PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 08/24/07 EST. NO.02 TIME 09:25 AM R.E. NAME: JAHROMI, REZA 07-458004 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 08/24/07 EST. NO.02 TIME 09:25 AM R.E. NAME: JAHROMI, REZA 07-458004 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 08/24/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-458004 TIME 09:25 AM ESTIMATE NO. 02 BID OPENING 05/03/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/07 R.E. NAME: JAHROMI, REZA DATE OF THIS ESTIMATE 08/24/07 LOCATION RERUN PROGRESS ESTIMATE 07-LA-91-R11.7/R11.7 ----------------------- O'DONNEL CONSTRUCTION INC IN LOS ANGELES COUNTY IN LONG BEACH 579 W. COVINA BLVD. AT ROUTE 91 AND 710 SEPARATION SAN DIMAS, CA 91773-2911 FED. AID NO. N O N E REPAIR DAMAGED RAILING AND SPALLS ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 CONSTRUCTION SITE MANAGEMENT LS 3,000.0000 3,000.00 0.140 420.00 0.140 420.00 02 PREPARE WATER POLLUTION CONTROL LS 1,500.0000 1,500.00 0.500 750.00 0.500 750.00 PROGRAM 03 TEMPORARY DRAINAGE INLET PROTECTION EA 250.0000 750.00 0.000 0.00 04 STREET SWEEPING LS 500.0000 500.00 0.000 0.00 05 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 1,500.0000 1,500.00 0.000 0.00 06 CONSTRUCTION AREA SIGNS LS 2,500.0000 2,500.00 0.080 200.00 0.330 825.00 S) 07 TRAFFIC CONTROL SYSTEM LS 23,000.0000 23,000.00 0.200 4,600.00 0.200 4,600.00 S) 08 CHANNELIZER (SURFACE MOUNTED) EA 35.0000 210.00 6.000 210.00 6.000 210.00 S) 09 TEMPORARY RAILING (TYPE K) M 80.0000 14,400.00 120.000 9,600.00 120.000 9,600.00 10 TEMPORARY CRASH CUSHION MODULE EA 300.0000 3,300.00 11.000 3,300.00 11.000 3,300.00 S) 11 TEMPORARY TRAFFIC SCREEN M 12.0000 2,160.00 0.000 0.00 S) 12 BRIDGE REMOVAL (PORTION) LS 30,000.0000 30,000.00 1.000 30,000.00 1.000 30,000.00 13 CONCRETE BARRIER (TYPE 9 MODIFIED) M 700.0000 94,500.00 0.000 0.00 PROGRAM CAS145 PAGE 2 DATE 08/24/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-458004 TIME 09:25 AM ESTIMATE NO. 02 BID OPENING 05/03/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/07 R.E. NAME: JAHROMI, REZA DATE OF THIS ESTIMATE 08/24/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 49,080.00 49,705.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 49,080.00 49,705.00 14 MOBILIZATION LS 18,000.0000 18,000.00 0.950 17,100.00 0.950 17,100.00 ORIGINAL CONTRACT AMOUNT 195,320.00 TOTAL WORK COMPLETED 66,180.00 66,805.00 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 66,180.00 66,805.00 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 06/06/07 45 07/16/07 06/21/07 08/30/07 37 2 0 0 34% 82% PROGRESS IS SATISFACTORY UNSATIS PROGRESS OVERRIDEN BECAU TIME EXTENSION PENDING JAHROMI, REZA RESIDENT ENGINEER PROGRAM CAS145 DATE 08/24/07