PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 08/08/13 EST. NO.20 TIME 01:57 PM R.E. NAME: SAYKALI, ZARIF 07-4T0204 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 08/08/13 EST. NO.20 TIME 01:57 PM R.E. NAME: SAYKALI, ZARIF 07-4T0204 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 08/08/13 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-4T0204 TIME 01:57 PM ESTIMATE NO. 20 BID OPENING 06/04/09 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/22/13 R.E. NAME: SAYKALI, ZARIF DATE OF THIS ESTIMATE 08/08/13 LOCATION FINAL ESTIMATE 07-LA-27-11.0/15.9 -------------- HIGH LIGHT ELECTRIC INC. IN LOS ANGELES COUNTY IN PO BOX 7339 LOS ANGELES FROM MULHOLLAND DRIVE RIVERSIDE, CA 92513 TO SCHOENBORN STREET FED. AID NO. N O N E INSTALL TRAFFIC SIGNALS ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 SMALL BUSINESS UTILIZATION REPORT EA 250.0000 500.00 0.000 0 002 CONSTRUCTION SITE MANAGEMENT LS 457.0000 457.00 1.000 457 003 PREPARE WATER POLLUTION CONTROL LS 801.0000 801.00 1.000 801 PROGRAM 004 TEMPORARY DRAINAGE INLET PROTECTION EA 187.0000 2,057.00 10.000 1,870 005 STREET SWEEPING LS 2,600.0000 2,600.00 1.000 2,600 006 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 286.0000 286.00 1.000 286 007 CONSTRUCTION AREA SIGNS LS 9,600.0000 9,600.00 1.000 9,600 008 TRAFFIC CONTROL SYSTEM LS 13,932.0000 13,932.00 1.000 13,932 009 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 0.2900 252.30 870.000 252 STRIPE 010 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 0.2900 426.30 1,470.000 426 011 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 1.0000 400.00 436.000 436 012 REMOVE ROADSIDE SIGN (METAL POST) EA 1.1500 5.75 5.000 5 013 REMOVE ROADSIDE SIGN EA 34.0000 374.00 11.000 374 (STRAP AND SADDLE BRACKET METHOD) 014 RELOCATE ROADSIDE SIGN-ONE POST EA 165.0000 165.00 1.000 165 015 REMOVE CONCRETE CY 286.0000 3,718.00 15.250 4,361 016 ROADWAY EXCAVATION CY 200.0000 2,600.00 12.540 2,508 017 LEAD COMPLIANCE PLAN LS 1,200.0000 1,200.00 1.000 1,200 018 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 13.0000 1,950.00 150.000 1,950 (0.063"-UNFRAMED) 019 ROADSIDE SIGN - ONE POST EA 200.0000 1,000.00 5.000 1,000 020 INSTALL SIGN (STRAP AND SADDLE BRACKET EA 112.0000 3,248.00 29.000 3,248 METHOD) 021 PAINT CURB (2-COAT) SQFT 1.1500 287.50 250.000 287 022 MINOR CONCRETE (CURB, SIDEWALK AND CY 500.0000 6,500.00 14.980 7,490 CURB RAMP) PROGRAM CAS145 PAGE 2 DATE 08/08/13 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-4T0204 TIME 01:57 PM ESTIMATE NO. 20 BID OPENING 06/04/09 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/22/13 R.E. NAME: SAYKALI, ZARIF DATE OF THIS ESTIMATE 08/08/13 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.5000 570.00 1,140.000 570 024 8" THERMOPLASTIC TRAFFIC STRIPE LF 1.1500 448.50 630.000 724 025 THERMOPLASTIC PAVEMENT MARKING SQFT 2.0000 960.00 480.000 960 026 THERMOPLASTIC CROSSWALK AND SQFT 2.5800 799.80 314.000 810 PAVEMENT MARKING 027 PAVEMENT MARKER (RETROREFLECTIVE) EA 4.4000 171.60 47.000 206 028 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 4,000.0000 4,000.00 1.000 4,000 SYSTEM ELEMENTS DURING CONSTRUCTION 029 SIGNAL AND LIGHTING (TEMPORARY) LS 17,500.0000 17,500.00 1.000 17,500 030 SIGNAL AND LIGHTING LS 143,000.0000 143,000.00 1.000 143,000 031 FLASHING BEACON AND LIGHTING LS 25,000.0000 25,000.00 1.000 25,000 032 MODIFY SIGNAL AND LIGHTING LS 46,500.0000 46,500.00 1.000 46,500 033 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 034 REMOVE PAVEMENT MARKER EA 11.5800 428.46 44.000 509 PROGRAM CAS145 PAGE 3 DATE 08/08/13 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-4T0204 TIME 01:57 PM ESTIMATE NO. 20 BID OPENING 06/04/09 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/22/13 R.E. NAME: SAYKALI, ZARIF DATE OF THIS ESTIMATE 08/08/13 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 0.00 293,031.29 ADJUSTMENT OF COMPENSATION 0.00 63,574.14 EXTRA WORK 0.00 155,967.46 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 0.00 512,572.89 035 MOBILIZATION LS 30,000.0000 30,000.00 1.000 30,000 ORIGINAL CONTRACT AMOUNT 321,738.21 TOTAL WORK COMPLETED 0.00 542,572.89 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 0.00 542,572.89 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN JOB COM- WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR PLETED ON DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 07/09/09 60 04/26/10 04/26/10 04/22/13 60 837 34 0 100% 100% SAYKALI, ZARIF RESIDENT ENGINEER PROGRAM CAS145 DATE 08/08/13