PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 10/25/11 EST. NO.01 TIME 08:44 AM R.E. NAME: CHAVEZ, EFRAIM 07-3Y5404 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 10/25/11 EST. NO.01 TIME 08:44 AM R.E. NAME: CHAVEZ, EFRAIM 07-3Y5404 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 10/25/11 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-3Y5404 TIME 08:44 AM ESTIMATE NO. 01 BID OPENING 05/05/11 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/11 R.E. NAME: CHAVEZ, EFRAIM DATE OF THIS ESTIMATE 10/25/11 LOCATION PROGRESS ESTIMATE 07-LA-210-0.0/11.1 ----------------- PAVE TECH INC IN LA COUNTY IN LA ON RTE 210 FROM 735 LAGUNA DRIVE RTE 5/210 SEPARATION TO SUNLAND CARLSBAD CA 92008 BLVD UNDERCROSSING AND ON RTE 405 FROM NORDHOFF ST UNDERCROSSING TO RTE 5/405 SEPARATION FED. AID NO. N O N E PROFILE GRIND AND REPLACE PAVEMENT ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 001 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 1,000.0000 1,000.00 0.530 530.00 0.530 530.00 002 TIME-RELATED OVERHEAD WDAY 500.0000 70,000.00 69.000 34,500.00 69.000 34,500.00 003 CONSTRUCTION SITE MANAGEMENT LS 2,000.0000 2,000.00 0.530 1,060.00 0.530 1,060.00 004 PREPARE WATER POLLUTION CONTROL LS 1,000.0000 1,000.00 0.530 530.00 0.530 530.00 PROGRAM 005 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 10,000.0000 10,000.00 0.500 5,000.00 0.500 5,000.00 006 CONSTRUCTION AREA SIGNS LS 5,000.0000 5,000.00 0.500 2,500.00 0.500 2,500.00 007 TRAFFIC CONTROL SYSTEM LS 75,000.0000 75,000.00 0.150 11,250.00 0.150 11,250.00 008 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 0.9500 380,950.00 0.000 0.00 009 LEAD COMPLIANCE PLAN LS 1,000.0000 1,000.00 0.000 0.00 010 LEAN CONCRETE BASE RAPID SETTING CY 525.0000 199,500.00 0.000 0.00 011 RUBBERIZED HOT MIX ASPHALT (GAP GRADED) TON 90.0000 2,475,000.00 0.000 0.00 012 TACK COAT TON 1,000.0000 140,000.00 0.000 0.00 013 REPLACE CONCRETE PAVEMENT CY 525.0000 2,110,500.00 1,655.510 869,142.75 1,655.510 869,142.75 (RAPID STRENGTH CONCRETE) 014 GRIND EXISTING CONCRETE SQYD 3.5500 1,799,850.00 0.000 0.00 PAVEMENT 015 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.3700 145,040.00 0.000 0.00 016 8" THERMOPLASTIC TRAFFIC STRIPE LF 1.0000 12,800.00 0.000 0.00 017 8" THERMOPLASTIC TRAFFIC STRIPE LF 0.7500 1,125.00 0.000 0.00 (BROKEN 12-3) 018 THERMOPLASTIC PAVEMENT MARKING SQFT 4.0000 10,400.00 0.000 0.00 019 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.3700 105,450.00 0.000 0.00 (BROKEN 36-12) 020 PAVEMENT MARKER (NON-REFLECTIVE) EA 1.2500 29,750.00 0.000 0.00 021 PAVEMENT MARKER (RETROREFLECTIVE) EA 3.7500 38,250.00 0.000 0.00 022 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 500.0000 500.00 0.000 0.00 SYSTEM ELEMENTS DURING CONSTRUCTION PROGRAM CAS145 PAGE 2 DATE 10/25/11 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-3Y5404 TIME 08:44 AM ESTIMATE NO. 01 BID OPENING 05/05/11 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/11 R.E. NAME: CHAVEZ, EFRAIM DATE OF THIS ESTIMATE 10/25/11 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 023 INDUCTIVE LOOP DETECTOR (REPLACEMENT) EA 405.0000 56,700.00 0.000 0.00 024 MODIFY AUTOMATIC VEHICLE CLASSIFICATION LS 19,700.0000 19,700.00 0.000 0.00 (LOCATION 1) 025 MODIFY AUTOMATIC VEHICLE CLASSIFICATION LS 26,100.0000 26,100.00 0.000 0.00 (LOCATION 2) PROGRAM CAS145 PAGE 3 DATE 10/25/11 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-3Y5404 TIME 08:44 AM ESTIMATE NO. 01 BID OPENING 05/05/11 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/11 R.E. NAME: CHAVEZ, EFRAIM DATE OF THIS ESTIMATE 10/25/11 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 924,512.75 924,512.75 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 924,512.75 924,512.75 026 MOBILIZATION LS 103,000.0000 103,000.00 0.750 77,250.00 0.750 77,250.00 ORIGINAL CONTRACT AMOUNT 7,819,615.00 TOTAL WORK COMPLETED 1,001,762.75 1,001,762.75 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 1,001,762.75 1,001,762.75 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 06/24/11 140 00/00/00 07/11/11 02/01/12 69 3 0 0 13% 49% PROGRESS IS SATISFACTORY CHAVEZ, EFRAIM RESIDENT ENGINEER PROGRAM CAS145 DATE 10/25/11