PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 05/22/18 EST. NO. 002 TIME 10:43 AM R.E. NAME: MOHSENZADEH, ALI 07-3W4504 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 05/22/18 EST. NO. 002 TIME 10:43 AM R.E. NAME: MOHSENZADEH, ALI 07-3W4504 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 05/22/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-3W4504 TIME 10:43 AM ESTIMATE NO. 002 BID OPENING 05/04/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/18 R.E. NAME: MOHSENZADEH, ALI DATE OF THIS ESTIMATE 05/22/18 LOCATION PROGRESS ESTIMATE 07-LA-14-R32.1/R60.7 ----------------- MYERS AND SONS CONSTRUCTION, IN SANTA CLARITA AND PALMDALE FROM LP 0.2 MILE NORTH OF SANTA CLARA RIVER 4600 NORTHGATE BLVD SUITE 100 TO TECHNOLOGY DRIVE SACRAMENTO CA 95834 UNDERCROSSING FED. AID NO. NHP0-1407-6(E ) PCC GRIND, SLABS REPAIR, CPOL ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 750.0000 750.00 0.000 0 002 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 6,000.0000 6,000.00 0.000 0 003 TIME-RELATED OVERHEAD (WDAY) WDAY 1,600.0000 240,000.00 0.000 0 004 CONSTRUCTION AREA SIGNS LS 9,000.0000 9,000.00 0.700 6,300 005 TRAFFIC CONTROL SYSTEM LS 500,000.0000 500,000.00 0.020 10,000.00 0.020 10,000 006 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 70,000.0000 70,000.00 0.000 0 007 JOB SITE MANAGEMENT LS 6,000.0000 6,000.00 0.280 1,680.00 0.280 1,680 008 PREPARE WATER POLLUTION CONTROL PROGRAM LS 1,000.0000 1,000.00 0.000 0 009 TEMPORARY CONCRETE WASHOUT LS 3,000.0000 3,000.00 0.000 0 010 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 0.2000 41,400.00 0.000 0 STRIPE (HAZARDOUS WASTE) 011 LEAN CONCRETE BASE RAPID SETTING CY 820.0000 106,600.00 0.000 0 012 SLURRY SEAL TON 260.0000 140,400.00 0.000 0 013 HOT MIX ASPHALT (TYPE A) TON 118.0000 66,080.00 0.000 0 014 DATA CORE LS 8,000.0000 8,000.00 0.000 0 015 TACK COAT TON 880.0000 3,520.00 0.000 0 016 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 2.0000 17,600.00 0.000 0 017 INDIVIDUAL SLAB REPLACEMENT (RSC) CY 810.0000 1,061,100.00 0.000 0 018 REPLACE JOINT SEAL (ASPHALT RUBBER) LF 2.8000 44,520.00 0.000 0 019 REPLACE JOINT SEAL (SILICONE) LF 3.7000 146,520.00 0.000 0 020 GRIND EXISTING CONCRETE SQYD 4.0000 2,336,000.00 0.000 0 PAVEMENT 021 REMOVE PAVEMENT MARKER EA 0.2500 15,175.00 0.000 0 022 PAVEMENT MARKER (NON-REFLECTIVE) EA 1.0000 720.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 05/22/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-3W4504 TIME 10:43 AM ESTIMATE NO. 002 BID OPENING 05/04/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/18 R.E. NAME: MOHSENZADEH, ALI DATE OF THIS ESTIMATE 05/22/18 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 PAVEMENT MARKER (RETROREFLECTIVE) EA 2.2000 11,550.00 0.000 0 024 PAVEMENT MARKER EA 19.7500 292,300.00 0.000 0 (RETROREFLECTIVE-RECESSED) 025 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.3000 25,200.00 0.000 0 026 THERMOPLASTIC PAVEMENT MARKING SQFT 3.0000 11,130.00 0.000 0 027 8" THERMOPLASTIC TRAFFIC STRIPE LF 0.6000 49,980.00 0.000 0 (BROKEN 36-12) 028 PAINT TRAFFIC STRIPE (2-COAT) LF 0.1200 195,600.00 0.000 0 029 PAINT PAVEMENT MARKING (2-COAT) SQFT 2.2000 16,060.00 0.000 0 030 REMOVE PAINTED TRAFFIC STRIPE LF 0.0500 61,000.00 0.000 0 031 REMOVE PAINTED PAVEMENT MARKING SQFT 1.0000 7,300.00 0.000 0 032 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 0.0500 4,525.00 0.000 0 033 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 1.0000 3,710.00 0.000 0 034 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 500.0000 500.00 0.000 0 SYSTEM ELEMENTS DURING CONSTRUCTION 035 MODIFYING EXISTING ELECTRICAL SYSTEM LS 4,000.0000 4,000.00 0.000 0 PROGRAM CAS145 PAGE 3 DATE 05/22/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-3W4504 TIME 10:43 AM ESTIMATE NO. 002 BID OPENING 05/04/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/18 R.E. NAME: MOHSENZADEH, ALI DATE OF THIS ESTIMATE 05/22/18 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 11,680.00 17,980.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 11,680.00 17,980.00 036 MOBILIZATION LS 563,000.0000 563,000.00 0.000 0 ORIGINAL CONTRACT AMOUNT 6,069,240.00 TOTAL WORK COMPLETED 11,680.00 17,980.00 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 11,680.00 17,980.00 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 07/27/17 170 08/11/17 00/00/00 11/20/18 43 148 0 0 0% 25% PROGRESS IS SATISFACTORY *** SUSPENDED ON 05/14/18. MOHSENZADEH, ALI RESIDENT ENGINEER PROGRAM CAS145 DATE 05/22/18