PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 06/18/18 EST. NO. 001 TIME 01:21 PM R.E. NAME: KWAN, KIN 07-3W5904 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 06/18/18 EST. NO. 001 TIME 01:21 PM R.E. NAME: KWAN, KIN 07-3W5904 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 06/18/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-3W5904 TIME 01:21 PM ESTIMATE NO. 001 BID OPENING 03/14/18 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/18 R.E. NAME: KWAN, KIN DATE OF THIS ESTIMATE 06/18/18 LOCATION PROGRESS ESTIMATE 07-LA-134-0.8/13.0 ----------------- J. MCLOUGHLIN ENGINEERING CO., IN LOS ANGELES COUNTY IN LOS INC. ANGELES,BURBANK,GLENDALE AND 10641 FULTON COURT PASADENA ON ROTE 2 AT E2-W134 RANCHO CUCAMONGA CA 91730 CONNECTOR OC AND ON ROUTE 134 FROM CAHUENGA BOULEVARD UC TO FED. AID NO. N O N E BRIDGE PRESERVATION ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 2,500.0000 2,500.00 0.000 0 002 CONSTRUCTION AREA SIGNS LS 13,000.0000 13,000.00 0.500 6,500.00 0.500 6,500 003 TRAFFIC CONTROL SYSTEM LS 90,000.0000 90,000.00 0.000 0 004 JOB SITE MANAGEMENT LS 3,000.0000 3,000.00 0.000 0 005 PREPARE WATER POLLUTION CONTROL PROGRAM LS 4,000.0000 4,000.00 0.000 0 006 TEMPORARY CONCRETE WASHOUT LS 3,000.0000 3,000.00 0.000 0 007 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 2.0000 22,400.00 0.000 0 STRIPE (HAZARDOUS WASTE) 008 TEMPORARY DECKING LS 30,000.0000 30,000.00 0.000 0 009 STRUCTURAL CONCRETE, BRIDGE (RSC) CY 1,150.0000 80,500.00 0.000 0 (F) 010 DRILL AND BOND DOWEL LF 75.0000 15,000.00 0.000 0 011 CLEAN EXPANSION JOINT LF 25.0000 15,650.00 0.000 0 012 JOINT SEAL (MR 1/2") LF 45.0000 11,160.00 0.000 0 013 JOINT SEAL (MR 1 1/2") LF 60.0000 22,680.00 0.000 0 014 JOINT SEAL (MR 2") LF 70.0000 24,080.00 0.000 0 015 BAR REINFORCING STEEL (BRIDGE) LB 1.7500 8,575.00 0.000 0 (F) 016 PUBLIC SAFETY PLAN LS 8,000.0000 8,000.00 0.000 0 017 INJECT CRACK (EPOXY) LF 100.0000 7,200.00 0.000 0 018 RAPID SETTING CONCRETE (PATCH) CF 900.0000 900.00 0.000 0 019 REPAIR SPALLED SURFACE AREA SQFT 220.0000 4,620.00 0.000 0 020 REMOVE UNSOUND CONCRETE CF 4,000.0000 4,000.00 0.000 0 021 PREPARE CONCRETE BRIDGE DECK SURFACE SQFT 0.1300 46,931.95 0.000 0 022 TREAT BRIDGE DECK SQFT 0.2200 79,423.30 0.000 0 (F) PROGRAM CAS145 PAGE 2 DATE 06/18/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-3W5904 TIME 01:21 PM ESTIMATE NO. 001 BID OPENING 03/14/18 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/18 R.E. NAME: KWAN, KIN DATE OF THIS ESTIMATE 06/18/18 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 FURNISH BRIDGE DECK TREATMENT MATERIAL GAL 51.0000 239,649.00 0.000 0 024 BRIDGE REMOVAL (PORTION) LS 30,000.0000 30,000.00 0.000 0 025 REMOVE PAVEMENT MARKER EA 2.0000 3,100.00 0.000 0 026 PAVEMENT MARKER (RETROREFLECTIVE) EA 4.0500 5,670.00 0.000 0 027 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.6500 10,985.00 0.000 0 028 8" THERMOPLASTIC TRAFFIC STRIPE LF 1.8000 2,844.00 0.000 0 029 THERMOPLASTIC PAVEMENT MARKING SQFT 5.7000 6,213.00 0.000 0 030 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.9000 1,215.00 0.000 0 (BROKEN 12-3) 031 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.6000 5,832.00 0.000 0 (BROKEN 36-12) 032 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.9000 1,089.00 0.000 0 (BROKEN 17-7) 033 PAINT TRAFFIC STRIPE (2-COAT) LF 0.5500 2,821.50 0.000 0 034 REMOVE PAINTED TRAFFIC STRIPE LF 1.1000 5,643.00 0.000 0 035 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 1.1000 15,840.00 0.000 0 036 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 4.0000 3,160.00 0.000 0 PROGRAM CAS145 PAGE 3 DATE 06/18/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-3W5904 TIME 01:21 PM ESTIMATE NO. 001 BID OPENING 03/14/18 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/18 R.E. NAME: KWAN, KIN DATE OF THIS ESTIMATE 06/18/18 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 6,500.00 6,500.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 6,500.00 6,500.00 037 MOBILIZATION LS 90,000.0000 90,000.00 0.000 0 ORIGINAL CONTRACT AMOUNT 920,681.75 TOTAL WORK COMPLETED 6,500.00 6,500.00 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 6,500.00 6,500.00 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 04/17/18 120 05/02/18 00/00/00 10/22/18 27 0 0 0 1% 23% PROGRESS IS SATISFACTORY KWAN, KIN RESIDENT ENGINEER PROGRAM CAS145 DATE 06/18/18