15,000 027 DITCH EXCAVATION CY 130.0000 1,950.00 0.000 0 028 SUBGRADE ENHANCEMENT FABRIC SQYD 3.1000 85,560.00 26,607.999 82,484 029 MECHANICALLY STABLIZED LAYER (GEOGRID) SQYD 3.1000 281,170.00 24,922.999 77,261 030 EROSION CONTROL (HYDROSEED) (SQFT) SQFT 0.2000 2,920.00 0.000 0 031 AGGREGATE BASE (APPROACH SLAB) CY 700.0000 174,300.00 477.253 334,077 032 CLASS 3 AGGREGATE BASE CY 24.5000 345,450.00 4,668.566 114,379 033 LEAN CONCRETE BASE (RAPID SETTING) CY 145.0000 7,105,000.00 282.390 40,946.55 54,283.807 7,871,152 034 HOT MIX ASPHALT (TYPE A) TON 175.0000 8,575.00 0.000 0 035 PLACE ASPHALT CONCRETE DIKE (TYPE C) LF 35.0000 4,550.00 0.000 0 036 PLACE ASPHALT CONCRETE DIKE (TYPE F) LF 30.0000 5,100.00 0.000 0 037 JOINTED PLAIN CONCRETE PAVEMENT CY 260.0000 27,560,000.00 605.620 157,461.20 115,375.049 29,997,512 (RAPID STRENGTH CONCRETE) 038 JOINTED PLAIN CONCRETE PAVEMENT CY 32.0000 16,000.00 458.640 14,676 (RAPID STRENGTH CONCRETE) (550 PSI) 039 INDIVIDUAL SLAB REPLACEMENT CY 370.0000 5,291,000.00 12,640.040 4,676,814 040 SEAL PAVEMENT JOINT LF 1.8500 1,039,700.00 40,794.000 75,468.90 210,000.000 388,500 041 SEAL ISOLATION JOINT LF 13.0000 1,885,000.00 10,000.000 130,000.00 154,241.000 2,005,133 042 REPAIR SPALLED JOINTS (POLYESTER GROUT) SQYD 900.0000 333,000.00 15.000 13,500.00 359.090 323,181 043 SEAL JOINT (EXISTING CONCRETE PAVEMENT) LF 2.2800 752,400.00 0.000 0 044 GRIND EXISTING CONCRETE SQYD 3.4800 1,165,800.00 321,458.000 1,118,673 PAVEMENT 045 STRUCTURAL CONCRETE, APPROACH SLAB CY 650.0000 1,608,100.00 1,856.663 1,206,830 (TYPE R) 046 MINOR CONCRETE (MINOR STRUCTURE) CY 800.0000 5,120.00 0.000 0 (F) 047 PAVING NOTCH EXTENSION CF 65.0000 112,320.00 1,259.220 81,849 048 CLEAN EXPANSION JOINT LF 13.0000 12,103.00 819.000 10,647.00 1,499.000 19,487 049 RAPID SETTING CONCRETE (PATCH) CF 300.0000 6,600.00 0.000 0 PROGRAM CAS145 PAGE 3 DATE 10/22/14 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-286904 TIME 11:21 AM ESTIMATE NO. 32 BID OPENING 11/17/11 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/14 R.E. NAME: DOUGHLY JOE DATE OF THIS ESTIMATE 10/22/14 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 050 JOINT SEAL (MR 2") LF 65.0000 210,145.00 381.500 24,797.50 3,281.500 213,297 051 18" REINFORCED CONCRETE PIPE LF 70.0000 17,500.00 0.000 0 052 18" CORRUGATED STEEL PIPE RISER LF 800.0000 3,520.00 0.000 0 (.168" THICK) 053 18" STEEL FLARED END SECTION EA 1,100.0000 1,100.00 0.000 0 054 ROCK SLOPE PROTECTION (DRAINAGE OUTLET) CY 600.0000 2,400.00 0.000 0 055 MISCELLANEOUS IRON AND STEEL LB 2.0000 1,052.00 0.000 0 (F) 056 SPECIAL MARKER EA 100.0000 400.00 4.000 400.00 4.000 400 057 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.3500 148,750.00 398,776.000 139,571.60 398,776.000 139,571 058 8" THERMOPLASTIC TRAFFIC STRIPE LF 1.0000 12,300.00 10,237.000 10,237.00 10,237.000 10,237 (BROKEN 12-3) 059 THERMOPLASTIC PAVEMENT MARKING SQFT 3.4000 16,660.00 5,124.000 17,421.60 5,124.000 17,421 060 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.2000 81,000.00 410,201.000 82,040.20 410,201.000 82,040 (BROKEN 36-12) 061 8" THERMOPLASTIC TRAFFIC STRIPE LF 1.0000 15,600.00 15,820.000 15,820.00 15,820.000 15,820 (BROKEN 36-11.5) 062 PAINT TRAFFIC STRIPE (2-COAT) LF 0.3600 38,160.00 130,000.000 46,800 063 PAINT PAVEMENT MARKING (2-COAT) SQFT 3.5000 1,190.00 252.000 882 064 PAVEMENT MARKER (NON-REFLECTIVE) EA 1.1000 37,290.00 34,220.000 37,642.00 34,864.000 38,350 065 PAVEMENT MARKER (RETROREFLECTIVE) EA 3.0000 63,300.00 18,773.000 56,319.00 25,229.000 75,687 066 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 3,500.0000 3,500.00 0.000 0 SYSTEM ELEMENTS DURING CONSTRUCTION 067 MODIFY TRAFFIC MONITORING STATION LS 70,000.0000 70,000.00 0.692 48,440.00 0.692 48,440 068 MODIFY RAMP METERING SYSTEM LS 70,000.0000 70,000.00 0.619 43,330.00 0.619 43,330 069 MODIFY AUTOMATIC VEHICLE CLASSIFICATION LS 30,000.0000 30,000.00 0.000 0 STATION PROGRAM CAS145 PAGE 4 DATE 10/22/14 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-286904 TIME 11:21 AM ESTIMATE NO. 32 BID OPENING 11/17/11 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/14 R.E. NAME: DOUGHLY JOE DATE OF THIS ESTIMATE 10/22/14 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 1,058,888.63 62,959,375.15 ADJUSTMENT OF COMPENSATION 720.40 1,676,191.48 EXTRA WORK 0.00 339,328.30 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 1,059,609.03 64,974,894.93 070 MOBILIZATION LS 5,500,000.0000 5,500,000.00 1.000 5,500,000 ORIGINAL CONTRACT AMOUNT 67,665,955.00 TOTAL WORK COMPLETED 1,059,609.03 70,474,894.93 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 -79,430.00 TOTAL 1,059,609.03 70,395,464.93 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 01/18/12 650 04/27/12 02/02/12 11/01/14 697 193 59 0 91% 98% PROGRESS IS SATISFACTORY DOUGHLY JOE RESIDENT ENGINEER PROGRAM CAS145 DATE 10/22/14