PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 09/16/24 EST. NO. 008 TIME 08:36 PM R.E. NAME: SHIN, FRANK 07-4V0304 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0001 11,152.36 E.W. @ F.A.(+) 112923 N 0001.0 0002 2,039.56 121523 N 0002.0 0003 2,368.58 013124 N 0003.0 15,560.50 TOTAL THIS ESTIMATE 0.00 TOTAL PREVIOUS ESTIMATE 15,560.50 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 09/16/24 EST. NO. 008 TIME 08:36 PM R.E. NAME: SHIN, FRANK 07-4V0304 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- LABOR COMPLIANCE VIOLATION MISS CPRS 2/24 3/24 -20,000.00 003 MISSING LC REQ DOCU -10,000.00 003 MISS CPRS 2/24 3/24 20,000.00 004 MISSING LC REQ DOCU 10,000.00 004 0.00 0.00 TOTAL DEDUCTIONS 0.00 0.00 PROGRAM CAS145 PAGE 1 DATE 09/16/24 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-4V0304 TIME 08:36 PM ESTIMATE NO. 008 BID OPENING 04/29/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/24 R.E. NAME: SHIN, FRANK DATE OF THIS ESTIMATE 09/16/24 LOCATION RERUN PROGRESS ESTIMATE 07-LA-90-1.8/1.8 ----------------------- CROSSTOWN ELECTRICAL AND DATA, LA COUNTY IN LOS ANGELES CITY, RTE INC. 90 ON/OFF RAMP AT CULVER BOULEVARD 5454 DIAZ STREET; IRWINDALE CA 91706 FED. AID NO. N O N E SIGNAL IMPROVEMENT; PROTECTED LEFT ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 3,500.0000 3,500.00 1.000 3,500 002 TIME-RELATED OVERHEAD (WDAY) WDAY 600.0000 36,000.00 5.000 3,000.00 55.000 33,000 003 CONSTRUCTION AREA SIGNS LS 7,370.0000 7,370.00 0.000 0 004 TRAFFIC CONTROL SYSTEM LS 20,000.0000 20,000.00 0.700 14,000 005 TEMPORARY PEDESTRIAN ACCESS ROUTE LS 5,000.0000 5,000.00 0.350 1,750 006 JOB SITE MANAGEMENT LS 3,000.0000 3,000.00 0.350 1,050 007 PREPARE WATER POLLUTION CONTROL PROGRAM LS 550.0000 550.00 1.000 550 008 TEMPORARY DRAINAGE INLET PROTECTION EA 175.0000 525.00 2.000 350 009 TEMPORARY CONCRETE WASHOUT LS 5,000.0000 5,000.00 0.700 3,500 010 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 9.0000 1,980.00 0.000 0 STRIPE (HAZARDOUS WASTE) 011 TREATED WOOD WASTE LB 3.0000 1,830.00 0.000 0 012 ROADWAY EXCAVATION CY 175.0000 33,250.00 190.000 33,250 013 PRUNE EXISTING PLANTS LS 1,500.0000 1,500.00 0.000 0 014 ROCK BLANKET SQFT 23.2500 11,160.00 451.000 10,485 015 CLASS 3 AGGREGATE BASE (CY) CY 135.0000 12,825.00 95.000 12,825 016 LEAN CONCRETE BASE RAPID SETTING CY 740.0000 21,460.00 29.000 21,460 017 BASE BOND BREAKER SQYD 22.0000 1,298.00 59.000 1,298 018 HOT MIX ASPHALT (TYPE A) TON 410.0000 15,170.00 37.000 15,170 019 REMOVE ASPHALT CONCRETE PAVEMENT (SQFT) SQFT 6.1500 13,161.00 2,140.000 13,161 020 REMOVE ASPHALT CONCRETE DIKE LF 14.0000 518.00 37.000 518 021 MINOR CONCRETE (CURB) (CY) CY 1,335.0000 6,675.00 5.000 6,675 022 DETECTABLE WARNING SURFACE SQFT 43.0000 8,600.00 160.000 6,880 PROGRAM CAS145 PAGE 2 DATE 09/16/24 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-4V0304 TIME 08:36 PM ESTIMATE NO. 008 BID OPENING 04/29/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/24 R.E. NAME: SHIN, FRANK DATE OF THIS ESTIMATE 09/16/24 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 MINOR CONCRETE (MISCELLANEOUS CY 2,400.0000 1,680.00 0.700 1,680 CONSTRUCTION) 024 MINOR CONCRETE (CURB AND GUTTER) CY 600.0000 8,400.00 14.000 8,400 025 MINOR CONCRETE (CURB RAMP) CY 725.0000 24,650.00 17.260 12,513 026 REMOVE CONCRETE CY 235.0000 10,105.00 43.000 10,105 (CURB, GUTTER, AND SIDEWALK) (CY) 027 PRE/POST CONSTRUCTION SURVEYS EA 5,450.0000 5,450.00 0.000 0 028 SIGNAL AND LIGHTING (CITY) LS 434,529.7500 434,529.75 0.040 17,381.19 0.600 260,717 029 PAVEMENT MARKER (RETROREFLECTIVE) EA 5.3500 107.00 0.000 0 030 REMOVE ROADSIDE SIGN MOUNTED ON MAST ARM EA 70.0000 420.00 0.000 0 031 REMOVE ROADSIDE SIGN (WOOD POST) EA 135.0000 1,215.00 0.000 0 032 REMOVE ROADSIDE SIGN (METAL POST) EA 135.0000 135.00 0.000 0 033 REMOVE ROADSIDE SIGN EA 91.0000 1,911.00 0.000 0 (STRAP AND SADDLE BRACKET METHOD) 034 REMOVE ROADSIDE SIGN PANEL EA 91.0000 1,638.00 0.000 0 035 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 18.0000 5,040.00 0.000 0 (0.063"-UNFRAMED) 036 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 16.5000 1,509.75 0.000 0 (0.080"-UNFRAMED) 037 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 35.0000 2,887.50 0.000 0 (0.063"-FRAMED) 038 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 49.0000 2,058.00 0.000 0 (0.080"-FRAMED) 039 METAL (ROADSIDE SIGN) LB 95.0000 475.00 0.000 0 040 ROADSIDE SIGN - ONE POST EA 350.0000 4,900.00 0.000 0 041 ROADSIDE SIGN - TWO POST EA 800.0000 800.00 0.000 0 042 INSTALL SIGN (STRAP AND SADDLE BRACKET EA 135.0000 4,050.00 0.000 0 METHOD) 043 INSTALL SIGN (MAST-ARM HANGER METHOD) EA 135.0000 810.00 0.000 0 044 THERMOPLASTIC PAVEMENT STRIPE LF 2.7000 148.50 55.000 148.50 55.000 148 045 8" THERMOPLASTIC TRAFFIC STRIPE LF 2.0000 180.00 90.000 180.00 90.000 180 046 THERMOPLASTIC PAVEMENT MARKING SQFT 4.5000 12,285.00 2,754.000 12,393.00 2,754.000 12,393 047 6" THERMOPLASTIC TRAFFIC STRIPE LF 1.1000 396.00 360.000 396.00 360.000 396 (BROKEN 6-1) 048 6" THERMOPLASTIC TRAFFIC STRIPE LF 1.1000 374.00 322.000 354.20 322.000 354 (BROKEN 12-3) 049 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 2.1500 924.50 0.000 0 PROGRAM CAS145 PAGE 3 DATE 09/16/24 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-4V0304 TIME 08:36 PM ESTIMATE NO. 008 BID OPENING 04/29/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/24 R.E. NAME: SHIN, FRANK DATE OF THIS ESTIMATE 09/16/24 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 050 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 2.1500 1,849.00 708.000 1,522.20 708.000 1,522 051 CONTRAST STRIPE THERMOPLASTIC LF 2.7500 990.00 0.000 0 PROGRAM CAS145 PAGE 4 DATE 09/16/24 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-4V0304 TIME 08:36 PM ESTIMATE NO. 008 BID OPENING 04/29/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/24 R.E. NAME: SHIN, FRANK DATE OF THIS ESTIMATE 09/16/24 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 35,375.09 487,833.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 15,560.50 15,560.50 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 50,935.59 503,393.50 052 MOBILIZATION LS 25,000.0000 25,000.00 1.000 25,000 ORIGINAL CONTRACT AMOUNT 765,290.00 TOTAL WORK COMPLETED 50,935.59 528,393.50 MATERIALS ON HAND ON SITE 27,300.39 DEDUCTIONS 0.00 0.00 TOTAL 50,935.59 555,693.89 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 06/18/21 60 07/06/21 07/06/21 12/31/24 55 747 0 0 65% 92% PROGRESS IS SATISFACTORY UNSATIS PROGRESS OVERRIDEN BECAU PENDING DEF TIME *** SUSPENDED ON 08/16/21. SHIN, FRANK RESIDENT ENGINEER