PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 09/30/20 EST. NO. 006 TIME 06:01 PM R.E. NAME: SHIN, FRANK 07-304904 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 09/30/20 EST. NO. 006 TIME 06:01 PM R.E. NAME: SHIN, FRANK 07-304904 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 09/30/20 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-304904 TIME 06:01 PM ESTIMATE NO. 006 BID OPENING 11/05/19 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/22/20 R.E. NAME: SHIN, FRANK DATE OF THIS ESTIMATE 09/30/20 LOCATION FINAL ESTIMATE 07-LA-1-39.2/55.7 -------------- YAKAR IN LOS ANGELES COUNTY AT VARIOUS 689 EAST SAN BERNARDINO RD; LOCATIONS COVINA CA 91703 FED. AID NO. N O N E CONSTRUCTION OF BMP DEVICES ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 2,400.0000 2,400.00 1.000 2,400 002 CONSTRUCTION AREA SIGNS LS 41,000.0000 41,000.00 1.000 41,000 003 TRAFFIC CONTROL SYSTEM LS 120,000.0000 120,000.00 1.000 120,000 004 JOB SITE MANAGEMENT LS 2,000.0000 2,000.00 1.000 2,000 005 PREPARE WATER POLLUTION CONTROL PROGRAM LS 2,400.0000 2,400.00 1.000 2,400 006 TEMPORARY DRAINAGE INLET PROTECTION EA 200.0000 3,200.00 16.000 3,200 007 TEMPORARY FIBER ROLL LF 4.0000 18,400.00 4,615.000 18,460 008 TEMPORARY SILT FENCE LF 7.0000 12,600.00 1,800.000 12,600 009 STREET SWEEPING LS 500.0000 500.00 1.000 500 010 ROADWAY EXCAVATION CY 68.0000 142,800.00 2,100.000 142,800 011 ROADWAY EXCAVATION (TYPE Z-2) CY 350.0000 26,600.00 79.000 27,650 (AERIALLY DEPOSITED LEAD) 012 ROADSIDE CLEARING LS 48,000.0000 48,000.00 1.000 48,000 013 CLASS 2 AGGREGATE BASE (CY) CY 85.0000 74,800.00 866.000 73,610 014 REMOVE ASPHALT CONCRETE DIKE LF 7.0000 2,870.00 422.000 2,954 015 CLASS 3 PERMEABLE MATERIAL (BLANKET) CY 85.0000 102,000.00 1,200.000 102,000 (F) 016 MODIFY INLET EA 3,200.0000 3,200.00 1.000 3,200 017 ROCK SLOPE PROTECTION CY 400.0000 4,000.00 10.500 4,200 (20 LB, CLASS I, METHOD B) (CY) 018 ROCK SLOPE PROTECTION FABRIC (CLASS 8) SQYD 15.0000 750.00 50.000 750 PROGRAM CAS145 PAGE 2 DATE 09/30/20 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-304904 TIME 06:01 PM ESTIMATE NO. 006 BID OPENING 11/05/19 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/22/20 R.E. NAME: SHIN, FRANK DATE OF THIS ESTIMATE 09/30/20 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 0.00 607,724.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 8,569.55 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 0.00 616,293.55 019 MOBILIZATION LS 45,000.0000 45,000.00 1.000 45,000 ORIGINAL CONTRACT AMOUNT 652,520.00 TOTAL WORK COMPLETED 0.00 661,293.55 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 0.00 661,293.55 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN JOB COM- WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR PLETED ON DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 12/24/19 120 03/09/20 01/08/20 06/22/20 62 52 0 0 100% 100% SHIN, FRANK RESIDENT ENGINEER PROGRAM CAS145 DATE 09/30/20