PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 03/13/19 EST. NO. 010 TIME 04:32 PM R.E. NAME: DIPSIA, MICHAEL 07-296004 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 005 0019 2,100.43 E.W. @ F.A.(+) 031318 N 0019 0 0020 415.45 053018 N 0020 0 0021 674.50 061118 N 0021 0 006 0003 155.94 E.W. @ F.A.(+) 042418 N 0003 0 0004 280.62 042518 N 0004 0 0005 350.13 050318 N 0006 0 3,977.07 TOTAL THIS ESTIMATE 131,514.22 TOTAL PREVIOUS ESTIMATE 135,491.29 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 03/13/19 EST. NO. 010 TIME 04:32 PM R.E. NAME: DIPSIA, MICHAEL 07-296004 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- LABOR COMPLIANCE VIOLATION MISSING CPR'S -5,000.00 009 MISSING CPR'S 5,000.00 010 5,000.00 0.00 TOTAL DEDUCTIONS 5,000.00 0.00 PROGRAM CAS145 PAGE 1 DATE 03/13/19 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-296004 TIME 04:32 PM ESTIMATE NO. 010 BID OPENING 07/19/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/23/18 R.E. NAME: DIPSIA, MICHAEL DATE OF THIS ESTIMATE 03/13/19 LOCATION SEMI-FINAL ESTIMATE 07-LA-10-11.0/14.0 ------------------- HIGHLAND CONSTRUCTION, INC. IN LOS ANGELES COUNTY IN LOS 133 N. PIXLEY STREET ANGELES FROM WEST BOULEVARD ORANGE CA 92868 OVERCROSSING TO 0.2 MILE EAST OF VERMONT AVENUE UNDERCROSSING FED. AID NO. ACIM- 010-1(833)E ROADWAY SAFETY IMPROVEMENT ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 3,500.0000 3,500.00 1.000 3,500 002 CONSTRUCTION AREA SIGNS LS 17,325.0000 17,325.00 1.000 17,325 003 TRAFFIC CONTROL SYSTEM LS 137,150.0000 137,150.00 1.000 137,150 004 JOB SITE MANAGEMENT LS 2,250.0000 2,250.00 1.000 2,250 005 PREPARE STORM WATER POLLUTION PREVENTION LS 1,700.0000 1,700.00 1.000 1,700 PLAN 006 STORM WATER ANNUAL REPORT EA 2,000.0000 2,000.00 1.000 2,000 007 TEMPORARY DRAINAGE INLET PROTECTION EA 55.0000 8,250.00 61.000 3,355.00 91.000 5,005 008 TEMPORARY FIBER ROLL LF 2.5000 2,500.00 1,858.000 4,645 009 STREET SWEEPING LS 1,250.0000 1,250.00 1.000 1,250 010 TEMPORARY CONCRETE WASHOUT LS 5,710.0000 5,710.00 1.000 5,710 011 TREATED WOOD WASTE LB 1.0000 1,380.00 1,380.000 1,380.00 1,380.000 1,380 012 REMOVE CONCRETE (CY) CY 175.0000 49,000.00 104.000 18,200.00 344.230 60,240 013 CLEARING AND GRUBBING (LS) LS 11,250.0000 11,250.00 1.000 11,250 014 ROADWAY EXCAVATION (TYPE Z-2) CY 203.0000 113,680.00 0.000 0 (AERIALLY DEPOSITED LEAD) 015 ROCK BLANKET SQFT 14.8000 516,520.00 33,189.070 491,198 016 CHECK AND TEST EXISTING IRRIGATION LS 5,000.0000 5,000.00 1.000 5,000 FACILITIES 017 REMOVE IRRIGATION FACILITY LS 550.0000 550.00 1.000 550 018 SLOPE PAVING (CONCRETE) CY 541.0000 162,300.00 283.500 153,373 019 MINOR CONCRETE (MISCELLANEOUS CY 500.0000 55,000.00 106.000 53,000 CONSTRUCTION) 020 REMOVE ROADSIDE SIGN (WOOD POST) EA 100.0000 2,300.00 22.000 2,200 021 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 14.0000 266.00 19.000 266 (0.063"-UNFRAMED) 022 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 15.0000 4,500.00 300.000 4,500 (0.080"-FRAMED) FOR RETROREFLECTIVE SHEETING (TYPE XI) PROGRAM CAS145 PAGE 2 DATE 03/13/19 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-296004 TIME 04:32 PM ESTIMATE NO. 010 BID OPENING 07/19/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/23/18 R.E. NAME: DIPSIA, MICHAEL DATE OF THIS ESTIMATE 03/13/19 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 11.0000 2,200.00 200.000 2,200 (0.080"-UNFRAMED) FOR RETROREFLECTIVE SHEETING (TYPE XI) 024 RETROREFLECTIVE SHEETING (TYPE XI) SQFT 6.0000 2,940.00 490.000 2,940 025 METAL (ROADSIDE SIGN) LB 13.0000 39,780.00 3,060.000 39,780 026 VEGETATION CONTROL (MINOR CONCRETE) SQYD 60.0000 145,200.00 0.000 0 027 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 10.0000 10.00 1.000 10 SYSTEM ELEMENTS DURING CONSTRUCTION PROGRAM CAS145 PAGE 3 DATE 03/13/19 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-296004 TIME 04:32 PM ESTIMATE NO. 010 BID OPENING 07/19/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/23/18 R.E. NAME: DIPSIA, MICHAEL DATE OF THIS ESTIMATE 03/13/19 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 22,935.00 1,008,422.99 ADJUSTMENT OF COMPENSATION 0.00 99,458.03 EXTRA WORK 3,977.07 36,033.26 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 26,912.07 1,143,914.28 028 MOBILIZATION LS 97,500.0000 97,500.00 1.000 97,500 ORIGINAL CONTRACT AMOUNT 1,391,011.00 TOTAL WORK COMPLETED 26,912.07 1,241,414.28 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 5,000.00 0.00 TOTAL 31,912.07 1,241,414.28 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN JOB COM- WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR PLETED ON DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 09/12/17 120 11/03/17 10/03/17 07/23/18 109 67 0 0 100% 100% DIPSIA, MICHAEL RESIDENT ENGINEER PROGRAM CAS145 DATE 03/13/19