PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 02/22/13 EST. NO.02 TIME 02:48 PM R.E. NAME: SAAD, HUSSEIN 07-2X9204 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 02/22/13 EST. NO.02 TIME 02:48 PM R.E. NAME: SAAD, HUSSEIN 07-2X9204 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 02/22/13 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-2X9204 TIME 02:48 PM ESTIMATE NO. 02 BID OPENING 03/22/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/13 R.E. NAME: SAAD, HUSSEIN DATE OF THIS ESTIMATE 02/22/13 LOCATION PROGRESS ESTIMATE 07-LA-91-9.7/11.7 ----------------- AUTOBAHN CONSTRUCTION INC IN LOS ANGELES COUNTY IN COMPTON P O BOX 11238 AND LONG BEACH AT VARIOUS LOCATIONS SANTA ANA, CA 927111238 FROMA ACACIA AVENUE UNDERCROSSING TO LOS ANGELES RIVER FED. AID NO. ACST-47B2(4)E ,P-47B2(4)E HIGHWAY PLANTING AND IRRIGATION ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 TEMPORARY FENCE (TYPE CL-6) LF 9.0000 10,170.00 0.000 0 002 TEMPORARY FENCE (TYPE ESA) LF 6.0000 2,100.00 0.000 0 003 CONSTRUCTION SITE MANAGEMENT LS 5,000.0000 5,000.00 0.000 0 004 PREPARE STORM WATER POLLUTION LS 3,000.0000 3,000.00 1.000 3,000 PREVENTION PLAN 005 TEMPORARY FIBER ROLL LF 5.0000 5,000.00 0.000 0 006 TEMPORARY SILT FENCE LF 5.0000 5,000.00 0.000 0 007 TEMPORARY GRAVEL BAG BERM LF 6.0000 4,200.00 0.000 0 008 TEMPORARY CONSTRUCTION ENTRANCE EA 1,500.0000 9,000.00 0.000 0 009 TEMPORARY COVER SQYD 5.0000 500.00 0.000 0 010 TEMPORARY DRAINAGE INLET PROTECTION EA 500.0000 7,500.00 0.000 0 011 STREET SWEEPING LS 58,000.0000 58,000.00 0.000 0 012 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 5,000.0000 5,000.00 0.000 0 013 RAIN EVENT ACTION PLAN EA 500.0000 11,500.00 0.000 0 014 STORM WATER ANNUAL REPORT EA 2,000.0000 4,000.00 0.000 0 015 STORM WATER SAMPLING AND ANALYSIS DAY EA 500.0000 4,500.00 0.000 0 016 CONSTRUCTION AREA SIGNS LS 9,000.0000 9,000.00 0.000 0 017 TRAFFIC CONTROL SYSTEM LS 125,000.0000 125,000.00 0.000 0 018 TYPE III BARRICADE EA 200.0000 400.00 0.000 0 019 REMOVE ASPHALT CONCRETE DIKE LF 10.0000 3,300.00 0.000 0 020 RECONSTRUCT CHAIN LINK FENCE LF 45.0000 15,750.00 0.000 0 021 RESET ROADSIDE SIGN (WOOD POST) EA 500.0000 1,500.00 0.000 0 022 CLEARING AND GRUBBING (LS) LS 15,000.0000 15,000.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 02/22/13 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-2X9204 TIME 02:48 PM ESTIMATE NO. 02 BID OPENING 03/22/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/13 R.E. NAME: SAAD, HUSSEIN DATE OF THIS ESTIMATE 02/22/13 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 ROADWAY EXCAVATION CY 15.0000 31,500.00 0.000 0 024 LEAD COMPLIANCE PLAN LS 1,500.0000 1,500.00 1.000 1,500 025 SHOULDER BACKING TON 1,000.0000 5,000.00 0.000 0 026 IMPORTED BORROW (CY) CY 5.0000 10,500.00 0.000 0 027 HIGHWAY PLANTING LS 70,000.0000 70,000.00 0.000 0 028 ROCK BLANKET SQYD 105.0000 403,200.00 0.000 0 029 PLANT ESTABLISHMENT WORK LS 40,000.0000 40,000.00 0.000 0 030 IRRIGATION SYSTEM LS 75,000.0000 75,000.00 0.000 0 031 WATER METER EA 44,000.0000 88,000.00 1.000 44,000.00 1.000 44,000 032 AGGREGATE BASE CEMENT SLURRY CY 250.0000 14,500.00 0.000 0 033 LEAN CONCRETE BASE RAPID SETTING CY 250.0000 7,250.00 0.000 0 034 HOT MIX ASPHALT (TYPE A) TON 800.0000 29,600.00 0.000 0 035 PLACE HOT MIX ASPHALT DIKE (TYPE C) LF 15.0000 945.00 0.000 0 036 PLACE HOT MIX ASPHALT DIKE (TYPE F) LF 15.0000 4,950.00 0.000 0 037 PLACE HOT MIX ASPHALT SQYD 150.0000 2,700.00 0.000 0 (MISCELLANEOUS AREA) 038 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 500.0000 500.00 0.000 0 SYSTEM ELEMENTS DURING CONSTRUCTION PROGRAM CAS145 PAGE 3 DATE 02/22/13 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-2X9204 TIME 02:48 PM ESTIMATE NO. 02 BID OPENING 03/22/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/13 R.E. NAME: SAAD, HUSSEIN DATE OF THIS ESTIMATE 02/22/13 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 44,000.00 48,500.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 44,000.00 48,500.00 039 MOBILIZATION LS 75,000.0000 75,000.00 0.500 37,500.00 0.500 37,500 ORIGINAL CONTRACT AMOUNT 1,164,565.00 TOTAL WORK COMPLETED 81,500.00 86,000.00 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 81,500.00 86,000.00 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 06/12/12 400 00/00/00 08/06/12 07/31/14 54 76 0 0 7% 14% PROGRESS IS SATISFACTORY SAAD, HUSSEIN RESIDENT ENGINEER PROGRAM CAS145 DATE 02/22/13