PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 06/15/09 EST. NO.01 TIME 12:58 PM R.E. NAME: WANG, PAUL 07-4S7104 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 06/15/09 EST. NO.01 TIME 12:58 PM R.E. NAME: WANG, PAUL 07-4S7104 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 06/15/09 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-4S7104 TIME 12:58 PM ESTIMATE NO. 01 BID OPENING 01/29/09 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/09 R.E. NAME: WANG, PAUL DATE OF THIS ESTIMATE 06/15/09 LOCATION PROGRESS ESTIMATE 07-LA-1-4.2/4.2 ----------------- FREEWAY ELECTRIC IN LOS ANGELES COUNTY IN LONG BEACH P.O. BOX 7745 SIGNAL HILL, AND BELLFLOWER AT RIVERSIDE, CA 92513-7745 VARIOUS LOCATIONS FED. AID NO. N O N E INSTALL LEFT TURN SIGNALS ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 CONSTRUCTION SITE MANAGEMENT LS 500.0000 500.00 0.000 0.00 02 PREPARE WATER POLLUTION CONTROL LS 800.0000 800.00 1.000 800.00 1.000 800.00 PROGRAM 03 TEMPORARY GRAVEL BAG BERM LF 10.0000 200.00 0.000 0.00 04 STREET SWEEPING LS 500.0000 500.00 0.000 0.00 05 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 250.0000 250.00 0.000 0.00 06 CONSTRUCTION AREA SIGNS LS 2,000.0000 2,000.00 0.500 1,000.00 0.500 1,000.00 07 TRAFFIC CONTROL SYSTEM LS 5,500.0000 5,500.00 0.000 0.00 08 FURNISH LAMINATED PANEL SIGN (1"-TYPE A) SQFT 15.0000 945.00 0.000 0.00 09 INSTALL SIGN (STRAP AND SADDLE BRACKET EA 40.0000 80.00 0.000 0.00 METHOD) 10 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 500.0000 500.00 0.000 0.00 SYSTEM ELEMENTS DURING CONSTRUCTION 11 MODIFY SIGNAL AND LIGHTING (LOCATION 1) LS 43,100.0000 43,100.00 0.000 0.00 12 MODIFY SIGNAL AND LIGHTING (LOCATION 2) LS 37,000.0000 37,000.00 0.000 0.00 13 MODIFY SIGNAL AND LIGHTING (LOCATION 3) LS 184,406.0000 184,406.00 0.000 0.00 PROGRAM CAS145 PAGE 2 DATE 06/15/09 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-4S7104 TIME 12:58 PM ESTIMATE NO. 01 BID OPENING 01/29/09 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/09 R.E. NAME: WANG, PAUL DATE OF THIS ESTIMATE 06/15/09 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 1,800.00 1,800.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 1,800.00 1,800.00 14 MOBILIZATION LS 5,500.0000 5,500.00 0.000 0.00 ORIGINAL CONTRACT AMOUNT 281,281.00 TOTAL WORK COMPLETED 1,800.00 1,800.00 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 1,800.00 1,800.00 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 03/05/09 60 00/00/00 03/20/09 08/21/09 10 49 0 0 1% 17% PROGRESS IS SATISFACTORY *** SUSPENDED ON 03/20/09. WANG, PAUL RESIDENT ENGINEER PROGRAM CAS145 PAGE 2 DATE 06/15/09