PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 04/25/17 EST. NO. 001 TIME 09:03 AM R.E. NAME: AZIMA, HASSAN 07-3W5004 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 04/25/17 EST. NO. 001 TIME 09:03 AM R.E. NAME: AZIMA, HASSAN 07-3W5004 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 04/25/17 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-3W5004 TIME 09:03 AM ESTIMATE NO. 001 BID OPENING 11/03/16 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/17 R.E. NAME: AZIMA, HASSAN DATE OF THIS ESTIMATE 04/25/17 LOCATION PROGRESS ESTIMATE 07-LA-210-32.9/36.5 ----------------- J. MCLOUGHLIN ENGINEERING CO., IN LOS ANGELES COUNTY, FROM INC. HUNTINGTON DRIVE UC TO BRADBURY 10641 FULTON COURT FLOOD CONTROL CHANNEL RANCHO CUCAMONGA CA 91730 FED. AID NO. N O N E PCC PROFILE GRIND AND SLAB ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 1,500.0000 1,500.00 0.500 750.00 0.500 750 002 CONSTRUCTION AREA SIGNS LS 6,000.0000 6,000.00 0.000 0 003 TRAFFIC CONTROL SYSTEM LS 110,000.0000 110,000.00 0.000 0 004 JOB SITE MANAGEMENT LS 4,000.0000 4,000.00 0.000 0 005 PREPARE WATER POLLUTION CONTROL PROGRAM LS 5,000.0000 5,000.00 0.750 3,750.00 0.750 3,750 006 TEMPORARY CONCRETE WASHOUT LS 4,000.0000 4,000.00 0.000 0 007 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 0.2500 13,800.00 0.000 0 STRIPE (HAZARDOUS WASTE) 008 REMOVE PAVEMENT MARKER EA 1.0000 9,170.00 0.000 0 009 REPLACE BASE CY 300.0000 111,000.00 0.000 0 010 DRILL AND BOND (DOWEL BAR) EA 5.0000 31,150.00 0.000 0 011 DRILL AND BOND (TIE BAR) EA 10.0000 32,100.00 0.000 0 012 INDIVIDUAL SLAB REPLACEMENT (RSC) CY 520.0000 941,200.00 0.000 0 013 JOINT SEAL (PREFORMED COMPRESSION) LF 4.5000 73,800.00 0.000 0 014 REPLACE JOINT SEAL (SILICONE) LF 1.7500 269,500.00 0.000 0 015 ISOLATION JOINT SEAL (PREFORMED LF 10.0000 8,000.00 0.000 0 COMPRESSION) 016 GRIND EXISTING CONCRETE SQYD 4.2000 571,200.00 0.000 0 PAVEMENT 017 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.3700 32,782.00 0.000 0 018 8" THERMOPLASTIC TRAFFIC STRIPE LF 0.6500 2,411.50 0.000 0 019 8" THERMOPLASTIC TRAFFIC STRIPE LF 0.6500 4,680.00 0.000 0 (BROKEN 12-3) 020 THERMOPLASTIC PAVEMENT MARKING SQFT 5.0000 2,800.00 0.000 0 021 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.2800 16,912.00 0.000 0 (BROKEN 36-12) 022 4" THERMOPLASTIC TRAFFIC STRIPE LF 1.0000 100.00 0.000 0 (BROKEN 17-7) PROGRAM CAS145 PAGE 2 DATE 04/25/17 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-3W5004 TIME 09:03 AM ESTIMATE NO. 001 BID OPENING 11/03/16 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/17 R.E. NAME: AZIMA, HASSAN DATE OF THIS ESTIMATE 04/25/17 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 8" THERMOPLASTIC TRAFFIC STRIPE LF 0.6500 858.00 0.000 0 (BROKEN 36-12) 024 PAINT TRAFFIC STRIPE (2-COAT) LF 0.1200 3,372.00 0.000 0 025 PAVEMENT MARKER (NON-REFLECTIVE) EA 1.0000 5,060.00 0.000 0 026 PAVEMENT MARKER (RETROREFLECTIVE) EA 2.0000 8,220.00 0.000 0 027 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 500.0000 500.00 0.000 0 SYSTEM ELEMENTS DURING CONSTRUCTION 028 MODIFYING EXISTING ELECTRICAL SYSTEM LS 23,500.0000 23,500.00 0.000 0 PROGRAM CAS145 PAGE 3 DATE 04/25/17 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-3W5004 TIME 09:03 AM ESTIMATE NO. 001 BID OPENING 11/03/16 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/17 R.E. NAME: AZIMA, HASSAN DATE OF THIS ESTIMATE 04/25/17 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 4,500.00 4,500.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 4,500.00 4,500.00 029 MOBILIZATION LS 250,000.0000 250,000.00 0.000 0 ORIGINAL CONTRACT AMOUNT 2,542,615.50 TOTAL WORK COMPLETED 4,500.00 4,500.00 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 4,500.00 4,500.00 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 01/11/17 140 00/00/00 01/26/17 08/20/17 57 1 0 0 0% 41% PROGRESS IS SATISFACTORY AZIMA, HASSAN RESIDENT ENGINEER PROGRAM CAS145 DATE 04/25/17