PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 03/05/25 EST. NO. 020 TIME 12:51 PM R.E. NAME: HERRERA, EDGAR 07-329804 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 03/05/25 EST. NO. 020 TIME 12:51 PM R.E. NAME: HERRERA, EDGAR 07-329804 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 03/05/25 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-329804 TIME 12:51 PM ESTIMATE NO. 020 BID OPENING 10/19/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/26/24 R.E. NAME: HERRERA, EDGAR DATE OF THIS ESTIMATE 03/05/25 LOCATION FINAL ESTIMATE 07-LA-110-0.0/31.9 -------------- PETERSON-CHASE GENERAL IN LOS ANGELES COUNTY, IN VARIOUS ENGINEERING CONSTRUCTION, INC. CITIES, FROM 9TH STREET/GAFFEY 16351 CONSTRUCTION CIR W STREET TO END OF FREEWAY IRVINE CA 92606 FED. AID NO. ACNH-P110(23)E OVERHEAD GUIDE SIGNS & LIGHTING ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 1,500.0000 1,500.00 1.000 1,500 002 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 4,000.0000 4,000.00 1.000 4,000 003 TIME-RELATED OVERHEAD (WDAY) WDAY 600.0000 180,000.00 300.000 180,000 004 DISPUTE RESOLUTION ADVISOR ON-SITE EA 2,000.0000 8,000.00 0.000 0 MEETING 005 HOURLY OFF-SITE HR 200.0000 2,000.00 0.000 0 DISPUTE-RESOLUTION-ADVISOR-RELATED TASKS 006 CONSTRUCTION AREA SIGNS LS 18,000.0000 18,000.00 1.000 18,000 007 TRAFFIC CONTROL SYSTEM LS 481,600.0000 481,600.00 1.000 481,600 008 STATIONARY IMPACT ATTENUATOR VEHICLE DAY 400.0000 120,000.00 300.000 120,000 009 PORTABLE RADAR SPEED FEEDBACK SIGN EA 100.0000 1,000.00 0.000 0 SYSTEM DAY 010 PORTABLE CHANGEABLE MESSAGE SIGN (EA) EA 100.0000 1,000.00 10.000 1,000 011 JOB SITE MANAGEMENT LS 4,500.0000 4,500.00 1.000 4,500 012 PREPARE WATER POLLUTION CONTROL PROGRAM LS 1,100.0000 1,100.00 1.000 1,100 013 TREATED WOOD WASTE LB 0.5000 5,250.00 8,510.000 4,255 014 PRUNE EXISTING PLANTS LS 5,000.0000 5,000.00 1.000 5,000 015 REMOVE SIGN STRUCTURE WALKWAY (EA) EA 550.0000 82,500.00 147.000 80,850 016 MISCELLANEOUS METAL LB 18.0000 19,530.00 1,085.000 19,530 (F) 017 REMOVE ROADSIDE SIGN (WOOD POST) EA 70.0000 11,200.00 160.000 11,200 018 REMOVE ROADSIDE SIGN EA 50.0000 6,000.00 120.000 6,000 (STRAP AND SADDLE BRACKET METHOD) 019 REMOVE ROADSIDE SIGN PANEL EA 120.0000 19,200.00 160.000 19,200 020 REMOVE ROADSIDE SIGN (STEEL POST) EA 80.0000 5,600.00 70.000 5,600 021 REMOVE SIGN FROM SIGN FRAME EA 350.0000 150,500.00 430.000 150,500 022 FURNISH FORMED PANEL SIGN (OVERHEAD) SQFT 15.5000 291,400.00 18,799.670 291,394 PROGRAM CAS145 PAGE 2 DATE 03/05/25 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-329804 TIME 12:51 PM ESTIMATE NO. 020 BID OPENING 10/19/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/26/24 R.E. NAME: HERRERA, EDGAR DATE OF THIS ESTIMATE 03/05/25 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 FURNISH LAMINATED PANEL SIGN (1"-TYPE A) SQFT 25.0000 787,500.00 36,820.400 920,510 024 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 11.7500 95,057.50 8,090.000 95,057 (0.063"-UNFRAMED) 025 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 12.7500 34,935.00 2,740.500 34,941 (0.080"-UNFRAMED) 026 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 17.5000 26,600.00 1,519.700 26,594 (0.063"-FRAMED) 027 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 18.5000 3,515.00 190.000 3,515 (0.080"-FRAMED) 028 METAL (BARRIER MOUNTED SIGN) LB 24.0000 328,800.00 13,699.560 328,789 029 ROADSIDE SIGN - ONE POST EA 395.0000 169,850.00 398.000 157,210 030 ROADSIDE SIGN - TWO POST EA 950.0000 19,000.00 20.000 19,000 031 INSTALL SIGN (STRAP AND SADDLE BRACKET EA 200.0000 36,000.00 138.000 27,600 METHOD) 032 INSTALL SIGN PANEL ON EXISTING FRAME SQFT 8.8000 452,320.00 9,892.300 87,052.24 51,400.000 452,320 033 INSTALL ROADSIDE SIGN PANEL ON EA 300.0000 1,800.00 6.000 1,800 EXISTING POST 034 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 5,500.0000 5,500.00 1.000 5,500 SYSTEM ELEMENTS DURING CONSTRUCTION 035 REMOVING SIGN ILLUMINATION SYSTEMS LS 112,000.0000 112,000.00 1.000 112,000 PROGRAM CAS145 PAGE 3 DATE 03/05/25 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-329804 TIME 12:51 PM ESTIMATE NO. 020 BID OPENING 10/19/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/26/24 R.E. NAME: HERRERA, EDGAR DATE OF THIS ESTIMATE 03/05/25 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 87,052.24 3,590,067.96 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 303,162.05 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 87,052.24 3,893,230.01 036 MOBILIZATION LS 60,000.0000 60,000.00 1.000 60,000 ORIGINAL CONTRACT AMOUNT 3,551,757.50 TOTAL WORK COMPLETED 87,052.24 3,953,230.01 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 87,052.24 3,953,230.01 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN JOB COM- WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR PLETED ON DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 01/06/22 300 01/21/22 01/21/22 06/26/24 288 317 0 0 100% 100% HERRERA, EDGAR RESIDENT ENGINEER