PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 08/25/26 EST. NO. 001 TIME 12:32 PM R.E. NAME: HOSSAIN, MUHAMMAD 07-363304 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 08/25/26 EST. NO. 001 TIME 12:32 PM R.E. NAME: HOSSAIN, MUHAMMAD 07-363304 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 08/25/26 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-363304 TIME 12:32 PM ESTIMATE NO. 001 BID OPENING 01/13/26 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/26 R.E. NAME: HOSSAIN, MUHAMMAD DATE OF THIS ESTIMATE 08/25/26 LOCATION RERUN PROGRESS ESTIMATE 07-LA-405-25.9/43.8 ----------------------- ALDRIDGE ELECTRIC, INC. LOS ANGELES COUNTY IN LOS ANGELES FROM 844 EAST ROCKLAND ROAD JEFFERSON BOULEVARD UNDERCROSSING TO LIBERTYVILLE IL 60048 ROSCOE BOULEVARD UNDERCROSSING FED. AID NO. ACIM-4053(79) INSTALL TRAFFIC MANAGEMENT SYSTEM. ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 3,600.0000 3,600.00 0.000 0 002 LEVEL 2 CRITICAL PATH METHOD SCHEDULE LS 30,000.0000 30,000.00 0.000 0 003 TIME-RELATED OVERHEAD (WDAY) WDAY 3,355.0000 1,677,500.00 20.000 67,100.00 20.000 67,100 004 DISPUTE RESOLUTION BOARD ON-SITE MEETING EA 6,000.0000 42,000.00 0.000 0 005 HOURLY OFF-SITE HR 200.0000 4,000.00 0.000 0 DISPUTE-RESOLUTION-BOARD-RELATED TASKS 006 CONSTRUCTION AREA SIGNS LS 85,080.0000 85,080.00 0.500 42,540.00 0.500 42,540 007 TRAFFIC CONTROL SYSTEM LS 1,001,361.0000 1,001,361.00 0.000 0 008 PORTABLE RADAR SPEED FEEDBACK SIGN DAY 120.0000 12,000.00 0.000 0 SYSTEM 009 JOB SITE MANAGEMENT LS 30,000.0000 30,000.00 0.000 0 010 WATER POLLUTION CONTROL PROGRAM LS 1,200.0000 1,200.00 1.000 1,200.00 1.000 1,200 011 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 3.6000 8,388.00 0.000 0 STRIPE (HAZARDOUS WASTE) 012 TREATED WOOD WASTE LB 1.2000 1,236.00 0.000 0 013 ROADSIDE CLEARING LS 55,800.0000 55,800.00 0.000 0 014 PRUNE EXISTING PLANTS LS 190,440.0000 190,440.00 0.000 0 015 MAINTAIN EXISTING PLANTED AREAS LS 84,120.0000 84,120.00 0.000 0 016 WOOD MULCH CY 120.0000 46,800.00 0.000 0 017 STRUCTURAL STEEL LB 120.0000 44,640.00 0.000 0 (F) 018 REMOVE PAVEMENT MARKER EA 1.2000 228.00 0.000 0 019 PAVEMENT MARKER (RETROREFLECTIVE) EA 6.0000 1,260.00 0.000 0 020 MARKER EA 12.0000 216.00 0.000 0 021 REMOVE ROADSIDE SIGN (WOOD POST) EA 180.0000 2,880.00 0.000 0 022 REMOVE ROADSIDE SIGN (METAL POST) EA 360.0000 720.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 08/25/26 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-363304 TIME 12:32 PM ESTIMATE NO. 001 BID OPENING 01/13/26 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/26 R.E. NAME: HOSSAIN, MUHAMMAD DATE OF THIS ESTIMATE 08/25/26 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 REMOVE ROADSIDE SIGN (STRAP AND SADDLE EA 162.0000 2,430.00 0.000 0 BRACKET METHOD) 024 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 16.8000 4,536.00 0.000 0 (0.063"-UNFRAMED) 025 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 18.0000 3,060.00 0.000 0 (0.080"-UNFRAMED) 026 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 37.2000 669.60 0.000 0 (0.063"-FRAMED) 027 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 38.4000 1,843.20 0.000 0 (0.080"-FRAMED) 028 ROADSIDE SIGN - ONE POST EA 516.0000 9,804.00 0.000 0 029 ROADSIDE SIGN - TWO POST EA 1,560.0000 3,120.00 0.000 0 030 INSTALL SIGN (STRAP AND SADDLE BRACKET EA 312.0000 4,680.00 0.000 0 METHOD) 031 PREFORMED THERMOPLASTIC PAVEMENT MARKING SQFT 18.0000 22,320.00 0.000 0 032 6" THERMOPLASTIC TRAFFIC STRIPE LF 1.8000 11,466.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 033 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 1.8000 7,758.00 0.000 0 034 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 2.4000 2,424.00 0.000 0 035 6" TRAFFIC STRIPE TAPE (WARRANTY) LF 4.8000 8,544.00 0.000 0 (BROKEN 17-7) 036 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 148,257.0000 148,257.00 0.000 0 SYSTEM ELEMENTS DURING CONSTRUCTION 037 TRAFFIC MONITORING STATION SYSTEM LS 748,662.7000 748,662.70 0.000 0 038 MODIFYING FIBER OPTIC CABLE SYSTEMS LS 2,888,780.8000 2,888,780.80 0.000 0 039 MODIFYING RAMP METERING SYSTEMS LS 1,362,975.8000 1,362,975.80 0.000 0 040 MODIFYING TRAFFIC MONITORING STATIONS LS 246,034.6000 246,034.60 0.000 0 041 MODIFYING CHANGEABLE MESSAGE SIGN LS 248,257.3000 248,257.30 0.000 0 SYSTEMS 042 MODIFYING BREAKOUT COMMUNICATION CABLE LS 2,323,427.1000 2,323,427.10 0.000 0 SYSTEMS PROGRAM CAS145 PAGE 3 DATE 08/25/26 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-363304 TIME 12:32 PM ESTIMATE NO. 001 BID OPENING 01/13/26 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/26 R.E. NAME: HOSSAIN, MUHAMMAD DATE OF THIS ESTIMATE 08/25/26 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 110,840.00 110,840.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 110,840.00 110,840.00 043 MOBILIZATION LS 1,240,418.7000 1,240,418.70 0.000 0 ORIGINAL CONTRACT AMOUNT 12,612,937.80 TOTAL WORK COMPLETED 110,840.00 110,840.00 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 110,840.00 110,840.00 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 04/02/26 500 07/20/26 04/17/26 04/17/28 24 65 0 0 1% 5% PROGRESS IS SATISFACTORY HOSSAIN, MUHAMMAD RESIDENT ENGINEER