PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 08/22/08 EST. NO.01 TIME 12:50 PM R.E. NAME: SAAD, HUSSEIN 07-2Y5204 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 08/22/08 EST. NO.01 TIME 12:50 PM R.E. NAME: SAAD, HUSSEIN 07-2Y5204 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 08/22/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-2Y5204 TIME 12:50 PM ESTIMATE NO. 01 BID OPENING 04/17/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/08 R.E. NAME: SAAD, HUSSEIN DATE OF THIS ESTIMATE 08/22/08 LOCATION PROGRESS ESTIMATE 07-LA-47-L0.0/R2.4 ----------------- ALL AMERICAN ASPHALT IN LOS ANGELES COUNTY IN LOS P O BOX 2229 ANGELES AT VARIOUS LOCATIONS ON CORONA CA 928782229 ROUTE 110 AND ROUTE 47 FED. AID NO. N O N E HOT MIX ASPHALT OVERLAY ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 CONSTRUCTION SITE MANAGEMENT LS 4,200.0000 4,200.00 0.000 0.00 02 PREPARE WATER POLLUTION CONTROL LS 700.0000 700.00 0.500 350.00 0.500 350.00 S) PROGRAM 03 STREET SWEEPING LS 4,000.0000 4,000.00 0.000 0.00 04 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 635.0000 635.00 0.000 0.00 05 CONSTRUCTION AREA SIGNS LS 5,300.0000 5,300.00 0.000 0.00 S) 06 TRAFFIC CONTROL SYSTEM LS 26,150.0000 26,150.00 0.000 0.00 S) 07 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 0.5000 3,830.00 0.000 0.00 S) STRIPE 08 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 0.5000 7,950.00 0.000 0.00 S) 09 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 1.3000 4,433.00 0.000 0.00 S) 10 REMOVE PAVEMENT MARKER EA 1.1000 737.00 0.000 0.00 S) 11 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 2.1400 78,752.00 0.000 0.00 S) 12 LEAD COMPLIANCE PLAN LS 1,500.0000 1,500.00 0.500 750.00 0.500 750.00 13 SEAL RANDOM CRACKS LNMI 1,250.0000 6,125.00 0.000 0.00 14 REPLACE ASPHALT CONCRETE SURFACING CY 425.0000 5,950.00 0.000 0.00 15 RUBBERIZED HOT MIX ASPHALT (GAP GRADED) TON 101.0000 401,980.00 0.000 0.00 16 REPLACE CONCRETE PAVEMENT CY 1,900.0000 34,200.00 0.000 0.00 (RAPID STRENGTH CONCRETE) 17 GRIND EXISTING CONCRETE SQYD 43.0000 3,698.00 0.000 0.00 S) PAVEMENT 18 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.2600 8,216.00 0.000 0.00 S) 19 8" THERMOPLASTIC TRAFFIC STRIPE LF 0.5000 2,010.00 0.000 0.00 S) 20 THERMOPLASTIC PAVEMENT MARKING SQFT 2.1000 9,471.00 0.000 0.00 S) 21 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.2000 112.00 0.000 0.00 S) (BROKEN 36-12) 22 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.2000 1,198.00 0.000 0.00 S) (BROKEN 17-7) PROGRAM CAS145 PAGE 2 DATE 08/22/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-2Y5204 TIME 12:50 PM ESTIMATE NO. 01 BID OPENING 04/17/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/08 R.E. NAME: SAAD, HUSSEIN DATE OF THIS ESTIMATE 08/22/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 8" THERMOPLASTIC TRAFFIC STRIPE LF 0.5000 600.00 0.000 0.00 S) (BROKEN 36-12) 24 PAVEMENT MARKER (NON-REFLECTIVE) EA 1.0000 46.00 0.000 0.00 S) 25 PAVEMENT MARKER (RETROREFLECTIVE) EA 3.1000 3,007.00 0.000 0.00 S) 26 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 900.0000 900.00 0.000 0.00 S) SYSTEM ELEMENTS DURING CONSTRUCTION 27 INDUCTIVE LOOP DETECTOR LS 5,300.0000 5,300.00 0.000 0.00 S) PROGRAM CAS145 PAGE 3 DATE 08/22/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-2Y5204 TIME 12:50 PM ESTIMATE NO. 01 BID OPENING 04/17/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/08 R.E. NAME: SAAD, HUSSEIN DATE OF THIS ESTIMATE 08/22/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 1,100.00 1,100.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 1,100.00 1,100.00 28 MOBILIZATION LS 24,000.0000 24,000.00 0.000 0.00 ORIGINAL CONTRACT AMOUNT 645,000.00 TOTAL WORK COMPLETED 1,100.00 1,100.00 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 1,100.00 1,100.00 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 05/21/08 90 00/00/00 06/05/08 10/14/08 54 0 0 0 0% 60% PROGRESS UNSATISFACTORY SAAD, HUSSEIN RESIDENT ENGINEER PROGRAM CAS145 PAGE 3 DATE 08/22/08