PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 11/05/07 EST. NO.04 TIME 10:27 AM R.E. NAME: JAHROMI, REZA 07-458004 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 11/05/07 EST. NO.04 TIME 10:27 AM R.E. NAME: JAHROMI, REZA 07-458004 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 11/05/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-458004 TIME 10:27 AM ESTIMATE NO. 04 BID OPENING 05/03/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/12/07 R.E. NAME: JAHROMI, REZA DATE OF THIS ESTIMATE 11/05/07 LOCATION PROGRESS ESTIMATE AFTER ACCEPTANCE 07-LA-91-R11.7/R11.7 ---------------------------------- O'DONNEL CONSTRUCTION INC IN LOS ANGELES COUNTY IN LONG BEACH 579 W. COVINA BLVD. AT ROUTE 91 AND 710 SEPARATION SAN DIMAS, CA 91773-2911 FED. AID NO. N O N E REPAIR DAMAGED RAILING AND SPALLS ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 CONSTRUCTION SITE MANAGEMENT LS 3,000.0000 3,000.00 0.740 2,220.00 1.000 3,000.00 02 PREPARE WATER POLLUTION CONTROL LS 1,500.0000 1,500.00 0.500 750.00 1.000 1,500.00 PROGRAM 03 TEMPORARY DRAINAGE INLET PROTECTION EA 250.0000 750.00 3.000 750.00 04 STREET SWEEPING LS 500.0000 500.00 0.750 375.00 1.000 500.00 05 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 1,500.0000 1,500.00 0.500 750.00 1.000 1,500.00 06 CONSTRUCTION AREA SIGNS LS 2,500.0000 2,500.00 0.500 1,250.00 1.000 2,500.00 S) 07 TRAFFIC CONTROL SYSTEM LS 23,000.0000 23,000.00 0.500 11,500.00 1.000 23,000.00 S) 08 CHANNELIZER (SURFACE MOUNTED) EA 35.0000 210.00 6.000 210.00 S) 09 TEMPORARY RAILING (TYPE K) M 80.0000 14,400.00 60.000 4,800.00 180.000 14,400.00 10 TEMPORARY CRASH CUSHION MODULE EA 300.0000 3,300.00 11.000 3,300.00 S) 11 TEMPORARY TRAFFIC SCREEN M 12.0000 2,160.00 60.000 720.00 180.000 2,160.00 S) 12 BRIDGE REMOVAL (PORTION) LS 30,000.0000 30,000.00 1.000 30,000.00 13 CONCRETE BARRIER (TYPE 9 MODIFIED) M 700.0000 94,500.00 34.000 23,800.00 135.000 94,500.00 PROGRAM CAS145 PAGE 2 DATE 11/05/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-458004 TIME 10:27 AM ESTIMATE NO. 04 BID OPENING 05/03/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/12/07 R.E. NAME: JAHROMI, REZA DATE OF THIS ESTIMATE 11/05/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 46,165.00 177,320.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 46,165.00 177,320.00 14 MOBILIZATION LS 18,000.0000 18,000.00 1.000 18,000.00 ORIGINAL CONTRACT AMOUNT 195,320.00 TOTAL WORK COMPLETED 46,165.00 195,320.00 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 46,165.00 195,320.00 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN JOB COM- WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR PLETED ON DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 06/06/07 45 07/16/07 06/21/07 10/12/07 54 24 0 30 100% 100% JAHROMI, REZA RESIDENT ENGINEER PROGRAM CAS145 DATE 11/05/07