PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 03/22/23 EST. NO. 004 TIME 11:31 AM R.E. NAME: BAUTISTA DENRICK 07-319304 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 03/22/23 EST. NO. 004 TIME 11:31 AM R.E. NAME: BAUTISTA DENRICK 07-319304 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 03/22/23 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-319304 TIME 11:31 AM ESTIMATE NO. 004 BID OPENING 09/14/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/23 R.E. NAME: BAUTISTA DENRICK DATE OF THIS ESTIMATE 03/22/23 LOCATION PROGRESS ESTIMATE 07-LA-5-0.0/19.5 ----------------- RE CHAFFEE CONSTRUCTION INC. FROM COUNTY LINE TO BROADWAY, 1253 EVERGREEN RD; REDUCE SEVERITY COLLISIONS WRIGHTWOOD CA 92397 FED. AID NO. HSST-X037(224)E REDUCE SEVERITY COLLISIONS BY ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 1,250.0000 1,250.00 0.000 0 002 TIME-RELATED OVERHEAD (WDAY) WDAY 1,200.0000 216,000.00 12.000 14,400.00 48.000 57,600 003 CONSTRUCTION AREA SIGNS LS 423,000.0000 423,000.00 0.100 42,300.00 0.200 84,600 004 TRAFFIC CONTROL SYSTEM LS 653,000.0000 653,000.00 0.100 65,300.00 0.200 130,600 005 PORTABLE RADAR SPEED FEEDBACK SIGN EA 417.0000 70,890.00 0.000 0 SYSTEM DAY 006 JOB SITE MANAGEMENT LS 14,400.0000 14,400.00 0.100 1,440.00 0.200 2,880 007 PREPARE WATER POLLUTION CONTROL PROGRAM LS 11,000.0000 11,000.00 0.750 8,250 008 TREATED WOOD WASTE LB 2.8500 9,832.50 150.000 427.50 150.000 427 009 REMOVE ROADSIDE SIGN (WOOD POST) EA 113.0000 8,475.00 3.000 339.00 3.000 339 010 REMOVE ROADSIDE SIGN (METAL POST) EA 143.0000 2,717.00 0.000 0 011 REMOVE ROADSIDE SIGN EA 175.0000 5,425.00 0.000 0 (STRAP AND SADDLE BRACKET METHOD) 012 RELOCATE SIGN PANEL EA 700.0000 700.00 0.000 0 013 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 10.7100 361,998.00 1,363.000 14,597.73 1,363.000 14,597 (0.063"-UNFRAMED) 014 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 17.5000 23,625.00 64.000 1,120.00 64.000 1,120 (0.080"-UNFRAMED) 015 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 34.4500 8,612.50 0.000 0 (0.080"-FRAMED) 016 METAL (ROADSIDE SIGN) LB 6.0000 241,200.00 1,800.000 10,800.00 1,800.000 10,800 017 ROADSIDE SIGN - ONE POST EA 455.0000 1,465,100.00 55.000 25,025.00 55.000 25,025 018 ROADSIDE SIGN - TWO POST EA 1,700.0000 15,300.00 0.000 0 019 INSTALL SIGN (STRAP AND SADDLE BRACKET EA 184.0000 20,240.00 11.000 2,024.00 11.000 2,024 METHOD) PROGRAM CAS145 PAGE 2 DATE 03/22/23 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-319304 TIME 11:31 AM ESTIMATE NO. 004 BID OPENING 09/14/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/23 R.E. NAME: BAUTISTA DENRICK DATE OF THIS ESTIMATE 03/22/23 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 177,773.23 338,263.23 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 177,773.23 338,263.23 020 MOBILIZATION LS 245,000.0000 245,000.00 0.500 122,500 ORIGINAL CONTRACT AMOUNT 3,797,765.00 TOTAL WORK COMPLETED 177,773.23 460,763.23 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 177,773.23 460,763.23 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 11/18/22 180 00/00/00 12/05/22 09/26/23 48 23 0 0 12% 27% PROGRESS IS SATISFACTORY BAUTISTA DENRICK RESIDENT ENGINEER