PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 03/23/17 EST. NO. 024 TIME 11:32 AM R.E. NAME: EID, EMILE 07-294704 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 004 0010 -318,943.13 A.C. @ U.P.(-) 031617 N 2009 0 0011 -307,919.10 092016 N 10 0 006 0008 29,392.00 E.W. @ U.P (+) 031617 N 6.5 0 -597,470.23 TOTAL THIS ESTIMATE 438,282.37 TOTAL PREVIOUS ESTIMATE -159,187.86 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 03/23/17 EST. NO. 024 TIME 11:32 AM R.E. NAME: EID, EMILE 07-294704 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE MISSING ANNUAL 4401 -10,000.00 009 MISSING ANNUAL 4401 10,000.00 011 EEO REPORTS -20,000.00 016 EEO REPORTS 20,000.00 017 LATE OPEN 9/20,21,23 -26,400.00 019 0.00 -26,400.00 EQUAL EMPLOYMENT OPPORTUNITY MISSING FHWA 1319 -10,000.00 003 MISSING FHWA 1391 10,000.00 004 0.00 0.00 LABOR COMPLIANCE VIOLATION CEM 2406 -5,000.00 020 0.00 -5,000.00 TOTAL DEDUCTIONS 0.00 -31,400.00 PROGRAM CAS145 PAGE 1 DATE 03/23/17 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-294704 TIME 11:32 AM ESTIMATE NO. 024 BID OPENING 08/21/14 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/17 R.E. NAME: EID, EMILE DATE OF THIS ESTIMATE 03/23/17 LOCATION PROGRESS ESTIMATE 07-LA-101-11.8/35.3 ----------------- MYERS AND SONS CONSTRUCTION, IN LA COUNTY FROM JUNCTION 170 TO LP VIRGENES CANYON ROAD 4600 NORTHGATE BLVD SACRAMENTO CA 95834 FED. AID NO. NHP-Q101(247)E SLAB REPLACEMENT/COLDPLANE AC O/L ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 2,500.0000 2,500.00 1.000 2,500 002 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 8,500.0000 8,500.00 0.829 7,046 003 TIME-RELATED OVERHEAD (WDAY) WDAY 3,000.0000 945,000.00 261.000 783,000 004 CONSTRUCTION AREA SIGNS LS 25,000.0000 25,000.00 0.829 20,725 005 TRAFFIC CONTROL SYSTEM LS 1,200,000.0000 1,200,000.00 0.829 994,800 006 CHANNELIZER (SURFACE MOUNTED) EA 18.0000 648.00 116.000 2,088 007 TEMPORARY TERMINAL SECTION (TYPE K) EA 2,000.0000 8,000.00 6.000 12,000 008 TEMPORARY RAILING (TYPE K) LF 50.0000 30,000.00 4,760.000 238,000 009 JOB SITE MANAGEMENT LS 30,000.0000 30,000.00 0.829 24,870 010 PREPARE STORM WATER POLLUTION PREVENTION LS 1,500.0000 1,500.00 1.000 1,500 PLAN 011 RAIN EVENT ACTION PLAN EA 500.0000 11,000.00 0.000 0 012 STORM WATER SAMPLING AND ANALYSIS DAY EA 450.0000 5,400.00 0.000 0 013 STORM WATER ANNUAL REPORT EA 2,000.0000 4,000.00 1.000 2,000 014 TEMPORARY DRAINAGE INLET PROTECTION EA 225.0000 130,500.00 217.000 48,825 015 TEMPORARY GRAVEL BAG BERM LF 7.0000 403,900.00 17,830.000 124,810.00 40,240.000 281,680 016 STREET SWEEPING LS 85,000.0000 85,000.00 0.829 70,465 017 TEMPORARY CONCRETE WASHOUT LS 30,000.0000 30,000.00 0.829 24,870 018 TREATED WOOD WASTE LB 0.0700 70,000.00 40,984.500 2,868.92 835,553.820 58,488 019 REMOVE GUARDRAIL LF 1.5000 165,000.00 955.990 1,433.99 90,717.250 136,075 020 REMOVE IRRIGATION FACILITY LS 4,500.0000 4,500.00 1.000 4,500.00 1.000 4,500 021 REMOVE ASPHALT CONCRETE DIKE LF 1.0000 106,000.00 43,390.330 43,390 022 REMOVE CONCRETE PAVEMENT AND BASE CY 75.0000 1,597,500.00 1,671.840 125,388.00 23,727.600 1,779,570 PROGRAM CAS145 PAGE 2 DATE 03/23/17 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-294704 TIME 11:32 AM ESTIMATE NO. 024 BID OPENING 08/21/14 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/17 R.E. NAME: EID, EMILE DATE OF THIS ESTIMATE 03/23/17 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 RESET CRASH CUSHION EA 300.0000 300.00 1.000 300 024 RELOCATE ROADSIDE SIGN-ONE POST EA 235.0000 470.00 2.000 470 025 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 1.7500 2,467,500.00 1,038,608.810 1,817,565 026 REMOVE CONCRETE CURB (CY) CY 100.0000 1,200.00 13.617 1,361 027 REMOVE CONCRETE BARRIER LF 50.0000 22,500.00 182.000 9,100 028 REMOVE CONCRETE CY 100.0000 5,700.00 0.000 0 (CURB, GUTTER, AND SIDEWALK) (CY) 029 ROADWAY EXCAVATION CY 50.0000 3,500.00 9.680 484 030 ROADWAY EXCAVATION (TYPE Z-2) CY 250.0000 40,000.00 168.400 42,100 (AERIALLY DEPOSITED LEAD) 031 CHECK AND TEST EXISTING IRRIGATION LS 10,000.0000 10,000.00 0.200 2,000.00 1.000 10,000 FACILITIES 032 CONTROL AND NEUTRAL CONDUCTORS LS 10,000.0000 10,000.00 0.800 8,000.00 0.800 8,000 033 1 1/4" REMOTE CONTROL VALVE EA 390.0000 390.00 0.000 0 034 1 1/2" REMOTE CONTROL VALVE EA 370.0000 370.00 0.000 0 035 TREE WELL SPRINKLER ASSEMBLY EA 70.0000 700.00 10.000 700.00 10.000 700 036 RISER SPRINKLER ASSEMBLY (GEAR DRIVEN) EA 80.0000 720.00 8.000 640.00 8.000 640 037 POP-UP SPRINKLER ASSEMBLY (GEAR DRIVEN) EA 95.0000 760.00 6.000 570.00 6.000 570 038 DRIP VALVE ASSEMBLY EA 400.0000 400.00 0.000 0 039 1 1/2" GATE VALVE EA 350.0000 350.00 0.000 0 040 2" GATE VALVE EA 460.0000 460.00 0.000 0 041 2 1/2" GATE VALVE EA 725.0000 725.00 0.000 0 042 3/4" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LF 10.0000 1,700.00 170.000 1,700.00 170.000 1,700 (F) LINE) 043 1" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LF 6.2500 1,875.00 300.000 1,875.00 300.000 1,875 (F) LINE) 044 1 1/4" PLASTIC PIPE (SCHEDULE 40) LF 25.0000 750.00 30.000 750.00 30.000 750 (F) (SUPPLY LINE) 045 1 1/2" PLASTIC PIPE (SCHEDULE 40) LF 8.7500 1,050.00 120.000 1,050.00 120.000 1,050 (F) (SUPPLY LINE) 046 2" PLASTIC PIPE (SCHEDULE 40) LF 9.0000 2,700.00 300.000 2,700.00 300.000 2,700 (F) (SUPPLY LINE) 047 2 1/2" PLASTIC PIPE (SCHEDULE 40) LF 14.0000 1,680.00 120.000 1,680.00 120.000 1,680 (F) (SUPPLY LINE) 048 6" PLASTIC PIPE (SCHEDULE 40) LF 400.0000 4,000.00 0.000 0 (F) (SUPPLY LINE) 049 8" PLASTIC PIPE (SCHEDULE 40) LF 350.0000 9,800.00 0.000 0 (F) (SUPPLY LINE) PROGRAM CAS145 PAGE 3 DATE 03/23/17 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-294704 TIME 11:32 AM ESTIMATE NO. 024 BID OPENING 08/21/14 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/17 R.E. NAME: EID, EMILE DATE OF THIS ESTIMATE 03/23/17 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 050 LEAN CONCRETE BASE CY 325.0000 35,750.00 110.000 35,750 051 ALTERNATIVE TREATED BASE CY 275.0000 1,534,500.00 787.040 216,436.00 12,014.830 3,304,078 052 REPLACE BASE CY 250.0000 1,080,000.00 0.000 0 053 BASE BOND BREAKER SQYD 2.0000 100,600.00 3,573.440 7,146.88 53,279.480 106,558 054 CRACK TREATMENT LNMI 2,200.0000 352,000.00 117.366 258,205 055 PREPAVING INERTIAL PROFILER LS 7,500.0000 7,500.00 0.800 6,000 056 REPLACE ASPHALT CONCRETE SURFACING CY 285.0000 131,100.00 0.000 0 057 HOT MIX ASPHALT, SUPERPAVE (TYPE A) TON 65.0000 135,850.00 542.920 35,289.80 706.680 45,934 058 RUBBERIZED HOT MIX ASPHALT, TON 100.0000 19,100,000.00 6,660.000 666,000.00 134,154.850 13,415,485 SUPERPAVE (GAP GRADED) 059 PLACE HOT MIX ASPHALT DIKE (TYPE A) LF 1.7500 73,150.00 1,883.000 3,295 060 PLACE HOT MIX ASPHALT DIKE (TYPE C) LF 1.7500 11,147.50 371.000 649.25 642.000 1,123 061 PLACE HOT MIX ASPHALT DIKE (TYPE D) LF 1.7500 1,277.50 626.000 1,095.50 877.000 1,534 062 PLACE HOT MIX ASPHALT DIKE (TYPE E) LF 1.7500 8,907.50 289.000 505 063 PLACE HOT MIX ASPHALT DIKE (TYPE F) LF 1.7500 90,650.00 28,289.000 49,505.75 30,715.000 53,751 064 PRECAST JOINTED CONCRETE PAVEMENT CY 480.0000 8,496,000.00 885.300 424,944.00 12,164.510 5,838,964 065 INDIVIDUAL PRECAST SLAB REPLACEMENT CY 785.0000 2,551,250.00 2,362.000 1,854,170 066 DOWEL BAR RETROFIT (JOINT) EA 50.0000 700,000.00 360.000 18,000 067 SPALL REPAIR (POLYESTER CONCRETE) SQYD 300.0000 447,000.00 1,268.900 380,670 068 ISOLATION JOINT SEAL (ASPHALT RUBBER) LF 3.5000 60,550.00 11,509.000 40,281.50 41,075.000 143,762 069 MINOR CONCRETE (MINOR STRUCTURE) CY 1,000.0000 76,000.00 71.400 71,400 (F) 070 MINOR CONCRETE (CURB) (CY) CY 1,450.0000 5,800.00 0.000 0 071 DETECTABLE WARNING SURFACE SQFT 40.0000 12,400.00 0.000 0 072 MINOR CONCRETE (CURB, GUTTER, SIDEWALK CY 900.0000 48,600.00 0.000 0 AND DRIVEWAY) 073 MINOR CONCRETE (TEXTURED PAVING) CY 800.0000 2,040,000.00 2,418.050 1,934,440 074 PRE/POST CONSTRUCTION SURVEYS EA 650.0000 10,400.00 0.000 0 075 4' CHAIN LINK GATE (TYPE CL-6) EA 500.0000 500.00 0.000 0 076 MIDWEST GUARDRAIL SYSTEM LF 19.0000 2,090,000.00 3,475.000 66,025.00 87,185.850 1,656,531 PROGRAM CAS145 PAGE 4 DATE 03/23/17 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-294704 TIME 11:32 AM ESTIMATE NO. 024 BID OPENING 08/21/14 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/17 R.E. NAME: EID, EMILE DATE OF THIS ESTIMATE 03/23/17 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 077 VEGETATION CONTROL (MINOR CONCRETE) SQYD 80.0000 768,000.00 11,646.160 931,692 078 CONCRETE BARRIER (TYPE 27 MODIFIED) LF 100.0000 43,000.00 507.410 50,741 (F) 079 CABLE RAILING LF 22.5000 7,875.00 0.000 0 080 TRANSITION RAILING (TYPE WB-31) EA 1,885.0000 162,110.00 7.000 13,195.00 62.000 116,870 081 END CAP (TYPE A) EA 225.0000 14,400.00 4.000 900.00 51.000 11,475 082 END ANCHOR ASSEMBLY (TYPE SFT) EA 375.0000 52,500.00 15.000 5,625.00 93.000 34,875 083 ALTERNATIVE IN-LINE TERMINAL SYSTEM EA 1,855.0000 150,255.00 0.000 0 084 ALTERNATIVE FLARED TERMINAL SYSTEM EA 1,545.0000 111,240.00 2.000 3,090.00 42.000 64,890 085 CONCRETE BARRIER (TYPE 60) LF 150.0000 88,500.00 507.500 76,125 086 CONCRETE BARRIER (TYPE 60D) LF 350.0000 2,450.00 7.000 2,450 087 CONCRETE BARRIER (TYPE 736 MODIFIED) LF 150.0000 12,300.00 102.500 15,375 (F) 088 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.2000 107,000.00 107,801.000 21,560 089 8" THERMOPLASTIC TRAFFIC STRIPE LF 0.5000 27,350.00 8,431.000 4,215 090 8" THERMOPLASTIC TRAFFIC STRIPE LF 0.4000 17,640.00 14,534.000 5,813 (BROKEN 12-3) 091 THERMOPLASTIC PAVEMENT MARKING SQFT 2.0000 18,820.00 5,501.000 11,002 092 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.1200 104,400.00 162,185.000 19,462 (BROKEN 36-12) 093 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.1200 1,716.00 878.520 105 (BROKEN 17-7) 094 PAVEMENT MARKER (NON-REFLECTIVE) EA 1.0000 73,000.00 12,452.000 12,452.00 42,265.000 42,265 095 PAVEMENT MARKER (RETROREFLECTIVE) EA 2.0000 60,600.00 3,113.000 6,226.00 12,857.000 25,714 096 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 1,000.0000 1,000.00 0.400 400 SYSTEM ELEMENTS DURING CONSTRUCTION 097 INDUCTIVE LOOP DETECTOR (REPLACEMTENT) LS 475,000.0000 475,000.00 0.007 3,325.00 0.147 69,825 098 MODIFY CHANGEABLE MESSAGE SIGN LS 55,000.0000 55,000.00 0.000 0 099 MODIFY AUTOMATIC VEHICLE CLASSIFICATION LS 40,000.0000 40,000.00 0.000 0 STATION 100 SYSTEM TESTING AND DOCUMENTATION LS 5,500.0000 5,500.00 0.000 0 101 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 102 CLASS 3 AGGREGATE BASE (CY) CY 75.0000 191,250.00 3,039.280 227,946 PROGRAM CAS145 PAGE 5 DATE 03/23/17 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-294704 TIME 11:32 AM ESTIMATE NO. 024 BID OPENING 08/21/14 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/17 R.E. NAME: EID, EMILE DATE OF THIS ESTIMATE 03/23/17 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 1,832,852.59 37,300,403.88 ADJUSTMENT OF COMPENSATION -626,862.23 -621,559.87 EXTRA WORK 29,392.00 462,372.01 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 1,235,382.36 37,141,216.02 103 MOBILIZATION LS 4,400,285.5000 4,400,285.50 1.000 4,400,285 ORIGINAL CONTRACT AMOUNT 53,645,672.00 TOTAL WORK COMPLETED 1,235,382.36 41,541,501.52 MATERIALS ON HAND ON SITE 444,123.46 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 -31,400.00 TOTAL 1,235,382.36 41,954,224.98 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 12/10/14 315 05/15/15 00/00/00 06/20/17 290 102 0 0 78% 92% PROGRESS IS SATISFACTORY EID, EMILE RESIDENT ENGINEER PROGRAM CAS145 DATE 03/23/17