PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 10/22/26 EST. NO. 017 TIME 09:14 PM R.E. NAME: ALONZO, BERNARD 07-351114 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0004 2,772.88 E.W. @ F.A.(+) 052026 N 460462 0005 7,603.54 071726 N 460544 0006 9,089.79 072026 N 460547 0007 1,198.82 070226 N 460550 0008 6,121.97 072826 N 462355 26,787.00 TOTAL THIS ESTIMATE 21,752.40 TOTAL PREVIOUS ESTIMATE 48,539.40 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 10/22/26 EST. NO. 017 TIME 09:14 PM R.E. NAME: ALONZO, BERNARD 07-351114 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE MOBILIZATION TEMP -267,910.00 002 ANNUAL 2025 CEM 4401 -10,000.00 008 ANNUAL 2025 CEM 4401 10,000.00 009 CPM UPDATE SCHEDULE -30,000.00 012 MOBILIZATION TEMP 267,910.00 014 CPM UPDATE SCHEDULE 30,000.00 017 30,000.00 0.00 OVERBID ITEMS OVERBID ITEM NO. 023 -2,090.00 002 OVERBID ITEM NO. 023 -1,045.00 004 OVERBID ITEM NO. 023 -836.00 008 OVERBID ITEM NO. 023 -209.00 014 0.00 -4,180.00 TOTAL DEDUCTIONS 30,000.00 -4,180.00 PROGRAM CAS145 PAGE 1 DATE 10/22/26 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-351114 TIME 09:14 PM ESTIMATE NO. 017 BID OPENING 09/17/24 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/26 R.E. NAME: ALONZO, BERNARD DATE OF THIS ESTIMATE 10/22/26 LOCATION RERUN PROGRESS ESTIMATE 07-VAR ----------------------- CALPROMAX ENGINEERING, INC. LOS ANGELES COUNTY AT VARIOUS LOCATIONS 650 N. ROSE DR. #186 PLACENTIA CA 92870 FED. AID NO. N O N E INSTALL AND UPGRADE CAMERA SYSTEMS. ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 2,400.0000 2,400.00 0.700 1,680.00 1.000 2,400 002 LEVEL 2 CRITICAL PATH METHOD SCHEDULE LS 12,000.0000 12,000.00 0.500 6,000.00 0.700 8,400 003 TIME-RELATED OVERHEAD (WDAY) WDAY 120.0000 36,000.00 5.000 600.00 249.000 29,880 004 DISPUTE RESOLUTION ADVISOR ON-SITE EA 2,000.0000 16,000.00 1.000 2,000.00 3.000 6,000 MEETING 005 HOURLY OFF-SITE HR 200.0000 2,000.00 0.000 0 DISPUTE-RESOLUTION-ADVISOR-RELATED TASKS 006 CONSTRUCTION AREA SIGNS LS 84,000.0000 84,000.00 0.300 25,200.00 0.800 67,200 007 TRAFFIC CONTROL SYSTEM LS 480,000.0000 480,000.00 0.100 48,000.00 0.802 384,960 008 PORTABLE RADAR SPEED FEEDBACK SIGN DAY 200.0000 2,600.00 13.000 2,600.00 13.000 2,600 SYSTEM 009 JOB SITE MANAGEMENT LS 12,000.0000 12,000.00 0.680 8,160.00 0.800 9,600 010 WATER POLLUTION CONTROL PROGRAM LS 3,600.0000 3,600.00 0.600 2,160.00 0.800 2,880 011 TEMPORARY DRAINAGE INLET PROTECTION EA 600.0000 2,400.00 4.000 2,400.00 4.000 2,400 012 TEMPORARY FIBER ROLL LF 15.0000 4,500.00 300.000 4,500.00 300.000 4,500 013 TREATED WOOD WASTE LB 6.0000 9,360.00 1,560.000 9,360.00 1,560.000 9,360 014 ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY CY 3,000.0000 12,000.00 4.000 12,000.00 4.000 12,000 DEPOSITED LEAD) 015 MIDWEST GUARDRAIL SYSTEM (WOOD POST) LF 72.0000 21,600.00 150.000 10,800.00 300.000 21,600 016 VEGETATION CONTROL MAT (RUBBER OR FIBER) SQYD 240.0000 48,000.00 100.000 24,000.00 100.000 24,000 017 END ANCHOR ASSEMBLY (TYPE SFT-M) EA 2,500.0000 5,000.00 1.000 2,500.00 2.000 5,000 018 ALTERNATIVE IN-LINE TERMINAL TL-3 EA 5,600.0000 11,200.00 1.000 5,600.00 2.000 11,200 019 REMOVE GUARDRAIL LF 18.0000 2,340.00 65.000 1,170.00 130.000 2,340 020 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 1,200.0000 1,200.00 0.200 240.00 0.800 960 SYSTEM ELEMENTS DURING CONSTRUCTION 021 CAMERA SYSTEMS LS 450,000.0000 450,000.00 0.150 67,500.00 0.768 345,600 022 MODIFYING CAMERA SYSTEMS LS 3,600,000.0000 3,600,000.00 0.040 144,000.00 0.829 2,984,400 PROGRAM CAS145 PAGE 2 DATE 10/22/26 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-351114 TIME 09:14 PM ESTIMATE NO. 017 BID OPENING 09/17/24 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/26 R.E. NAME: ALONZO, BERNARD DATE OF THIS ESTIMATE 10/22/26 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 380,470.00 3,937,280.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 26,787.00 48,539.40 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 407,257.00 3,985,819.40 023 MOBILIZATION LS 540,000.0000 540,000.00 1.000 540,000 ORIGINAL CONTRACT AMOUNT 5,358,200.00 TOTAL WORK COMPLETED 407,257.00 4,525,819.40 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 30,000.00 -4,180.00 TOTAL 437,257.00 4,521,639.40 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE MAXIMUM CONTRACT OVERBID VALUE PRICE AMOUNT 023 MOBILIZATION 535,820.00 540,000.00 4,180.00 DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 10/29/24 300 07/30/25 12/24/24 01/11/27 249 205 0 0 82% 83% PROGRESS IS SATISFACTORY ALONZO, BERNARD RESIDENT ENGINEER