PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 11/20/20 EST. NO. 005 TIME 11:54 AM R.E. NAME: FERRER, JOSE 07-3W9004 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 003 0001 38,758.28 A.C. @ U.P.(+) 111620 N 01 0 38,758.28 TOTAL THIS ESTIMATE 0.00 TOTAL PREVIOUS ESTIMATE 38,758.28 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 11/20/20 EST. NO. 005 TIME 11:54 AM R.E. NAME: FERRER, JOSE 07-3W9004 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 11/20/20 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-3W9004 TIME 11:54 AM ESTIMATE NO. 005 BID OPENING 05/05/20 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/20/20 R.E. NAME: FERRER, JOSE DATE OF THIS ESTIMATE 11/20/20 LOCATION PROGRESS ESTIMATE 07-LA-405-0.3/6.7 ----------------- DREAMBUILDER CONSTRUCTION CORP IN LOS ANGELES COUNTY IN LONG BEACH DBA DREAMBUILDER FROM ATHERTON ST UC TO PACIFIC AVE 18543 YORBA LINDA BLVD # 376; UC YORBA LINDA CA 92886 FED. AID NO. N O N E SHOULDER DIGOUTS/CPOL, AUX LANE ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 1,300.0000 1,300.00 1.000 1,300 002 TIME-RELATED OVERHEAD (WDAY) WDAY 170.0000 17,000.00 22.000 3,740.00 94.000 15,980 003 CONSTRUCTION AREA SIGNS LS 15,000.0000 15,000.00 0.200 3,000.00 0.950 14,250 004 TRAFFIC CONTROL SYSTEM LS 80,000.0000 80,000.00 0.200 16,000.00 0.920 73,600 005 PORTABLE RADAR SPEED FEEDBACK SIGN LS 4,400.0000 4,400.00 0.200 880.00 0.920 4,048 SYSTEMS 006 JOB SITE MANAGEMENT LS 4,200.0000 4,200.00 0.200 840.00 0.920 3,864 007 PREPARE WATER POLLUTION CONTROL PROGRAM LS 800.0000 800.00 1.000 800 008 CRACK TREATMENT LNMI 6,250.0000 31,250.00 5.000 31,250 009 SLURRY SEAL TON 650.0000 247,000.00 242.000 157,300.00 299.000 194,350 010 REPLACE ASPHALT CONCRETE SURFACING CY 418.0000 79,420.00 0.000 0 011 RUBBERIZED HOT MIX ASPHALT (GAP GRADED) TON 121.0000 598,950.00 445.830 53,945.43 4,881.030 590,604 012 DATA CORE LS 2,300.0000 2,300.00 0.000 0 013 TACK COAT TON 680.0000 21,080.00 0.030 20.40 16.180 11,002 014 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 3.4000 225,420.00 67,802.440 230,528 015 PAVEMENT MARKER (RETROREFLECTIVE) EA 2.2700 14,573.40 991.000 2,249.57 4,830.000 10,964 016 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.5700 17,556.00 9,406.000 5,361.42 40,206.000 22,917 017 8" THERMOPLASTIC TRAFFIC STRIPE LF 0.9000 12,600.00 8,936.000 8,042.40 22,936.000 20,642 018 THERMOPLASTIC PAVEMENT MARKING SQFT 2.8000 10,220.00 1,839.000 5,149.20 5,489.000 15,369 019 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.4500 832.50 380.000 171.00 2,230.000 1,003 (BROKEN 36-12) 020 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.4500 4,477.50 3,274.000 1,473 (BROKEN 17-7) 021 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 1,200.0000 1,200.00 0.200 240.00 0.950 1,140 SYSTEM ELEMENTS DURING CONSTRUCTION PROGRAM CAS145 PAGE 2 DATE 11/20/20 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-3W9004 TIME 11:54 AM ESTIMATE NO. 005 BID OPENING 05/05/20 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/20/20 R.E. NAME: FERRER, JOSE DATE OF THIS ESTIMATE 11/20/20 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 256,939.42 1,245,087.25 ADJUSTMENT OF COMPENSATION 38,758.28 38,758.28 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 295,697.70 1,283,845.53 022 MOBILIZATION LS 65,481.6000 65,481.60 1.000 65,481 ORIGINAL CONTRACT AMOUNT 1,455,061.00 TOTAL WORK COMPLETED 295,697.70 1,349,327.13 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 295,697.70 1,349,327.13 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 06/18/20 100 07/03/20 07/03/20 12/18/20 93 5 0 0 93% 93% PROGRESS IS SATISFACTORY FERRER, JOSE RESIDENT ENGINEER PROGRAM CAS145 DATE 11/20/20