PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 01/24/23 EST. NO. 001 TIME 02:20 PM R.E. NAME: SHIN, FRANK 07-332004 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 01/24/23 EST. NO. 001 TIME 02:20 PM R.E. NAME: SHIN, FRANK 07-332004 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 01/24/23 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-332004 TIME 02:20 PM ESTIMATE NO. 001 BID OPENING 08/10/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 01/20/23 R.E. NAME: SHIN, FRANK DATE OF THIS ESTIMATE 01/24/23 LOCATION RERUN PROGRESS ESTIMATE 07-LA-10-R4.5/R5.5 ----------------------- MARINA LANDSCAPE, INC. IN THE CITY OF LOS ANGELES FROM 3707 W. GARDEN GROVE BLVD; BUNDY DRIVE TO SEPULVEDA BOULEVARD ORANGE CA 92868 UNDERCROSSING; AND ON RTE 405 FROM OLYMPIC BLVD TO NATIONAL BLVD UNDERCROSSING FED. AID NO. N O N E INSTALL IRRIGATION SYSTEM AND PLANT ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 1,600.0000 1,600.00 1.000 1,600.00 1.000 1,600 002 TIME-RELATED OVERHEAD (WDAY) WDAY 200.0000 50,000.00 14.000 2,800.00 14.000 2,800 003 CONSTRUCTION AREA SIGNS LS 33,000.0000 33,000.00 0.800 26,400.00 0.800 26,400 004 TRAFFIC CONTROL SYSTEM LS 115,000.0000 115,000.00 0.000 0 005 JOB SITE MANAGEMENT LS 18,000.0000 18,000.00 0.150 2,700.00 0.150 2,700 006 PREPARE STORM WATER POLLUTION PREVENTION LS 3,000.0000 3,000.00 0.500 1,500.00 0.500 1,500 PLAN 007 STORM WATER ANNUAL REPORT EA 2,000.0000 6,000.00 0.000 0 008 TEMPORARY COVER SQYD 4.0000 12,800.00 0.000 0 009 TEMPORARY FIBER ROLL LF 1.8000 9,900.00 0.000 0 010 ROADWAY EXCAVATION (TYPE Z-2) CY 440.0000 12,320.00 0.000 0 (AERIALLY DEPOSITED LEAD) 011 ROADSIDE CLEARING LS 150,000.0000 150,000.00 0.000 0 012 PRUNE EXISTING PLANTS LS 300,000.0000 300,000.00 0.000 0 013 ROCK BLANKET SQFT 22.0000 93,280.00 0.000 0 014 SLOW-RELEASE FERTILIZER LB 2.0000 1,280.00 0.000 0 015 PLANT (GROUP H) EA 0.5000 30,000.00 0.000 0 016 PLANT (GROUP B) EA 21.0000 8,610.00 0.000 0 017 PLANT (GROUP U) EA 130.0000 10,140.00 0.000 0 018 PLANT ESTABLISHMENT WORK (MINIMUM BID) LS 150,000.0000 150,000.00 0.000 0 019 WOOD MULCH CY 55.0000 133,100.00 0.000 0 020 CHECK AND TEST EXISTING IRRIGATION LS 20,000.0000 20,000.00 1.000 20,000.00 1.000 20,000 FACILITIES 021 OPERATE EXISTING IRRIGATION FACILITIES LS 13,000.0000 13,000.00 0.000 0 022 REMOVE IRRIGATION FACILITY LS 2,000.0000 2,000.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 01/24/23 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-332004 TIME 02:20 PM ESTIMATE NO. 001 BID OPENING 08/10/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 01/20/23 R.E. NAME: SHIN, FRANK DATE OF THIS ESTIMATE 01/24/23 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 CONTROL AND NEUTRAL CONDUCTORS LS 40,000.0000 40,000.00 0.000 0 024 3/4" REMOTE CONTROL VALVE EA 650.0000 3,900.00 0.000 0 025 1" REMOTE CONTROL VALVE EA 700.0000 1,400.00 0.000 0 026 1 1/2" REMOTE CONTROL VALVE EA 800.0000 4,800.00 0.000 0 027 RISER SPRINKLER ASSEMBLY (GEAR DRIVEN) EA 65.0000 2,210.00 0.000 0 028 RISER SPRINKLER ASSEMBLY EA 25.0000 12,000.00 0.000 0 029 3/4" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LF 7.0000 50,946.00 0.000 0 (F) LINE) 030 1" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LF 4.5000 8,149.50 0.000 0 (F) LINE) 031 1 1/4" PLASTIC PIPE (SCHEDULE 40) LF 4.0000 3,340.00 0.000 0 (F) (SUPPLY LINE) 032 1 1/2" PLASTIC PIPE (SCHEDULE 40) LF 13.0000 2,691.00 0.000 0 (F) (SUPPLY LINE) 033 BALL VALVE EA 700.0000 1,400.00 0.000 0 034 COMPOST (CY) CY 100.0000 600.00 0.000 0 035 INCORPORATE MATERIALS SQFT 0.7000 420.00 0.000 0 036 HOT MIX ASPHALT (TYPE A) TON 115.0000 195.50 0.000 0 037 PLACE HOT MIX ASPHALT SQYD 310.0000 3,720.00 0.000 0 (MISCELLANEOUS AREA) 038 REMOVE ASPHALT CONCRETE PAVEMENT (SQFT) SQFT 150.0000 2,700.00 0.000 0 039 STRUCTURAL CONCRETE, DRAINAGE INLET CY 7,000.0000 8,400.00 0.000 0 (F) 040 18" CORRUGATED STEEL PIPE (.079" THICK) LF 140.0000 1,260.00 0.000 0 041 ROCK SLOPE PROTECTION CY 250.0000 400.00 0.000 0 (60 LB, CLASS II, METHOD B) (CY) 042 ROCK SLOPE PROTECTION FABRIC (CLASS 8) SQYD 7.0000 56.00 0.000 0 043 REMOVE CONCRETE CURB (LF) LF 180.0000 1,080.00 0.000 0 044 MISCELLANEOUS IRON AND STEEL LB 8.0000 2,104.00 0.000 0 (F) 045 TREATMENT BEST MANAGEMENT EA 300.0000 600.00 0.000 0 PRACTICE MARKER 046 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 047 PORTABLE RADAR SPEED FEEDBACK SIGN EA 110.0000 13,200.00 0.000 0 SYSTEM DAY 048 HEALTH AND SAFETY PLAN LS 2,800.0000 2,800.00 0.000 0 PROGRAM CAS145 PAGE 3 DATE 01/24/23 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-332004 TIME 02:20 PM ESTIMATE NO. 001 BID OPENING 08/10/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 01/20/23 R.E. NAME: SHIN, FRANK DATE OF THIS ESTIMATE 01/24/23 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 55,000.00 55,000.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 55,000.00 55,000.00 049 MOBILIZATION LS 122,000.0000 122,000.00 0.000 0 ORIGINAL CONTRACT AMOUNT 1,463,402.00 TOTAL WORK COMPLETED 55,000.00 55,000.00 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 55,000.00 55,000.00 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 09/27/22 1000 11/28/22 11/21/22 01/03/24 14 26 0 0 4% 6% PROGRESS IS SATISFACTORY SHIN, FRANK RESIDENT ENGINEER