PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 06/19/23 EST. NO. 006 TIME 02:59 PM R.E. NAME: FERRER, JOSE 07-331804 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 06/19/23 EST. NO. 006 TIME 02:59 PM R.E. NAME: FERRER, JOSE 07-331804 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 06/19/23 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-331804 TIME 02:59 PM ESTIMATE NO. 006 BID OPENING 08/03/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/23 R.E. NAME: FERRER, JOSE DATE OF THIS ESTIMATE 06/19/23 LOCATION PROGRESS ESTIMATE 07-LA-710-26.0/R26.7 ----------------- GRIFFITH COMPANY IN LOS ANGELES COUNTY IN AND NEAR 3050 EAST BIRCH STREET MONTEREY PARK ON RTE 10 FROM 0.1 BREA, CA 92821 MILE EAST OF NORTH EASTERN AVE TO 0.2 MILE WEST OF SOUTH GARVEY AVE AND ON RTE 710 FROM 0.3 MILE SOUTH FED. AID NO. ACIM-X037(229)E INSTALL IRRIGATION SYSTEMS, EROSION ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 2,200.0000 2,200.00 1.000 2,200 002 TIME-RELATED OVERHEAD (WDAY) WDAY 366.0000 91,500.00 21.000 7,686.00 71.000 25,986 003 DISPUTE RESOLUTION ADVISOR ON-SITE EA 2,000.0000 2,000.00 0.000 0 MEETING 004 HOURLY OFF-SITE HR 200.0000 1,600.00 0.000 0 DISPUTE-RESOLUTION-ADVISOR-RELATED TASKS 005 CONSTRUCTION AREA SIGNS LS 30,700.0000 30,700.00 0.500 15,350 006 TRAFFIC CONTROL SYSTEM LS 155,000.0000 155,000.00 0.080 12,400.00 0.280 43,400 007 JOB SITE MANAGEMENT LS 16,800.0000 16,800.00 0.080 1,344.00 0.280 4,704 008 PREPARE STORM WATER POLLUTION PREVENTION LS 1,500.0000 1,500.00 0.750 1,125 PLAN 009 RAIN EVENT ACTION PLAN EA 500.0000 3,000.00 5.000 2,500 010 STORM WATER SAMPLING AND ANALYSIS DAY EA 355.0000 3,550.00 0.000 0 011 STORM WATER ANNUAL REPORT EA 2,000.0000 6,000.00 0.000 0 012 TEMPORARY HYDRAULIC MULCH SQYD 0.6400 17,088.00 0.000 0 013 TEMPORARY DRAINAGE INLET PROTECTION EA 230.0000 920.00 6.000 1,380.00 20.000 4,600 014 TEMPORARY FIBER ROLL LF 2.9000 9,280.00 2,900.000 8,410.00 10,000.000 29,000 015 STREET SWEEPING LS 5,400.0000 5,400.00 0.080 432.00 0.280 1,512 016 TEMPORARY CONCRETE WASHOUT LS 1,400.0000 1,400.00 0.000 0 017 ROADWAY EXCAVATION (TYPE Z-2) CY 475.0000 85,500.00 0.000 0 (AERIALLY DEPOSITED LEAD) 018 ROADSIDE CLEARING LS 177,000.0000 177,000.00 0.050 8,850.00 0.500 88,500 019 PACKET FERTILIZER EA 0.1400 670.60 0.000 0 020 SLOW-RELEASE FERTILIZER LB 0.7700 1,971.20 0.000 0 021 PLANT (GROUP H) EA 0.9100 95,550.00 0.000 0 022 PLANT (GROUP A) EA 10.1500 12,484.50 0.000 0 PROGRAM CAS145 PAGE 2 DATE 06/19/23 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-331804 TIME 02:59 PM ESTIMATE NO. 006 BID OPENING 08/03/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/23 R.E. NAME: FERRER, JOSE DATE OF THIS ESTIMATE 06/19/23 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 PLANT (GROUP B) EA 35.0000 3,325.00 0.000 0 024 PLANT (GROUP U) EA 185.0000 15,170.00 0.000 0 025 MAINTAIN EXISTING PLANTED AREAS LS 18,000.0000 18,000.00 0.000 0 026 PLANT ESTABLISHMENT WORK (MINIMUM BID) LS 200,000.0000 200,000.00 0.000 0 027 WOOD MULCH CY 44.0000 545,600.00 0.000 0 028 CHECK AND TEST EXISTING IRRIGATION LS 7,200.0000 7,200.00 1.000 7,200 FACILITIES 029 REMOVE IRRIGATION FACILITY LS 4,500.0000 4,500.00 0.330 1,485.00 0.330 1,485 030 CONTROL AND NEUTRAL CONDUCTORS LS 38,000.0000 38,000.00 0.110 4,180 031 1" REMOTE CONTROL VALVE EA 500.0000 4,000.00 1.000 500.00 3.000 1,500 032 1 1/2" REMOTE CONTROL VALVE EA 530.0000 37,630.00 11.000 5,830.00 22.000 11,660 033 3" REMOTE CONTROL VALVE EA 750.0000 750.00 0.000 0 034 24-32 STATION IRRIGATION CONTROLLER EA 11,700.0000 70,200.00 1.000 11,700.00 1.000 11,700 (PEDESTAL MOUNTED) 035 IRRIGATION CONTROLLER ENCLOSURE EA 450.0000 2,700.00 1.000 450.00 1.000 450 CABINET 036 3" BACKFLOW PREVENTER ASSEMBLY EA 12,250.0000 12,250.00 0.000 0 037 TREE WELL SPRINKLER ASSEMBLY EA 40.0000 8,800.00 4.000 160.00 21.000 840 038 RISER SPRINKLER ASSEMBLY (GEAR DRIVEN) EA 63.0000 38,430.00 32.000 2,016.00 147.000 9,261 039 RISER SPRINKLER ASSEMBLY EA 46.0000 1,886.00 7.000 322 040 2 1/2" GATE VALVE EA 732.0000 8,784.00 2.000 1,464.00 2.000 1,464 041 1" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LF 5.6300 124,147.13 5,389.000 30,340 (F) LINE) 042 1 1/2" PLASTIC PIPE (SCHEDULE 40) LF 7.0400 55,876.48 2,889.000 20,338 (F) (SUPPLY LINE) 043 2" PLASTIC PIPE (SCHEDULE 40) LF 7.9300 87,142.77 4,140.000 32,830 (F) (SUPPLY LINE) 044 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 045 2 1/2" PLASTIC PIPE (CLASS 315) LF 12.2500 98,416.50 1,549.000 18,975.25 3,866.000 47,358 (F) (SUPPLY LINE) 046 BALL VALVE EA 470.0000 8,930.00 4.000 1,880.00 8.000 3,760 047 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 048 HYDROMULCH SQFT 0.0700 7,630.00 0.000 0 049 COMPOST (CY) CY 60.0000 19,380.00 0.000 0 PROGRAM CAS145 PAGE 3 DATE 06/19/23 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-331804 TIME 02:59 PM ESTIMATE NO. 006 BID OPENING 08/03/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/23 R.E. NAME: FERRER, JOSE DATE OF THIS ESTIMATE 06/19/23 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 050 MINOR CONCRETE (STAMPED CONCRETE) SQFT 12.2300 174,889.00 0.000 0 051 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 5,000.0000 5,000.00 0.000 0 SYSTEM ELEMENTS DURING CONSTRUCTION 052 MODIFYING ELECTRIC SERVICE FOR LS 122,000.0000 122,000.00 0.000 0 IRRIGATION 053 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 054 6" WELDED STEEL PIPE CONDUIT LF 250.0000 80,000.00 155.000 38,750.00 155.000 38,750 PROGRAM CAS145 PAGE 4 DATE 06/19/23 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-331804 TIME 02:59 PM ESTIMATE NO. 006 BID OPENING 08/03/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/23 R.E. NAME: FERRER, JOSE DATE OF THIS ESTIMATE 06/19/23 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 123,712.25 442,316.33 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 123,712.25 442,316.33 055 MOBILIZATION LS 125,000.0000 125,000.00 0.750 93,750 ORIGINAL CONTRACT AMOUNT 2,646,751.18 TOTAL WORK COMPLETED 123,712.25 536,066.33 MATERIALS ON HAND ON SITE -5,735.00 11,673.00 DEDUCTIONS 0.00 0.00 TOTAL 117,977.25 547,739.33 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 11/18/22 1000 01/12/23 01/12/23 04/22/24 71 38 0 0 20% 7% PROGRESS IS SATISFACTORY FERRER, JOSE RESIDENT ENGINEER