PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 08/21/23 EST. NO. 002 TIME 09:05 AM R.E. NAME: BUI, KEVIN 07-385904 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 08/21/23 EST. NO. 002 TIME 09:05 AM R.E. NAME: BUI, KEVIN 07-385904 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 08/21/23 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-385904 TIME 09:05 AM ESTIMATE NO. 002 BID OPENING 03/21/23 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/23 R.E. NAME: BUI, KEVIN DATE OF THIS ESTIMATE 08/21/23 LOCATION PROGRESS ESTIMATE 07-LA-118-R10.0/R13.2 ----------------- ACCU CONSTRUCTION, INC. LOS ANGELES COUNTY IN LOS ANGELES FROM 0.1 14751 PLAZA DRIVE SUITE L MILE WEST OF SEPULVEDA BOULEVARD TUSTIN CA 92780 UNDERCROSSING TO GLENOAKS BOULEVARD UNDERCROSSING FED. AID NO. N O N E INSTALL IRRIGATION SYSTEMS & PLACE ROCK BL ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 1,000.0000 1,000.00 1.000 1,000 002 TIME-RELATED OVERHEAD (WDAY) WDAY 1,800.0000 261,000.00 21.000 37,800.00 32.000 57,600 003 DISPUTE RESOLUTION ADVISOR ON-SITE EA 2,000.0000 8,000.00 1.000 2,000 MEETING 004 HOURLY OFF-SITE HR 200.0000 2,000.00 2.000 400 DISPUTE-RESOLUTION-ADVISOR-RELATED TASKS 005 CONSTRUCTION AREA SIGNS LS 15,000.0000 15,000.00 0.580 8,700 006 TRAFFIC CONTROL SYSTEM LS 140,000.0000 140,000.00 0.140 19,600.00 0.220 30,800 007 PORTABLE RADAR SPEED FEEDBACK SIGN EA 80.0000 4,800.00 0.000 0 SYSTEM DAY 008 JOB SITE MANAGEMENT LS 8,000.0000 8,000.00 0.140 1,120.00 0.220 1,760 009 PREPARE STORM WATER POLLUTION PREVENTION LS 2,000.0000 2,000.00 0.750 1,500 PLAN 010 STORM WATER ANNUAL REPORT EA 2,000.0000 2,000.00 0.000 0 011 TEMPORARY COVER SQYD 1.0000 12,100.00 0.000 0 012 TEMPORARY DRAINAGE INLET PROTECTION EA 200.0000 4,800.00 24.000 4,800 013 TEMPORARY FIBER ROLL LF 4.5000 55,350.00 12,300.000 55,350 014 TEMPORARY CONSTRUCTION ENTRANCE EA 2,000.0000 4,000.00 0.000 0 015 STREET SWEEPING LS 2,000.0000 2,000.00 0.140 280.00 0.220 440 016 TEMPORARY CONCRETE WASHOUT LS 1,000.0000 1,000.00 0.000 0 017 ROADSIDE CLEARING LS 70,000.0000 70,000.00 0.920 64,400.00 1.000 70,000 018 DECORATIVE BOULDERS EA 3,000.0000 9,000.00 0.000 0 019 ROCK BLANKET SQFT 15.0000 1,111,500.00 4,014.000 60,210.00 4,014.000 60,210 020 PLANTER WALL EA 36,000.0000 36,000.00 0.000 0 021 SOIL AMENDMENT CY 100.0000 15,000.00 0.000 0 022 ORGANIC FERTILIZER LB 10.0000 1,500.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 08/21/23 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-385904 TIME 09:05 AM ESTIMATE NO. 002 BID OPENING 03/21/23 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/23 R.E. NAME: BUI, KEVIN DATE OF THIS ESTIMATE 08/21/23 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 PACKET FERTILIZER EA 2.0000 380.00 0.000 0 024 PLANT (GROUP A) EA 25.0000 5,000.00 0.000 0 025 PLANT (GROUP B) EA 50.0000 18,500.00 0.000 0 026 MAINTAIN EXISTING PLANTED AREAS LS 5,000.0000 5,000.00 0.012 60.00 0.024 120 027 PLANT ESTABLISHMENT WORK LS 50,000.0000 50,000.00 0.000 0 028 WOOD MULCH CY 45.0000 292,950.00 0.000 0 029 CHECK AND TEST EXISTING IRRIGATION LS 3,000.0000 3,000.00 1.000 3,000 FACILITIES 030 OPERATE EXISTING IRRIGATION FACILITIES LS 3,000.0000 3,000.00 0.012 36 031 REMOVE IRRIGATION FACILITY LS 4,000.0000 4,000.00 1.000 4,000.00 1.000 4,000 032 CONTROL AND NEUTRAL CONDUCTORS LS 10,000.0000 10,000.00 0.150 1,500.00 0.150 1,500 033 1 1/2" REMOTE CONTROL VALVE EA 600.0000 14,400.00 0.000 0 034 2" REMOTE CONTROL VALVE EA 650.0000 1,300.00 0.000 0 035 LOCKJAW VALVE BOX EA 1,500.0000 78,000.00 68.000 102,000.00 68.000 102,000 036 24-32 STATION IRRIGATION CONTROLLER EA 12,000.0000 48,000.00 0.000 0 (PEDESTAL MOUNTED) 037 2" GALVANIZED STEEL PIPE (SUPPLY LINE) LF 70.0000 25,830.00 0.000 0 (F) 038 IRRIGATION CONTROLLER ENCLOSURE CABINET EA 2,000.0000 8,000.00 0.000 0 039 2" BACKFLOW PREVENTER ASSEMBLY EA 4,000.0000 4,000.00 0.000 0 040 BACKFLOW PREVENTER ENCLOSURE EA 2,500.0000 2,500.00 0.000 0 041 FLOW SENSOR EA 1,300.0000 2,600.00 0.000 0 042 RISER SPRINKLER ASSEMBLY EA 50.0000 46,000.00 0.000 0 043 2" GATE VALVE EA 700.0000 2,100.00 0.000 0 044 3/4" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LF 6.0000 76,908.00 0.000 0 (F) LINE) 045 1" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LF 7.0000 5,110.00 0.000 0 (F) LINE) 046 1 1/2" PLASTIC PIPE (SCHEDULE 40) LF 8.0000 8,008.00 0.000 0 (F) (SUPPLY LINE) 047 2" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LF 9.0000 36,585.00 0.000 0 (F) LINE) 048 BALL VALVE EA 400.0000 9,600.00 0.000 0 049 PVC PIPE CONDUIT LF 100.0000 49,500.00 0.000 0 (F) PROGRAM CAS145 PAGE 3 DATE 08/21/23 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-385904 TIME 09:05 AM ESTIMATE NO. 002 BID OPENING 03/21/23 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/23 R.E. NAME: BUI, KEVIN DATE OF THIS ESTIMATE 08/21/23 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 050 HYDROSEED SQFT 0.3000 21,630.00 0.000 0 051 MINOR CONCRETE (STAMPED CONCRETE) SQFT 14.0000 554,400.00 0.000 0 052 REMOVE CHAIN LINK FENCE LF 10.0000 48,500.00 0.000 0 053 METAL FENCE LF 130.0000 630,500.00 0.000 0 054 4' METAL GATE EA 3,800.0000 30,400.00 0.000 0 055 ELECTRIC SERVICE FOR IRRIGATION LS 130,000.0000 130,000.00 0.300 39,000.00 0.300 39,000 056 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 057 IMPORTED TOPSOIL (CY) CY 100.0000 2,500.00 0.000 0 PROGRAM CAS145 PAGE 4 DATE 08/21/23 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-385904 TIME 09:05 AM ESTIMATE NO. 002 BID OPENING 03/21/23 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/23 R.E. NAME: BUI, KEVIN DATE OF THIS ESTIMATE 08/21/23 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 329,970.00 444,216.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 329,970.00 444,216.00 058 MOBILIZATION LS 70,000.0000 70,000.00 0.750 52,500.00 0.750 52,500 ORIGINAL CONTRACT AMOUNT 4,064,251.00 TOTAL WORK COMPLETED 382,470.00 496,716.00 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 382,470.00 496,716.00 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 05/12/23 145 00/00/00 07/06/23 03/30/27 32 0 0 0 12% 22% PROGRESS IS SATISFACTORY BUI, KEVIN RESIDENT ENGINEER