PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 10/16/26 EST. NO. 012 TIME 09:03 AM R.E. NAME: GALLARDO, SAMUEL 07-4W7804 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 006 0001 196,060.29 E.W. @ L.S.(+) 092326 N 33 196,060.29 TOTAL THIS ESTIMATE 383,886.62 TOTAL PREVIOUS ESTIMATE 579,946.91 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 10/16/26 EST. NO. 012 TIME 09:03 AM R.E. NAME: GALLARDO, SAMUEL 07-4W7804 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 10/16/26 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-4W7804 TIME 09:03 AM ESTIMATE NO. 012 BID OPENING 04/15/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/23/26 R.E. NAME: GALLARDO, SAMUEL DATE OF THIS ESTIMATE 10/16/26 LOCATION PROGRESS ESTIMATE AFTER ACCEPTANCE 07-LA-110-6.8/19.5 ---------------------------------- AUTOBAHN CONSTRUCTION, INC. 07-110- PM 6.8/19.5 933 N. BATAVIA ST. ORANGE CA 92867 FED. AID NO. N O N E APPLY DECK METHACRYLATE, REPLACE ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 900.0000 900.00 1.000 900 002 TIME-RELATED OVERHEAD (WDAY) WDAY 525.0000 63,000.00 45.000 23,625.00 120.000 63,000 003 CONSTRUCTION AREA SIGNS LS 85,000.0000 85,000.00 1.000 85,000 004 TRAFFIC CONTROL SYSTEM LS 175,000.0000 175,000.00 1.000 175,000 005 CHANNELIZER (SURFACE MOUNTED) EA 60.0000 4,800.00 0.000 0 (LEFT IN PLACE) 006 PORTABLE RADAR SPEED FEEDBACK SIGN EA 120.0000 12,000.00 98.000 11,760 SYSTEM DAY 007 PORTABLE CHANGEABLE MESSAGE SIGN (EA) EA 6,000.0000 12,000.00 2.000 12,000 008 JOB SITE MANAGEMENT LS 20,000.0000 20,000.00 1.000 20,000 009 PREPARE WATER POLLUTION CONTROL PROGRAM LS 1,500.0000 1,500.00 1.000 1,500 010 TEMPORARY CONCRETE WASHOUT LS 1,500.0000 1,500.00 1.000 1,500 011 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 0.4000 13,800.00 34,720.000 13,888 STRIPE (HAZARDOUS WASTE) 012 REMOVE YELLOW THERMOPLASTIC PAVEMENT SQFT 5.0000 500.00 35.000 175 MARKING (HAZARDOUS WASTE) 013 REMOVE CHANNELIZER EA 15.0000 1,200.00 0.000 0 (SURFACE MOUNTED) 014 STRUCTURAL CONCRETE, APPROACH SLAB CY 1,750.0000 14,000.00 8.000 14,000 (TYPE R) 015 CLEAN EXPANSION JOINT LF 12.0000 12,780.00 1,087.500 13,050 016 JOINT SEAL (MR 1/2") LF 30.0000 19,080.00 625.000 18,750 017 JOINT SEAL (MR 1") LF 38.0000 3,496.00 93.500 3,553 018 JOINT SEAL (MR 2") LF 76.0000 25,612.00 369.000 28,044 019 PUBLIC SAFETY PLAN LS 3,500.0000 3,500.00 1.000 3,500 020 RAPID SETTING CONCRETE (PATCH) CF 75.0000 60,225.00 607.460 45,559 021 REMOVE UNSOUND CONCRETE CF 45.0000 36,135.00 607.460 27,335 022 PREPARE CONCRETE BRIDGE DECK SURFACE SQFT 0.1200 151,441.44 1,031,250.000 123,750 PROGRAM CAS145 PAGE 2 DATE 10/16/26 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-4W7804 TIME 09:03 AM ESTIMATE NO. 012 BID OPENING 04/15/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/23/26 R.E. NAME: GALLARDO, SAMUEL DATE OF THIS ESTIMATE 10/16/26 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 TREAT BRIDGE DECK SQFT 0.2000 252,402.40 1,062,340.000 212,468 (F) 024 FURNISH BRIDGE DECK TREATMENT MATERIAL GAL 42.0000 663,054.00 14,986.500 629,433 025 BRIDGE REMOVAL (PORTION) LS 3,500.0000 3,500.00 0.000 0 026 REMOVE PAVEMENT MARKER EA 1.0000 5,040.00 9,168.000 9,168 027 PAVEMENT MARKER (RETROREFLECTIVE) EA 3.0000 8,760.00 2,920.000 8,760 028 CHAIN LINK RAILING (TYPE 7 MODIFIED) LF 270.0000 16,200.00 0.000 0 (F) 029 THERMOPLASTIC PAVEMENT MARKING SQFT 3.0000 8,610.00 2,870.000 8,610 030 PAINT TRAFFIC STRIPE (2-COAT) LF 0.3000 19,560.00 65,200.000 19,560 031 REMOVE PAINTED TRAFFIC STRIPE LF 0.3000 19,560.00 65,200.000 19,560 032 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 0.3000 15,600.00 62,442.000 18,732 033 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 2.0000 5,540.00 2,770.000 5,540 034 6" TRAFFIC STRIPE TAPE LF 2.5000 163,750.00 65,200.000 163,000 035 6" TRAFFIC STRIPE TAPE (BROKEN 17-7) LF 1.5000 7,170.00 4,780.000 7,170 036 6" TRAFFIC STRIPE TAPE (BROKEN 36-12) LF 1.5000 47,925.00 31,950.000 47,925 037 6" TRAFFIC STRIPE TAPE (BROKEN 8-4) LF 1.5000 1,620.00 1,080.000 1,620 038 8" TRAFFIC STRIPE TAPE LF 4.0000 35,080.00 8,770.000 35,080 039 8" TRAFFIC STRIPE TAPE (BROKEN 12-3) LF 3.0000 3,390.00 1,130.000 3,390 040 8" TRAFFIC STRIPE TAPE (BROKEN 36-12) LF 3.0000 750.00 250.000 750 PROGRAM CAS145 PAGE 3 DATE 10/16/26 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-4W7804 TIME 09:03 AM ESTIMATE NO. 012 BID OPENING 04/15/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/23/26 R.E. NAME: GALLARDO, SAMUEL DATE OF THIS ESTIMATE 10/16/26 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 23,625.00 1,853,031.80 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 196,060.29 579,946.91 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 219,685.29 2,432,978.71 041 MOBILIZATION LS 150,000.0000 150,000.00 1.000 150,000 ORIGINAL CONTRACT AMOUNT 2,144,980.84 TOTAL WORK COMPLETED 219,685.29 2,582,978.71 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 219,685.29 2,582,978.71 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN JOB COM- WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR PLETED ON DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 05/20/21 120 06/06/22 07/01/21 09/23/26 120 999 0 178 100% 100% GALLARDO, SAMUEL RESIDENT ENGINEER