PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 11/23/15 EST. NO. 001 TIME 07:09 AM R.E. NAME: SAYKALI, ZARIF 07-2W7004 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 11/23/15 EST. NO. 001 TIME 07:09 AM R.E. NAME: SAYKALI, ZARIF 07-2W7004 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 11/23/15 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-2W7004 TIME 07:09 AM ESTIMATE NO. 001 BID OPENING 06/17/15 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/20/15 R.E. NAME: SAYKALI, ZARIF DATE OF THIS ESTIMATE 11/23/15 LOCATION PROGRESS ESTIMATE 07-LA-10-0.0/ .0 ----------------- PETERSON-CHASE GENERAL IN LA @ VAR LOCS ENGINEERING CONSTRUCTION, INC. 1792 KAISER AVENUE IRVINE CA 92614 FED. AID NO. NHP-X037(176)E JT SEAL,METH DECK,SPALL REPR,EPOXY ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 1,760.0000 1,760.00 0.000 0 002 CONSTRUCTION AREA SIGNS LS 21,500.0000 21,500.00 0.500 10,750.00 0.500 10,750 003 TRAFFIC CONTROL SYSTEM LS 174,000.0000 174,000.00 0.000 0 004 JOB SITE MANAGEMENT LS 720.0000 720.00 0.000 0 005 PREPARE WATER POLLUTION CONTROL PROGRAM LS 600.0000 600.00 0.000 0 006 TEMPORARY CONCRETE WASHOUT LS 930.0000 930.00 0.000 0 007 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 0.6400 10,700.80 0.000 0 STRIPE (HAZARDOUS WASTE) 008 WORK AREA MONITORING (BRIDGE) LS 14,700.0000 14,700.00 0.000 0 009 PUBLIC SAFETY PLAN LS 8,000.0000 8,000.00 0.000 0 010 INJECT CRACK (EPOXY) LF 103.0000 35,535.00 0.000 0 011 RAPID SETTING CONCRETE (PATCH) CF 26.6000 18,487.00 0.000 0 012 REPAIR SPALLED SURFACE AREA SQFT 390.0000 3,510.00 0.000 0 013 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 0.4100 10,045.00 0.000 0 014 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 1.1700 2,889.90 0.000 0 015 REMOVE PAVEMENT MARKER EA 1.1700 3,135.60 0.000 0 016 REMOVE UNSOUND CONCRETE CF 25.4000 17,653.00 0.000 0 017 PREPARE CONCRETE BRIDGE DECK SURFACE SQFT 0.1300 35,332.05 0.000 0 018 TREAT BRIDGE DECK SQFT 0.2800 76,099.80 0.000 0 (F) 019 FURNISH BRIDGE DECK TREATMENT MATERIAL GAL 42.5000 144,925.00 0.000 0 020 BRIDGE REMOVAL (PORTION) LS 1,240.0000 1,240.00 0.000 0 021 CLEAN EXPANSION JOINT LF 23.4000 43,430.40 0.000 0 022 JOINT SEAL (MR 1/2") LF 26.0000 1,456.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 11/23/15 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-2W7004 TIME 07:09 AM ESTIMATE NO. 001 BID OPENING 06/17/15 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/20/15 R.E. NAME: SAYKALI, ZARIF DATE OF THIS ESTIMATE 11/23/15 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 JOINT SEAL (MR 1") LF 26.3000 10,046.60 0.000 0 024 JOINT SEAL (MR 1 1/2") LF 54.0000 64,476.00 0.000 0 025 JOINT SEAL (MR 2") LF 68.0000 15,232.00 0.000 0 026 CLEAN STRUCTURAL STEEL (EXISTING BRIDGE) LS 70,000.0000 70,000.00 0.000 0 027 PAINT STRUCTURAL STEEL (EXISTING BRIDGE) LS 49,000.0000 49,000.00 0.000 0 028 SPOT BLAST CLEAN AND PAINT UNDERCOAT SQFT 41.0000 45,920.00 0.000 0 029 MISCELLANEOUS METAL (BRIDGE) LB 16.0000 1,600.00 0.000 0 (F) 030 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.5300 16,218.00 0.000 0 031 8" THERMOPLASTIC TRAFFIC STRIPE LF 1.1700 5,662.80 0.000 0 032 THERMOPLASTIC PAVEMENT MARKING SQFT 4.1000 10,701.00 0.000 0 033 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.5900 2,424.90 0.000 0 (BROKEN 36-12) 034 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.6400 1,350.40 0.000 0 (BROKEN 17-7) 035 PAVEMENT MARKER (NON-REFLECTIVE) EA 1.7600 1,742.40 0.000 0 036 PAVEMENT MARKER (RETROREFLECTIVE) EA 3.5000 5,635.00 0.000 0 037 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 540.0000 540.00 0.000 0 SYSTEM ELEMENTS DURING CONSTRUCTION PROGRAM CAS145 PAGE 3 DATE 11/23/15 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-2W7004 TIME 07:09 AM ESTIMATE NO. 001 BID OPENING 06/17/15 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/20/15 R.E. NAME: SAYKALI, ZARIF DATE OF THIS ESTIMATE 11/23/15 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 10,750.00 10,750.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 10,750.00 10,750.00 038 MOBILIZATION LS 59,000.0000 59,000.00 0.000 0 ORIGINAL CONTRACT AMOUNT 986,198.65 TOTAL WORK COMPLETED 10,750.00 10,750.00 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 10,750.00 10,750.00 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 07/29/15 110 08/13/15 00/00/00 04/16/16 110 1 0 38 1% 65% PROGRESS IS SATISFACTORY CCO TIME PENDING SAYKALI, ZARIF RESIDENT ENGINEER PROGRAM CAS145 DATE 11/23/15