PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 06/18/20 EST. NO. 002 TIME 05:59 PM R.E. NAME: TURAY, SULAIMAN 07-330204 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 06/18/20 EST. NO. 002 TIME 05:59 PM R.E. NAME: TURAY, SULAIMAN 07-330204 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 06/18/20 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-330204 TIME 05:59 PM ESTIMATE NO. 002 BID OPENING 08/29/18 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/20 R.E. NAME: TURAY, SULAIMAN DATE OF THIS ESTIMATE 06/18/20 LOCATION PROGRESS ESTIMATE 07-LA-1-6.5/6.5 ----------------- PTM GENERAL ENGINEERING IN LOS ANGELES IN LONG BEACH, SERVICES, INC. INTERSECTION OF PACIFIC COAST HWY 5942 ACORN ST. AND PACIFIC AVENUE RIVERSIDE CA 92504 FED. AID NO. SSTH-P001(646)E MODIFY SIGNALS ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 1,500.0000 1,500.00 0.500 750 002 CONSTRUCTION AREA SIGNS LS 8,000.0000 8,000.00 0.500 4,000 003 TRAFFIC CONTROL SYSTEM LS 12,604.0000 12,604.00 0.100 1,260.40 0.200 2,520 004 TEMPORARY PEDESTRIAN ACCESS ROUTE LS 500.0000 500.00 0.000 0 005 JOB SITE MANAGEMENT LS 750.0000 750.00 0.100 75.00 0.200 150 006 PREPARE WATER POLLUTION CONTROL PROGRAM LS 1,250.0000 1,250.00 0.500 625 007 TEMPORARY DRAINAGE INLET PROTECTION EA 150.0000 450.00 0.000 0 008 TEMPORARY FIBER ROLL LF 3.0000 360.00 0.000 0 009 TEMPORARY GRAVEL BAG BERM LF 3.5000 280.00 0.000 0 010 TEMPORARY CONCRETE WASHOUT LS 500.0000 500.00 0.000 0 011 HEALTH AND SAFETY PLAN LS 500.0000 500.00 1.000 500 012 MATERIALS AND LIQUIDS CONTAMINATED LS 500.0000 500.00 1.000 500 013 THERMOPLASTIC PAVEMENT MARKING SQFT 22.0000 3,740.00 0.000 0 014 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 19.0000 1,520.00 0.000 0 015 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 575.0000 575.00 0.000 0 SYSTEM ELEMENTS DURING CONSTRUCTION 016 MODIFYING EXISTING ELECTRICAL SYSTEM LS 186,000.0000 186,000.00 0.300 55,800.00 0.400 74,400 PROGRAM CAS145 PAGE 2 DATE 06/18/20 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-330204 TIME 05:59 PM ESTIMATE NO. 002 BID OPENING 08/29/18 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/20 R.E. NAME: TURAY, SULAIMAN DATE OF THIS ESTIMATE 06/18/20 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 57,135.40 83,445.80 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 57,135.40 83,445.80 017 MOBILIZATION LS 10,000.0000 10,000.00 0.200 2,000.00 0.950 9,500 ORIGINAL CONTRACT AMOUNT 229,029.00 TOTAL WORK COMPLETED 59,135.40 92,945.80 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 59,135.40 92,945.80 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 10/08/18 60 11/29/18 10/22/18 08/07/20 32 387 0 0 41% 53% PROGRESS IS SATISFACTORY TURAY, SULAIMAN RESIDENT ENGINEER PROGRAM CAS145 DATE 06/18/20