PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 06/12/17 EST. NO. 007 TIME 08:57 AM R.E. NAME: FARDOUN, MIKE 07-4T7104 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 003 0001 2,618.12 A.C. @ L.S.(+) 050517 N 0001 0 004 0001 11,352.56 A.C. @ L.S.(+) 050517 N 0001 0 005 0001 3,202.50 A.C. @ L.S.(+) 051617 N 0001 0 17,173.18 TOTAL THIS ESTIMATE 0.00 TOTAL PREVIOUS ESTIMATE 17,173.18 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 06/12/17 EST. NO. 007 TIME 08:57 AM R.E. NAME: FARDOUN, MIKE 07-4T7104 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- LABOR COMPLIANCE VIOLATION MISSING PAYROLLS -2,000.00 007 -2,000.00 -2,000.00 TOTAL DEDUCTIONS -2,000.00 -2,000.00 PROGRAM CAS145 PAGE 1 DATE 06/12/17 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-4T7104 TIME 08:57 AM ESTIMATE NO. 007 BID OPENING 05/11/16 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/09/17 R.E. NAME: FARDOUN, MIKE DATE OF THIS ESTIMATE 06/12/17 LOCATION PROGRESS ESTIMATE AFTER ACCEPTANCE 07-LA-66-2.9/2.9 ---------------------------------- FERREIRA CONSTRUCTION CO,, IN LOS ANGELES COUNTY AT FOOTHILL INC. BOULEVARD AND SUMNER AVENUE, IN THE 15188 VISTA DEL RIO AVE CITY OF POMONA CHINO CA 91710 FED. AID NO. HSST-PG ( ) ,S066-009E( ) INSTALL TRAFFIC SIGNAL ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 5,000.0000 5,000.00 1.000 5,000 002 CONSTRUCTION AREA SIGNS LS 3,000.0000 3,000.00 0.300 900.00 1.000 3,000 003 TRAFFIC CONTROL SYSTEM LS 20,000.0000 20,000.00 1.000 20,000 004 JOB SITE MANAGEMENT LS 5,000.0000 5,000.00 1.000 5,000 005 PREPARE WATER POLLUTION CONTROL PROGRAM LS 2,500.0000 2,500.00 1.000 2,500 006 TEMPORARY DRAINAGE INLET PROTECTION EA 200.0000 800.00 4.000 800 007 TEMPORARY GRAVEL BAG BERM LF 5.0000 500.00 100.000 500.00 100.000 500 008 TEMPORARY CONCRETE WASHOUT LS 5,000.0000 5,000.00 1.000 5,000 009 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 10.1000 1,818.00 180.000 1,818 STRIPE (HAZARDOUS WASTE) 010 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 5.5000 1,595.00 290.000 1,595 011 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 11.0000 638.00 58.000 638 012 REMOVE PAVEMENT MARKER EA 6.0000 192.00 32.000 192 013 REMOVE ROADSIDE SIGN (METAL POST) EA 110.0000 330.00 3.000 330 014 RELOCATE ROADSIDE SIGN (METAL POST) EA 275.0000 275.00 1.000 275 015 REMOVE CONCRETE CY 135.0000 13,500.00 100.000 13,500 (CURB, GUTTER, AND SIDEWALK) (CY) 016 ROADWAY EXCAVATION CY 135.0000 13,500.00 100.000 13,500 017 IMPORTED BORROW (CY) CY 120.0000 6,480.00 54.000 6,480 018 MINOR CONCRETE (MINOR STRUCTURE) CY 4,500.0000 4,500.00 0.000 0 (F) 019 METAL (ROADSIDE SIGN) LB 7.7000 616.00 80.000 616 020 INSTALL SIGN (STRAP AND SADDLE BRACKET EA 110.0000 550.00 5.000 550 METHOD) 021 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 7.7000 539.00 70.000 539 (0.063"-UNFRAMED) FOR RETROREFLECTIVE SHEETING (TYPE XI) PROGRAM CAS145 PAGE 2 DATE 06/12/17 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-4T7104 TIME 08:57 AM ESTIMATE NO. 007 BID OPENING 05/11/16 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/09/17 R.E. NAME: FARDOUN, MIKE DATE OF THIS ESTIMATE 06/12/17 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 022 RETROREFLECTIVE SHEETING (TYPE XI) SQFT 7.7000 539.00 70.000 539 023 PAINT CURB (2-COAT) SQFT 11.0000 396.00 36.000 396 024 15" REINFORCED CONCRETE PIPE LF 300.0000 10,800.00 0.000 0 025 DETECTABLE WARNING SURFACE SQFT 49.0000 2,744.00 56.000 2,744 026 MINOR CONCRETE (CURB, SIDEWALK AND CY 405.0000 40,500.00 100.000 40,500 CURB RAMP) 027 MISCELLANEOUS IRON AND STEEL LB 20.0000 4,980.00 0.000 0 (F) 028 4" THERMOPLASTIC TRAFFIC STRIPE LF 3.3000 1,122.00 340.000 1,122 029 8" THERMOPLASTIC TRAFFIC STRIPE LF 5.5000 660.00 120.000 660 030 THERMOPLASTIC PAVEMENT MARKING SQFT 17.0000 5,270.00 310.000 5,270 (PREFORMED) 031 4" THERMOPLASTIC TRAFFIC STRIPE LF 11.0000 935.00 85.000 935 (BROKEN 6-1) 032 PAVEMENT MARKER (RETROREFLECTIVE) EA 11.0000 275.00 25.000 275 033 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 5,000.0000 5,000.00 1.000 5,000 SYSTEM ELEMENTS DURING CONSTRUCTION 034 SIGNAL AND LIGHTING LS 194,617.0000 194,617.00 1.000 194,617 035 MODIFY COMMUNICATION SYSTEM LS 25,900.0000 25,900.00 1.000 25,900 036 SYSTEM TESTING AND DOCUMENTATION LS 8,250.0000 8,250.00 1.000 8,250.00 1.000 8,250 PROGRAM CAS145 PAGE 3 DATE 06/12/17 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-4T7104 TIME 08:57 AM ESTIMATE NO. 007 BID OPENING 05/11/16 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/09/17 R.E. NAME: FARDOUN, MIKE DATE OF THIS ESTIMATE 06/12/17 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 9,650.00 368,041.00 ADJUSTMENT OF COMPENSATION 17,173.18 17,173.18 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 26,823.18 385,214.18 037 MOBILIZATION LS 15,600.0000 15,600.00 1.000 15,600 ORIGINAL CONTRACT AMOUNT 403,921.00 TOTAL WORK COMPLETED 26,823.18 400,814.18 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS -2,000.00 -2,000.00 TOTAL 24,823.18 398,814.18 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN JOB COM- WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR PLETED ON DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 07/05/16 70 11/02/16 07/20/16 05/09/17 70 129 0 0 100% 100% FARDOUN, MIKE RESIDENT ENGINEER PROGRAM CAS145 DATE 06/12/17