PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 09/21/07 EST. NO.03 TIME 03:29 PM R.E. NAME: JAHROMI, REZA 07-458004 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 09/21/07 EST. NO.03 TIME 03:29 PM R.E. NAME: JAHROMI, REZA 07-458004 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 09/21/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-458004 TIME 03:29 PM ESTIMATE NO. 03 BID OPENING 05/03/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/07 R.E. NAME: JAHROMI, REZA DATE OF THIS ESTIMATE 09/21/07 LOCATION PROGRESS ESTIMATE 07-LA-91-R11.7/R11.7 ----------------- O'DONNEL CONSTRUCTION INC IN LOS ANGELES COUNTY IN LONG BEACH 579 W. COVINA BLVD. AT ROUTE 91 AND 710 SEPARATION SAN DIMAS, CA 91773-2911 FED. AID NO. N O N E REPAIR DAMAGED RAILING AND SPALLS ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 CONSTRUCTION SITE MANAGEMENT LS 3,000.0000 3,000.00 0.120 360.00 0.260 780.00 02 PREPARE WATER POLLUTION CONTROL LS 1,500.0000 1,500.00 0.500 750.00 PROGRAM 03 TEMPORARY DRAINAGE INLET PROTECTION EA 250.0000 750.00 3.000 750.00 3.000 750.00 04 STREET SWEEPING LS 500.0000 500.00 0.250 125.00 0.250 125.00 05 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 1,500.0000 1,500.00 0.500 750.00 0.500 750.00 06 CONSTRUCTION AREA SIGNS LS 2,500.0000 2,500.00 0.170 425.00 0.500 1,250.00 S) 07 TRAFFIC CONTROL SYSTEM LS 23,000.0000 23,000.00 0.300 6,900.00 0.500 11,500.00 S) 08 CHANNELIZER (SURFACE MOUNTED) EA 35.0000 210.00 6.000 210.00 S) 09 TEMPORARY RAILING (TYPE K) M 80.0000 14,400.00 120.000 9,600.00 10 TEMPORARY CRASH CUSHION MODULE EA 300.0000 3,300.00 11.000 3,300.00 S) 11 TEMPORARY TRAFFIC SCREEN M 12.0000 2,160.00 120.000 1,440.00 120.000 1,440.00 S) 12 BRIDGE REMOVAL (PORTION) LS 30,000.0000 30,000.00 1.000 30,000.00 13 CONCRETE BARRIER (TYPE 9 MODIFIED) M 700.0000 94,500.00 101.000 70,700.00 101.000 70,700.00 PROGRAM CAS145 PAGE 2 DATE 09/21/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-458004 TIME 03:29 PM ESTIMATE NO. 03 BID OPENING 05/03/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/07 R.E. NAME: JAHROMI, REZA DATE OF THIS ESTIMATE 09/21/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 81,450.00 131,155.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 81,450.00 131,155.00 14 MOBILIZATION LS 18,000.0000 18,000.00 0.050 900.00 1.000 18,000.00 ORIGINAL CONTRACT AMOUNT 195,320.00 TOTAL WORK COMPLETED 82,350.00 149,155.00 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 82,350.00 149,155.00 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 06/06/07 45 07/16/07 06/21/07 10/16/07 28 30 0 0 74% 62% PROGRESS IS SATISFACTORY JAHROMI, REZA RESIDENT ENGINEER PROGRAM CAS145 PAGE 3 DATE 09/21/07