PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 10/22/18 EST. NO. 005 TIME 03:32 PM R.E. NAME: GALLARDO, SAM 07-293704 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 10/22/18 EST. NO. 005 TIME 03:32 PM R.E. NAME: GALLARDO, SAM 07-293704 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- EQUAL EMPLOYMENT OPPORTUNITY EEO FHWA 1391 -100,000.00 004 FHWA 1391 100,000.00 005 100,000.00 0.00 TOTAL DEDUCTIONS 100,000.00 0.00 PROGRAM CAS145 PAGE 1 DATE 10/22/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-293704 TIME 03:32 PM ESTIMATE NO. 005 BID OPENING 01/23/18 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/18 R.E. NAME: GALLARDO, SAM DATE OF THIS ESTIMATE 10/22/18 LOCATION PROGRESS ESTIMATE 07-LA-110-8.0/9.0 ----------------- OHL USA, INC IN LOS ANGELES COUNTY, FROM 405/110 1920 MAIN STREET STE 310 INTERCHANGE TO TORRANCE BLVD IRVINE CA 92614 OFF-RAMP FED. AID NO. ACIM-X037(199)E WIDEN SHOULDER & AUXILIARY LANE ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 9,000.0000 9,000.00 1.000 9,000 002 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 10,000.0000 10,000.00 0.250 2,500 003 TIME-RELATED OVERHEAD (WDAY) WDAY 2,500.0000 1,125,000.00 19.000 47,500.00 100.000 250,000 004 CONSTRUCTION AREA SIGNS LS 20,000.0000 20,000.00 0.700 14,000 005 TRAFFIC CONTROL SYSTEM LS 150,000.0000 150,000.00 0.040 6,000.00 0.200 30,000 006 CHANNELIZER (SURFACE MOUNTED) EA 40.0000 5,200.00 92.000 3,680 007 TEMPORARY RAILING (TYPE K) LF 11.0000 226,600.00 6,340.000 69,740 008 TEMPORARY CRASH CUSHION MODULE EA 300.0000 57,000.00 67.000 20,100 009 JOB SITE MANAGEMENT LS 36,000.0000 36,000.00 0.040 1,440.00 0.200 7,200 010 PREPARE STORM WATER POLLUTION PREVENTION LS 3,500.0000 3,500.00 1.000 3,500 PLAN 011 STORM WATER SAMPLING AND ANALYSIS DAY EA 250.0000 8,750.00 0.000 0 012 STORM WATER ANNUAL REPORT EA 2,000.0000 8,000.00 0.000 0 013 MOVE-IN/MOVE-OUT EA 765.0000 7,650.00 1.000 765 (TEMPORARY EROSION CONTROL) 014 TEMPORARY HYDRAULIC MULCH SQYD 0.2700 3,996.00 0.000 0 015 TEMPORARY COVER SQYD 5.8700 86,876.00 0.000 0 016 TEMPORARY DRAINAGE INLET PROTECTION EA 255.0000 13,770.00 8.000 2,040.00 15.000 3,825 017 TEMPORARY FIBER ROLL LF 2.1100 19,095.50 1,025.000 2,162 018 TEMPORARY SILT FENCE LF 1.9300 12,545.00 200.000 386.00 2,922.000 5,639 019 TEMPORARY CONSTRUCTION ENTRANCE EA 4,500.0000 22,500.00 2.000 9,000 020 STREET SWEEPING LS 65,000.0000 65,000.00 0.040 2,600.00 0.200 13,000 021 TEMPORARY CONCRETE WASHOUT LS 50,000.0000 50,000.00 0.040 2,000.00 0.200 10,000 022 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 0.5600 5,712.00 4,890.000 2,738 STRIPE (HAZARDOUS WASTE) PROGRAM CAS145 PAGE 2 DATE 10/22/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-293704 TIME 03:32 PM ESTIMATE NO. 005 BID OPENING 01/23/18 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/18 R.E. NAME: GALLARDO, SAM DATE OF THIS ESTIMATE 10/22/18 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 TREATED WOOD WASTE LB 0.5100 12,444.00 2,408.000 1,228 024 REMOVE CONCRETE (CY) CY 88.0000 352.00 0.000 0 025 REMOVE CONCRETE (STRUCTURE) CY 110.0000 2,640.00 20.100 2,211 026 CLEARING AND GRUBBING (LS) LS 175,000.0000 175,000.00 1.000 175,000 027 ROADWAY EXCAVATION CY 24.9400 516,258.00 1,900.000 47,386.00 4,916.000 122,605 028 ROADWAY EXCAVATION (TYPE Y-1) CY 9.8000 70,952.00 1,125.000 11,025.00 1,125.000 11,025 (AERIALLY DEPOSITED LEAD) 029 STRUCTURE EXCAVATION (RETAINING WALL) CY 50.0000 221,500.00 300.000 15,000.00 1,100.000 55,000 (F) 030 STRUCTURE EXCAVATION (SOIL NAIL WALL) CY 21.0000 5,460.00 0.000 0 (F) 031 STRUCTURE EXCAVATION (GROUND ANCHOR CY 79.0000 55,300.00 0.000 0 (F) WALL) 032 STRUCTURE BACKFILL (RETAINING WALL) CY 49.2400 238,567.80 415.000 20,434 (F) 033 STRUCTURE BACKFILL (GROUND ANCHOR WALL) CY 31.0000 837.00 0.000 0 (F) 034 STRUCTURE BACKFILL (SOIL NAIL WALL) CY 43.0000 817.00 0.000 0 (F) 035 DITCH EXCAVATION CY 46.0000 3,910.00 0.000 0 036 IMPORTED BORROW (CY) CY 3.5000 9,765.00 0.000 0 037 ROADSIDE CLEARING LS 10,650.0000 10,650.00 0.000 0 038 ROCK BLANKET SQFT 9.0700 497,036.00 0.000 0 039 SLOW-RELEASE FERTILIZER LB 2.5000 1,400.00 0.000 0 040 PLANT (GROUP H) EA 0.7000 11,900.00 0.000 0 041 PLANT (GROUP B) EA 35.0000 16,450.00 0.000 0 042 PLANT (GROUP U) EA 150.0000 10,500.00 0.000 0 043 MAINTAIN EXISTING PLANTED AREAS LS 6,500.0000 6,500.00 0.040 260.00 0.200 1,300 044 PLANT ESTABLISHMENT WORK LS 25,000.0000 25,000.00 0.000 0 045 WOOD MULCH CY 47.0000 104,340.00 0.000 0 046 CHECK AND TEST EXISTING IRRIGATION LS 6,000.0000 6,000.00 1.000 6,000 FACILITIES 047 OPERATE EXISTING IRRIGATION FACILITIES LS 6,000.0000 6,000.00 0.040 240.00 0.200 1,200 048 REMOVE IRRIGATION FACILITY LS 1,000.0000 1,000.00 0.040 40.00 0.200 200 049 CONTROL AND NEUTRAL CONDUCTORS LS 16,500.0000 16,500.00 0.000 0 PROGRAM CAS145 PAGE 3 DATE 10/22/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-293704 TIME 03:32 PM ESTIMATE NO. 005 BID OPENING 01/23/18 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/18 R.E. NAME: GALLARDO, SAM DATE OF THIS ESTIMATE 10/22/18 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 050 3/4" REMOTE CONTROL VALVE EA 340.0000 1,700.00 0.000 0 051 1 1/2" REMOTE CONTROL VALVE EA 450.0000 2,700.00 0.000 0 052 2" REMOTE CONTROL VALVE EA 600.0000 600.00 0.000 0 053 RISER SPRINKLER ASSEMBLY (GEAR DRIVEN) EA 50.0000 900.00 0.000 0 054 RISER SPRINKLER ASSEMBLY EA 25.0000 13,750.00 0.000 0 055 3/4" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LF 4.0000 27,988.00 0.000 0 (F) LINE) 056 1" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LF 4.1500 8,930.80 0.000 0 (F) LINE) 057 1 1/4" PLASTIC PIPE (SCHEDULE 40) LF 4.5000 10,102.50 0.000 0 (F) (SUPPLY LINE) 058 1 1/2" PLASTIC PIPE (SCHEDULE 40) LF 5.0000 2,560.00 0.000 0 (F) (SUPPLY LINE) 059 2" PLASTIC PIPE (SCHEDULE 40) LF 6.5000 25,252.50 0.000 0 (F) (SUPPLY LINE) 060 BALL VALVE EA 250.0000 1,500.00 0.000 0 061 8" WELDED STEEL PIPE CONDUIT LF 105.0000 10,500.00 0.000 0 062 COMPOST (CY) CY 60.0000 2,040.00 0.000 0 063 INCORPORATE MATERIALS SQFT 0.2500 912.50 0.000 0 064 CLASS 3 AGGREGATE BASE (CY) CY 37.0000 311,910.00 814.100 30,121 065 LEAN CONCRETE BASE CY 230.0000 94,300.00 407.040 93,619 066 LEAN CONCRETE BASE RAPID SETTING CY 202.3200 793,094.40 0.000 0 067 BASE BOND BREAKER SQYD 1.3700 43,840.00 3,488.890 4,779 068 HOT MIX ASPHALT (TYPE A) TON 115.0000 116,150.00 0.000 0 069 RUBBERIZED HOT MIX ASPHALT (GAP GRADED) TON 164.0000 54,120.00 0.000 0 070 PLACE HOT MIX ASPHALT DIKE (TYPE C) LF 4.6000 5,520.00 0.000 0 071 PLACE HOT MIX ASPHALT DIKE (TYPE E) LF 4.6000 2,070.00 0.000 0 072 PLACE HOT MIX ASPHALT SQYD 80.0000 880.00 0.000 0 (MISCELLANEOUS AREA) 073 TACK COAT TON 1,380.0000 690.00 0.000 0 074 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 29.0000 14,500.00 0.000 0 075 JOINTED PLAIN CONCRETE PAVEMENT CY 275.0000 349,250.00 1,279.260 351,796 076 JOINTED PLAIN CONCRETE PAVEMENT CY 284.5000 3,101,050.00 824.230 234,493.44 824.230 234,493 (RSC) PROGRAM CAS145 PAGE 4 DATE 10/22/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-293704 TIME 03:32 PM ESTIMATE NO. 005 BID OPENING 01/23/18 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/18 R.E. NAME: GALLARDO, SAM DATE OF THIS ESTIMATE 10/22/18 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 077 DRILL AND BOND (DOWEL BAR) EA 100.0000 2,400.00 0.000 0 078 DRILL AND BOND (TIE BAR) EA 5.6000 127,120.00 0.000 0 079 ISOLATION JOINT SEAL (PREFORMED LF 7.3100 59,503.40 3,140.000 22,953 COMPRESSION) 080 GROUND ANCHOR (SUBHORIZONTAL) EA 3,243.1700 577,284.26 0.000 0 081 RESEARCH GROUND ANCHOR EA 10,700.0000 64,200.00 0.000 0 082 SOIL NAIL LF 40.5000 167,062.50 0.000 0 083 60" CAST-IN-DRILLED-HOLE CONCRETE LF 805.0000 20,125.00 0.000 0 PILE (SIGN FOUNDATION) 084 STRUCTURAL CONCRETE, RETAINING WALL CY 489.7800 1,000,130.76 145.000 71,018.10 332.000 162,606 (F) 085 STRUCTURAL CONCRETE, BOX CULVERT CY 1,300.0000 80,600.00 5.430 7,059.00 5.430 7,059 (F) 086 STRUCTURAL CONCRETE, HEADWALL CY 3,187.8700 12,751.48 0.000 0 (F) 087 STRUCTURAL CONCRETE, DRAINAGE INLET CY 1,381.2400 71,824.48 0.000 0 (F) 088 STRUCTURAL CONCRETE, FASCIA CY 710.0000 220,100.00 0.000 0 (F) 089 MINOR CONCRETE (MINOR STRUCTURE) CY 1,240.0000 107,880.00 8.260 10,242 (F) 090 MINOR CONCRETE (BACKFILL) CY 127.0000 43,434.00 0.000 0 (F) 091 CONCRETE SURFACE TEXTURE SQFT 29.0000 142,100.00 0.000 0 (F) (RIVER ROCK AND BUSH HAMMER) 092 BAR REINFORCING STEEL LB 1.8000 541.80 0.000 0 (F) 093 BAR REINFORCING STEEL (RETAINING WALL) LB 1.0500 296,184.00 20,000.000 21,000.00 47,980.000 50,379 (F) 094 BAR REINFORCING STEEL (BOX CULVERT) LB 1.0000 8,108.00 1,248.000 1,248.00 1,248.000 1,248 (F) 095 BAR REINFORCING STEEL (FASCIA) LB 1.2000 154,560.00 0.000 0 (F) 096 STRUCTURAL SHOTCRETE CY 713.0000 220,317.00 0.000 0 (F) 097 FURNISH SIGN STRUCTURE (TRUSS) LB 3.8000 161,614.00 0.000 0 (F) 098 INSTALL SIGN STRUCTURE (TRUSS) LB 0.2200 9,356.60 0.000 0 (F) 099 REMOVE SIGN STRUCTURE (EA) EA 3,920.0000 7,840.00 2.000 7,840.00 2.000 7,840 100 12" REINFORCED CONCRETE PIPE LF 94.0000 22,560.00 0.000 0 101 18" REINFORCED CONCRETE PIPE LF 77.0000 16,940.00 0.000 0 102 24" REINFORCED CONCRETE PIPE LF 78.0000 96,720.00 88.000 6,864 103 27" REINFORCED CONCRETE PIPE LF 285.0000 6,840.00 0.000 0 PROGRAM CAS145 PAGE 5 DATE 10/22/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-293704 TIME 03:32 PM ESTIMATE NO. 005 BID OPENING 01/23/18 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/18 R.E. NAME: GALLARDO, SAM DATE OF THIS ESTIMATE 10/22/18 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 104 GRATED LINE DRAIN LF 130.0000 75,400.00 409.000 53,170 105 36" PRECAST CONCRETE PIPE MANHOLE LF 1,220.0000 9,760.00 0.000 0 106 ABANDON PIPELINE (LF) LF 11.0000 5,830.00 0.000 0 107 REMOVE PIPE (LF) LF 29.0000 11,890.00 148.000 4,292 108 REMOVE INLET EA 480.0000 10,560.00 1.000 480 109 REMOVE HEADWALL EA 1,250.0000 7,500.00 2.000 2,500 110 REMOVE CONCRETE (CHANNEL) CY 110.0000 4,620.00 41.430 4,557 111 SAND BACKFILL CY 68.0000 4,216.00 0.000 0 112 REMOVE SLOPE PAVING (SQYD) SQYD 16.0000 32,800.00 2,046.000 32,736.00 2,046.000 32,736 113 CONCRETED-ROCK SLOPE PROTECTION CY 276.0000 16,284.00 0.000 0 (F) (FACING, METHOD A) (CY) 114 MINOR CONCRETE (GUTTER) (LF) LF 43.0900 24,561.30 0.000 0 115 MINOR CONCRETE (CROSS GUTTER) (RSC) CY 1,171.1900 35,135.70 0.000 0 116 MINOR CONCRETE (CURB AND GUTTER) CY 480.7400 62,496.20 0.000 0 117 MINOR CONCRETE (ISLAND PAVING) CY 680.9500 10,895.20 0.000 0 118 REMOVE CONCRETE (CURB AND GUTTER) LF 8.0000 44,080.00 1,150.000 9,200.00 1,150.000 9,200 119 MISCELLANEOUS IRON AND STEEL LB 1.6000 1,040.00 400.000 640 (F) 120 MISCELLANEOUS METAL LB 1.5000 25,770.00 0.000 0 (F) 121 PREPARE AND PAINT CONCRETE SQFT 4.0000 17,200.00 0.000 0 122 CHAIN LINK FENCE (TYPE CL-6) LF 25.0000 84,500.00 0.000 0 123 4' CHAIN LINK GATE (TYPE CL-6) EA 1,100.0000 4,400.00 0.000 0 124 CHAIN LINK FENCE LF 41.0000 52,070.00 0.000 0 (TYPE CL-8, EXTENSION ARM) 125 REMOVE CHAIN LINK FENCE LF 5.0000 23,250.00 0.000 0 126 REMOVE PAVEMENT MARKER EA 1.1100 9,568.20 1,632.000 1,811 127 DELINEATOR (CLASS 1) EA 38.7000 774.00 0.000 0 128 PAVEMENT MARKER (RETROREFLECTIVE) EA 2.2000 8,866.00 198.000 435 129 REMOVE ROADSIDE SIGN (WOOD POST) EA 96.9000 3,294.60 0.000 0 130 REMOVE ROADSIDE SIGN EA 76.5000 535.50 0.000 0 (STRAP AND SADDLE BRACKET METHOD) PROGRAM CAS145 PAGE 6 DATE 10/22/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-293704 TIME 03:32 PM ESTIMATE NO. 005 BID OPENING 01/23/18 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/18 R.E. NAME: GALLARDO, SAM DATE OF THIS ESTIMATE 10/22/18 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 131 REMOVE ROADSIDE SIGN PANEL EA 66.3000 198.90 0.000 0 132 FURNISH FORMED PANEL SIGN (OVERHEAD) SQFT 11.8400 4,854.40 0.000 0 FOR RETROREFLECTIVE SHEETING (TYPE XI) 133 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 11.4200 2,398.20 0.000 0 (0.063"-UNFRAMED) 134 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 7.0000 1,190.00 0.000 0 (0.063"-UNFRAMED) FOR RETROREFLECTIVE SHEETING (TYPE XI) 135 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 14.2800 171.36 0.000 0 (0.080"-UNFRAMED) 136 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 8.5700 1,971.10 0.000 0 (0.080"-UNFRAMED) FOR RETROREFLECTIVE SHEETING (TYPE XI) 137 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 19.6900 2,362.80 0.000 0 (0.063"-FRAMED) 138 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 16.2200 3,892.80 0.000 0 (0.080"-FRAMED) FOR RETROREFLECTIVE SHEETING (TYPE XI) 139 RETROREFLECTIVE SHEETING (TYPE XI) SQFT 5.3800 5,541.40 0.000 0 140 METAL (BARRIER MOUNTED SIGN) LB 12.7500 14,407.50 0.000 0 141 ROADSIDE SIGN - ONE POST EA 275.4000 10,465.20 0.000 0 142 ROADSIDE SIGN - TWO POST EA 622.2000 4,977.60 0.000 0 143 INSTALL SIGN (STRAP AND SADDLE BRACKET EA 127.5000 3,442.50 0.000 0 METHOD) 144 MIDWEST GUARDRAIL SYSTEM LF 28.5600 51,693.60 0.000 0 145 VEGETATION CONTROL (MINOR CONCRETE) SQYD 47.2000 16,048.00 0.000 0 146 CABLE RAILING LF 29.5800 9,051.48 0.000 0 (F) 147 TRANSITION RAILING (TYPE WB-31) EA 3,570.0000 14,280.00 0.000 0 148 END ANCHOR ASSEMBLY (TYPE SFT) EA 800.7000 1,601.40 0.000 0 149 SOFTSTOP TERMINAL SYSTEM EA 3,570.0000 3,570.00 0.000 0 150 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 151 ALTERNATIVE FLARED TERMINAL SYSTEM EA 3,570.7500 7,141.50 0.000 0 152 CRASH CUSHION (TYPE SCI-100GM) EA 39,100.7600 78,201.52 0.000 0 153 CRASH CUSHION (TYPE SCI-70GM) EA 32,679.0000 32,679.00 0.000 0 154 PORTABLE CONCRETE BARRIER (TYPE 60K) LF 63.3600 12,672.00 0.000 0 155 CONCRETE BARRIER (TYPE 60F) LF 405.9900 20,705.49 0.000 0 PROGRAM CAS145 PAGE 7 DATE 10/22/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-293704 TIME 03:32 PM ESTIMATE NO. 005 BID OPENING 01/23/18 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/18 R.E. NAME: GALLARDO, SAM DATE OF THIS ESTIMATE 10/22/18 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 156 CONCRETE BARRIER (TYPE 60) LF 67.0400 72,403.20 0.000 0 157 CONCRETE BARRIER (TYPE 60GE) LF 284.8900 128,200.50 0.000 0 158 CONCRETE BARRIER (TYPE 732B MODIFIED) LF 250.0800 12,504.00 0.000 0 (F) 159 CONCRETE BARRIER (TYPE 736A) LF 84.9500 189,268.60 0.000 0 (F) 160 CONCRETE BARRIER (TYPE 736B MODIFIED) LF 154.9100 233,139.55 0.000 0 (F) 161 CONCRETE BARRIER (TYPE 60D MODIFIED) LF 60.1700 36,342.68 0.000 0 (F) 162 REMOVE GUARDRAIL LF 6.3500 22,225.00 370.000 2,349 163 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.6700 49,915.00 22,072.000 14,788 164 8" THERMOPLASTIC TRAFFIC STRIPE LF 0.9000 13,950.00 335.000 301 165 8" THERMOPLASTIC TRAFFIC STRIPE LF 0.8800 3,520.00 0.000 0 (BROKEN 12-3) 166 THERMOPLASTIC PAVEMENT MARKING SQFT 4.9800 10,707.00 9.000 44 167 6" THERMOPLASTIC TRAFFIC STRIPE LF 2.7500 253.00 0.000 0 (BROKEN 6-1) 168 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.5500 36,190.00 0.000 0 (BROKEN 36-12) 169 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.5500 1,138.50 0.000 0 (BROKEN 17-7) 170 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 0.3300 32,274.00 4,346.000 1,434 171 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 1.6500 3,547.50 0.000 0 172 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 1,068.9700 1,068.97 0.160 171 SYSTEM ELEMENTS DURING CONSTRUCTION 173 SIGNAL AND LIGHTING SYSTEM LS 132,551.7200 132,551.72 0.000 0 174 MODIFYING EXISTING ELECTRICAL SYSTEM LS 641,379.3100 641,379.31 0.007 4,489 PROGRAM CAS145 PAGE 8 DATE 10/22/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-293704 TIME 03:32 PM ESTIMATE NO. 005 BID OPENING 01/23/18 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/18 R.E. NAME: GALLARDO, SAM DATE OF THIS ESTIMATE 10/22/18 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 520,511.54 1,970,459.07 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 520,511.54 1,970,459.07 175 MOBILIZATION LS 1,400,000.0000 1,400,000.00 0.250 350,000.00 0.750 1,050,000 ORIGINAL CONTRACT AMOUNT 16,579,574.26 TOTAL WORK COMPLETED 870,511.54 3,020,459.07 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 100,000.00 0.00 TOTAL 970,511.54 3,020,459.07 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 03/09/18 700 05/29/18 00/00/00 03/30/21 99 2 0 0 18% 14% PROGRESS IS SATISFACTORY GALLARDO, SAM RESIDENT ENGINEER PROGRAM CAS145 DATE 10/22/18