PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 10/23/26 EST. NO. 003 TIME 11:50 AM R.E. NAME: HOSSAIN, MUHAMMAD 07-363304 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 10/23/26 EST. NO. 003 TIME 11:50 AM R.E. NAME: HOSSAIN, MUHAMMAD 07-363304 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE MOBILIZATION ADJUST -620,209.35 003 -620,209.35 -620,209.35 TOTAL DEDUCTIONS -620,209.35 -620,209.35 PROGRAM CAS145 PAGE 1 DATE 10/23/26 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-363304 TIME 11:50 AM ESTIMATE NO. 003 BID OPENING 01/13/26 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/26 R.E. NAME: HOSSAIN, MUHAMMAD DATE OF THIS ESTIMATE 10/23/26 LOCATION RERUN PROGRESS ESTIMATE 07-LA-405-25.9/43.8 ----------------------- ALDRIDGE ELECTRIC, INC. LOS ANGELES COUNTY IN LOS ANGELES FROM 844 EAST ROCKLAND ROAD JEFFERSON BOULEVARD UNDERCROSSING TO LIBERTYVILLE IL 60048 ROSCOE BOULEVARD UNDERCROSSING FED. AID NO. ACIM-4053(79) INSTALL TRAFFIC MANAGEMENT SYSTEM. ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 3,600.0000 3,600.00 1.000 3,600.00 1.000 3,600 002 LEVEL 2 CRITICAL PATH METHOD SCHEDULE LS 30,000.0000 30,000.00 0.000 0 003 TIME-RELATED OVERHEAD (WDAY) WDAY 3,355.0000 1,677,500.00 21.000 70,455.00 56.000 187,880 004 DISPUTE RESOLUTION BOARD ON-SITE MEETING EA 6,000.0000 42,000.00 1.000 6,000.00 1.000 6,000 005 HOURLY OFF-SITE HR 200.0000 4,000.00 0.000 0 DISPUTE-RESOLUTION-BOARD-RELATED TASKS 006 CONSTRUCTION AREA SIGNS LS 85,080.0000 85,080.00 0.500 42,540 007 TRAFFIC CONTROL SYSTEM LS 1,001,361.0000 1,001,361.00 0.050 50,068.05 0.050 50,068 008 PORTABLE RADAR SPEED FEEDBACK SIGN DAY 120.0000 12,000.00 0.000 0 SYSTEM 009 JOB SITE MANAGEMENT LS 30,000.0000 30,000.00 0.000 0 010 WATER POLLUTION CONTROL PROGRAM LS 1,200.0000 1,200.00 1.000 1,200 011 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 3.6000 8,388.00 0.000 0 STRIPE (HAZARDOUS WASTE) 012 TREATED WOOD WASTE LB 1.2000 1,236.00 0.000 0 013 ROADSIDE CLEARING LS 55,800.0000 55,800.00 0.000 0 014 PRUNE EXISTING PLANTS LS 190,440.0000 190,440.00 0.000 0 015 MAINTAIN EXISTING PLANTED AREAS LS 84,120.0000 84,120.00 0.000 0 016 WOOD MULCH CY 120.0000 46,800.00 0.000 0 017 STRUCTURAL STEEL LB 120.0000 44,640.00 0.000 0 (F) 018 REMOVE PAVEMENT MARKER EA 1.2000 228.00 0.000 0 019 PAVEMENT MARKER (RETROREFLECTIVE) EA 6.0000 1,260.00 0.000 0 020 MARKER EA 12.0000 216.00 0.000 0 021 REMOVE ROADSIDE SIGN (WOOD POST) EA 180.0000 2,880.00 0.000 0 022 REMOVE ROADSIDE SIGN (METAL POST) EA 360.0000 720.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 10/23/26 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-363304 TIME 11:50 AM ESTIMATE NO. 003 BID OPENING 01/13/26 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/26 R.E. NAME: HOSSAIN, MUHAMMAD DATE OF THIS ESTIMATE 10/23/26 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 REMOVE ROADSIDE SIGN (STRAP AND SADDLE EA 162.0000 2,430.00 0.000 0 BRACKET METHOD) 024 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 16.8000 4,536.00 0.000 0 (0.063"-UNFRAMED) 025 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 18.0000 3,060.00 0.000 0 (0.080"-UNFRAMED) 026 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 37.2000 669.60 0.000 0 (0.063"-FRAMED) 027 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 38.4000 1,843.20 0.000 0 (0.080"-FRAMED) 028 ROADSIDE SIGN - ONE POST EA 516.0000 9,804.00 0.000 0 029 ROADSIDE SIGN - TWO POST EA 1,560.0000 3,120.00 0.000 0 030 INSTALL SIGN (STRAP AND SADDLE BRACKET EA 312.0000 4,680.00 0.000 0 METHOD) 031 PREFORMED THERMOPLASTIC PAVEMENT MARKING SQFT 18.0000 22,320.00 0.000 0 032 6" THERMOPLASTIC TRAFFIC STRIPE LF 1.8000 11,466.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 033 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 1.8000 7,758.00 0.000 0 034 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 2.4000 2,424.00 0.000 0 035 6" TRAFFIC STRIPE TAPE (WARRANTY) LF 4.8000 8,544.00 0.000 0 (BROKEN 17-7) 036 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 148,257.0000 148,257.00 0.000 0 SYSTEM ELEMENTS DURING CONSTRUCTION 037 TRAFFIC MONITORING STATION SYSTEM LS 748,662.7000 748,662.70 0.000 0 038 MODIFYING FIBER OPTIC CABLE SYSTEMS LS 2,888,780.8000 2,888,780.80 0.042 121,328.79 0.042 121,328 039 MODIFYING RAMP METERING SYSTEMS LS 1,362,975.8000 1,362,975.80 0.000 0 040 MODIFYING TRAFFIC MONITORING STATIONS LS 246,034.6000 246,034.60 0.000 0 041 MODIFYING CHANGEABLE MESSAGE SIGN LS 248,257.3000 248,257.30 0.048 11,916 SYSTEMS 042 MODIFYING BREAKOUT COMMUNICATION CABLE LS 2,323,427.1000 2,323,427.10 0.036 83,643.38 0.069 160,316 SYSTEMS PROGRAM CAS145 PAGE 3 DATE 10/23/26 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-363304 TIME 11:50 AM ESTIMATE NO. 003 BID OPENING 01/13/26 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/26 R.E. NAME: HOSSAIN, MUHAMMAD DATE OF THIS ESTIMATE 10/23/26 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 335,095.22 584,849.66 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 335,095.22 584,849.66 043 MOBILIZATION LS 1,240,418.7000 1,240,418.70 0.500 620,209.35 0.500 620,209 ORIGINAL CONTRACT AMOUNT 12,612,937.80 TOTAL WORK COMPLETED 955,304.57 1,205,059.01 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS -620,209.35 -620,209.35 TOTAL 335,095.22 584,849.66 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 04/02/26 500 07/20/26 04/17/26 04/17/28 65 65 0 0 10% 13% PROGRESS IS SATISFACTORY HOSSAIN, MUHAMMAD RESIDENT ENGINEER