PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 06/21/18 EST. NO. 006 TIME 03:25 PM R.E. NAME: DAVIS, ALAN 07-4T8204 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 06/21/18 EST. NO. 006 TIME 03:25 PM R.E. NAME: DAVIS, ALAN 07-4T8204 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE LIQUIDATED DAMAGES -16,000.00 003 CEM 2406 JAN 2018 -17,613.00 004 RETURN LD DEDUCTION 16,000.00 004 CEM 2406 JAN 2018 17,613.00 005 0.00 0.00 LABOR COMPLIANCE VIOLATION CPR DEC 2017 -4,000.00 003 CPR DEC 2017 4,000.00 004 0.00 0.00 LIQUIDATED DAMAGES 3 DAYS @ $3,200/DAY -9,600.00 005 0 DAY@ $3,200/DAY 9,600.00 006 9,600.00 0.00 TOTAL DEDUCTIONS 9,600.00 0.00 PROGRAM CAS145 PAGE 1 DATE 06/21/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-4T8204 TIME 03:25 PM ESTIMATE NO. 006 BID OPENING 06/14/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/21/18 R.E. NAME: DAVIS, ALAN DATE OF THIS ESTIMATE 06/21/18 LOCATION SEMI-FINAL ESTIMATE 07-VEN-150-8.7/29.8 ------------------- C&W CONSTRUCTION SPECIALTIES, IN VENTURA COUNTY , ALONG ROUTE 150 INC. 2419 PALMA DRIVE VENTURA CA 93003 FED. AID NO. STHG-P150(27)E UPGRADE & REPLACE GUARDRAIL ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 803.2500 803.25 1.000 803 002 CONSTRUCTION AREA SIGNS LS 5,869.5000 5,869.50 1.000 5,869 003 TRAFFIC CONTROL SYSTEM LS 93,736.0000 93,736.00 1.000 93,736 004 JOB SITE MANAGEMENT LS 1,407.0000 1,407.00 1.000 1,407 005 PREPARE WATER POLLUTION CONTROL PROGRAM LS 509.2500 509.25 1.000 509 006 TEMPORARY FIBER ROLL LF 4.8000 6,240.00 1,500.000 7,200 007 TEMPORARY CONCRETE WASHOUT LS 2,382.0000 2,382.00 1.000 2,382 008 TREATED WOOD WASTE LB 0.2600 7,566.00 29,720.000 7,727 009 ROADWAY EXCAVATION CY 392.7000 25,525.50 48.630 19,097 010 IMPORTED BORROW (CY) CY 137.5500 33,012.00 33.150 4,559 011 HOT MIX ASPHALT (TYPE A) TON 4,935.0000 987.00 0.200 987 012 PLACE HOT MIX ASPHALT DIKE (TYPE C) LF 658.3500 6,583.50 10.000 6,583 013 REMOVE ASPHALT CONCRETE DIKE LF 148.0500 1,480.50 10.000 1,480 014 24" CAST-IN-DRILLED-HOLE CONCRETE PILING LF 190.7100 24,792.30 125.000 23,838 015 GUARD RAILING DELINEATOR EA 17.0000 2,890.00 169.000 2,873 016 MIDWEST GUARDRAIL SYSTEM (8' POST) LF 51.6400 68,164.80 1,337.500 69,068 017 VEGETATION CONTROL (MINOR CONCRETE) SQYD 57.9000 31,266.00 569.900 32,997 018 ALTERNATIVE IN-LINE TERMINAL SYSTEM EA 2,879.0000 28,790.00 9.000 25,911 019 ALTERNATIVE FLARED TERMINAL SYSTEM EA 2,472.0000 9,888.00 4.000 9,888 020 REMOVE GUARDRAIL LF 6.9200 11,764.00 1,700.000 11,764 PROGRAM CAS145 PAGE 2 DATE 06/21/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-4T8204 TIME 03:25 PM ESTIMATE NO. 006 BID OPENING 06/14/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/21/18 R.E. NAME: DAVIS, ALAN DATE OF THIS ESTIMATE 06/21/18 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 0.00 328,682.44 ADJUSTMENT OF COMPENSATION 0.00 12,015.88 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 0.00 340,698.32 021 MOBILIZATION LS 2,821.0000 2,821.00 1.000 2,821 ORIGINAL CONTRACT AMOUNT 366,477.60 TOTAL WORK COMPLETED 0.00 343,519.32 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 9,600.00 0.00 TOTAL 9,600.00 343,519.32 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN JOB COM- WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR PLETED ON DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 07/27/17 60 07/27/17 00/00/00 02/21/18 59 69 0 0 100% 100% DAVIS, ALAN RESIDENT ENGINEER PROGRAM CAS145 DATE 06/21/18