PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 01/26/10 EST. NO.06 TIME 11:34 AM R.E. NAME: ROBILLOS, RAMON 07-4S3704 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 004 0004 5,429.84 E.W. @ F.A.(+) 100509 N 4 0 0005 489.17 100709 N 5 0 0006 596.53 100909 N 6 0 0008 1,281.67 021308 N 8 0 0010 872.67 111009 N 10 0 0011 977.50 110309 N 9A 0 9,647.38 TOTAL THIS ESTIMATE 111,731.95 TOTAL PREVIOUS ESTIMATE 121,379.33 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 01/26/10 EST. NO.06 TIME 11:34 AM R.E. NAME: ROBILLOS, RAMON 07-4S3704 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- OVERBID ITEMS OVERBID ITEM NO. 008 -13,000.00 01 0.00 -13,000.00 TOTAL DEDUCTIONS 0.00 -13,000.00 PROGRAM CAS145 PAGE 1 DATE 01/26/10 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-4S3704 TIME 11:34 AM ESTIMATE NO. 06 BID OPENING 09/11/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 01/20/10 R.E. NAME: ROBILLOS, RAMON DATE OF THIS ESTIMATE 01/26/10 LOCATION PROGRESS ESTIMATE 07-LA-1-47.5/62.2 ----------------- DREAMBUILDER IN LOS ANGELES COUNTY IN MALIBU AT 1361 E GARTEN DRIVE VARIOUS LOCATIONS FROM 0.1 MILE PLACENTIA CA 92870 WEST OF WEBB WAY TO 0.1 MILE EAST OF MULHOLLAND HIGHWAY FED. AID NO. OTS- ( ) INSTALL METAL BEAM GUARD RAIL ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 CONSTRUCTION SITE MANAGEMENT LS 3,000.0000 3,000.00 1.000 3,000.00 02 PREPARE WATER POLLUTION CONTROL LS 900.0000 900.00 1.000 900.00 S) PROGRAM 03 TEMPORARY DRAINAGE INLET PROTECTION EA 250.0000 2,000.00 8.000 2,000.00 04 STREET SWEEPING LS 2,500.0000 2,500.00 1.000 2,500.00 05 CONSTRUCTION AREA SIGNS LS 2,400.0000 2,400.00 0.850 2,040.00 S) 06 TRAFFIC CONTROL SYSTEM LS 46,416.4000 46,416.40 1.000 46,416.40 S) 07 REMOVE ASPHALT CONCRETE DIKE LF 3.9000 8,385.00 2,211.000 8,622.90 08 CLEARING AND GRUBBING LS 18,000.0000 18,000.00 1.000 18,000.00 09 LEAD COMPLIANCE PLAN LS 1,400.0000 1,400.00 1.000 1,400.00 S) 10 IMPORTED BORROW CY 95.0000 2,280.00 149.000 14,155.00 11 IMPORTED MATERIAL (SHOULDER BACKING) TON 1,000.0000 1,000.00 0.000 0.00 12 HOT MIX ASPHALT (TYPE B) TON 160.0000 8,000.00 94.590 15,134.40 13 PLACE HOT MIX ASPHALT DIKE (TYPE A) LF 7.0000 9,240.00 2,152.000 15,064.00 14 PLACE HOT MIX ASPHALT DIKE (TYPE C) LF 7.0000 1,120.00 759.600 5,317.20 15 PLACE HOT MIX ASPHALT DIKE (TYPE F) LF 7.0000 5,740.00 0.000 0.00 16 PLACE HOT MIX ASPHALT SQYD 68.0000 149.60 109.900 7,473.20 (MISCELLANEOUS AREA) 17 GUARD RAILING DELINEATOR EA 30.0000 3,900.00 130.000 3,900.00 18 METAL BEAM GUARD RAILING (WOOD POST) LF 20.8000 21,840.00 250.000 5,200.00 19 METAL BEAM GUARD RAILING (WOOD POST) LF 30.0000 55,200.00 2,650.500 79,515.00 (MODIFIED) 20 WEED CONTROL MAT (RUBBER) SQYD 44.0000 36,520.00 830.000 36,520.00 21 END ANCHOR ASSEMBLY (TYPE SFT) EA 1,040.0000 5,200.00 5.000 5,200.00 22 ALTERNATIVE IN-LINE TERMINAL SYSTEM EA 4,500.0000 13,500.00 3.000 13,500.00 PROGRAM CAS145 PAGE 2 DATE 01/26/10 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-4S3704 TIME 11:34 AM ESTIMATE NO. 06 BID OPENING 09/11/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 01/20/10 R.E. NAME: ROBILLOS, RAMON DATE OF THIS ESTIMATE 01/26/10 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 2,700.0000 2,700.00 1.000 2,700.00 SYSTEM ELEMENTS DURING CONSTRUCTION PROGRAM CAS145 PAGE 3 DATE 01/26/10 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-4S3704 TIME 11:34 AM ESTIMATE NO. 06 BID OPENING 09/11/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 01/20/10 R.E. NAME: ROBILLOS, RAMON DATE OF THIS ESTIMATE 01/26/10 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 0.00 288,558.10 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 9,647.38 121,379.33 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 9,647.38 409,937.43 24 MOBILIZATION LS 9,670.0000 9,670.00 1.000 9,670.00 ORIGINAL CONTRACT AMOUNT 261,061.00 TOTAL WORK COMPLETED 9,647.38 419,607.43 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 -13,000.00 TOTAL 9,647.38 406,607.43 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE MAXIMUM CONTRACT OVERBID VALUE PRICE AMOUNT 008 CLEARING AND GRUBBING 5,000.00 18,000.00 13,000.00 DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 10/28/08 80 09/02/09 00/00/00 01/30/10 24 210 28 0 99% 22% PROGRESS IS SATISFACTORY *** SUSPENDED ON 11/20/09. ROBILLOS, RAMON RESIDENT ENGINEER PROGRAM CAS145 DATE 01/26/10