PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 02/23/18 EST. NO. 005 TIME 02:41 PM R.E. NAME: HERRERA, EDGAR 07-3W5404 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0002 3,621.87 E.W. @ F.A.(+) 120417 N E2 0 0003 3,363.17 120617 N E3 0 0004 3,532.06 120717 N E4 0 0005 2,805.04 121817 N E5 0 0006 2,512.59 010318 N E6 0 15,834.73 TOTAL THIS ESTIMATE 3,965.48 TOTAL PREVIOUS ESTIMATE 19,800.21 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 02/23/18 EST. NO. 005 TIME 02:41 PM R.E. NAME: HERRERA, EDGAR 07-3W5404 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE CEM 4401 ANNUAL 2017 -10,000.00 004 CEM 4401 ANNUAL 2017 10,000.00 005 10,000.00 0.00 TOTAL DEDUCTIONS 10,000.00 0.00 PROGRAM CAS145 PAGE 1 DATE 02/23/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-3W5404 TIME 02:41 PM ESTIMATE NO. 005 BID OPENING 02/15/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/18 R.E. NAME: HERRERA, EDGAR DATE OF THIS ESTIMATE 02/23/18 LOCATION RERUN PROGRESS ESTIMATE 07-LA-110-9.8/14.0 ----------------------- PETERSON-CHASE GENERAL IN LOS ANGELES COUNTY ON ROUTES 110 ENGINEERING CONSTRUCTION, INC. AND 105 16351 CONSTRUCTION CIRCLE WES IRVINE CA 92606 FED. AID NO. N O N E BRIDGE PRESERVATION: REPLACE JOINT ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 2,340.0000 2,340.00 1.000 2,340 002 CONSTRUCTION AREA SIGNS LS 12,000.0000 12,000.00 0.200 2,400.00 0.650 7,800 003 TRAFFIC CONTROL SYSTEM LS 225,000.0000 225,000.00 0.200 45,000.00 0.600 135,000 004 JOB SITE MANAGEMENT LS 1,570.0000 1,570.00 0.200 314.00 0.600 942 005 PREPARE WATER POLLUTION CONTROL PROGRAM LS 730.0000 730.00 1.000 730 006 TEMPORARY DRAINAGE INLET PROTECTION EA 164.0000 1,640.00 0.000 0 007 TEMPORARY CONCRETE WASHOUT LS 1,700.0000 1,700.00 0.200 340.00 0.400 680 008 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 23.4000 2,808.00 120.000 2,808 STRIPE (HAZARDOUS WASTE) 009 STRUCTURAL CONCRETE, BRIDGE CY 950.0000 234,650.00 24.000 22,800.00 87.000 82,650 (F) 010 STRUCTURAL CONCRETE, BRIDGE (REPAIR) CY 12,600.0000 12,600.00 0.000 0 (F) 011 DRILL AND BOND DOWEL (CHEMICAL ADHESIVE) LF 24.4000 1,122.40 0.000 0 (LF) 012 CLEAN EXPANSION JOINT LF 5.2000 10,067.20 295.000 1,534.00 862.000 4,482 013 INSTALL BONDED JOINT SEAL (MR 1 1/2") LF 23.0000 7,498.00 0.000 0 014 INSTALL BONDED JOINT SEAL (MR 2") LF 23.0000 2,346.00 0.000 0 015 INSTALL JOINT SEAL (MR 1 1/2") LF 22.0000 2,068.00 29.000 638.00 55.500 1,221 016 INSTALL JOINT SEAL (MR 2") LF 22.0000 3,740.00 46.000 1,012.00 72.000 1,584 017 INSTALL JOINT SEAL ASSEMBLY (MR 2 1/2") LF 93.0000 42,780.00 100.000 9,300.00 252.000 23,436 018 INSTALL JOINT SEAL ASSEMBLY (MR 3") LF 93.0000 26,226.00 129.000 11,997 019 INSTALL JOINT SEAL ASSEMBLY (MR 3 1/2") LF 93.0000 16,368.00 104.000 9,672 020 INSTALL JOINT SEAL ASSEMBLY (MR 4") LF 94.0000 18,424.00 0.000 0 021 INSTALL JOINT SEAL ASSEMBLY (MR 4 1/2") LF 94.0000 12,220.00 0.000 0 022 BAR REINFORCING STEEL (BRIDGE) LB 0.7700 21,426.79 2,636.000 2,029.72 9,147.000 7,043 (F) PROGRAM CAS145 PAGE 2 DATE 02/23/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-3W5404 TIME 02:41 PM ESTIMATE NO. 005 BID OPENING 02/15/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/18 R.E. NAME: HERRERA, EDGAR DATE OF THIS ESTIMATE 02/23/18 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 BAR REINFORCING STEEL (BRIDGE) (REPAIR) LB 140.0000 2,100.00 0.000 0 (F) 024 REPAIR SPALLED SURFACE AREA SQFT 3,350.0000 3,350.00 0.000 0 025 BRIDGE REMOVAL (PORTION), LOCATION A LS 31,400.0000 31,400.00 0.000 0 026 BRIDGE REMOVAL (PORTION), LOCATION B LS 95,000.0000 95,000.00 0.000 0 027 BRIDGE REMOVAL (PORTION), LOCATION C LS 9,700.0000 9,700.00 1.000 9,700 028 BRIDGE REMOVAL (PORTION), LOCATION D LS 24,400.0000 24,400.00 1.000 24,400.00 1.000 24,400 029 BRIDGE REMOVAL (PORTION), LOCATION E LS 48,000.0000 48,000.00 1.000 48,000 030 BRIDGE REMOVAL (PORTION), LOCATION F LS 28,000.0000 28,000.00 1.000 28,000 031 BRIDGE REMOVAL (PORTION), LOCATION G LS 22,000.0000 22,000.00 1.000 22,000 032 BRIDGE REMOVAL (PORTION), LOCATION H LS 88,000.0000 88,000.00 1.000 88,000 033 BRIDGE REMOVAL (PORTION), LOCATION I LS 144,000.0000 144,000.00 0.400 57,600.00 0.800 115,200 034 BRIDGE REMOVAL (PORTION), LOCATION J LS 105,000.0000 105,000.00 0.000 0 035 MISCELLANEOUS METAL (BRIDGE) LB 63.0000 2,898.00 0.000 0 (F) 036 CONCRETE BARRIER (TYPE 50A MODIFIED) LF 410.0000 16,400.00 8.000 3,280.00 8.000 3,280 (F) 037 4" THERMOPLASTIC TRAFFIC STRIPE LF 23.4000 8,424.00 0.000 0 038 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 550.0000 550.00 0.000 0 SYSTEM ELEMENTS DURING CONSTRUCTION PROGRAM CAS145 PAGE 3 DATE 02/23/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-3W5404 TIME 02:41 PM ESTIMATE NO. 005 BID OPENING 02/15/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/18 R.E. NAME: HERRERA, EDGAR DATE OF THIS ESTIMATE 02/23/18 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 170,647.72 630,965.59 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 15,834.73 19,800.21 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 186,482.45 650,765.80 039 MOBILIZATION LS 70,000.0000 70,000.00 0.950 66,500 ORIGINAL CONTRACT AMOUNT 1,358,546.39 TOTAL WORK COMPLETED 186,482.45 717,265.80 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 10,000.00 0.00 TOTAL 196,482.45 717,265.80 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 04/28/17 180 00/00/00 06/22/17 02/27/18 171 41 0 0 52% 95% PROGRESS IS SATISFACTORY UNSATIS PROGRESS OVERRIDEN BECAU PENDING CCO *** SUSPENDED ON 04/30/18. HERRERA, EDGAR RESIDENT ENGINEER PROGRAM CAS145 DATE 02/23/18