PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 03/25/13 EST. NO.02 TIME 02:05 PM R.E. NAME: RAM, MAHINDA 07-4Y1504 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 03/25/13 EST. NO.02 TIME 02:05 PM R.E. NAME: RAM, MAHINDA 07-4Y1504 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 03/25/13 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-4Y1504 TIME 02:05 PM ESTIMATE NO. 02 BID OPENING 06/28/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/13 R.E. NAME: RAM, MAHINDA DATE OF THIS ESTIMATE 03/25/13 LOCATION PROGRESS ESTIMATE 07-LA-1-0.0/28.6 ----------------- PETERSON-CHASE GENERAL IN LOS ANGELES COUNTY,AT VARIOUS ENGINEERING CONSTRUCTION INC LOCATION IN LA-1, LA-90, LA-405 1792 KAISER AVENUE IRVINE CA 92614 FED. AID NO. ACBR-STPX(156)E ,037- (156)E BRIDGE PRESERVATION ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 CONSTRUCTION SITE MANAGEMENT LS 1,250.0000 1,250.00 0.100 125.00 0.200 250 002 PREPARE WATER POLLUTION CONTROL LS 1,000.0000 1,000.00 0.750 750 PROGRAM 003 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 2,320.0000 2,320.00 0.100 232 004 CONSTRUCTION AREA SIGNS LS 11,170.0000 11,170.00 0.750 8,377 005 TRAFFIC CONTROL SYSTEM LS 217,500.0000 217,500.00 0.100 21,750.00 0.200 43,500 006 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 1.1000 18,590.00 0.000 0 STRIPE (HAZARDOUS WASTE) 007 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 0.7000 19,530.00 0.000 0 008 REMOVE PAVEMENT MARKER EA 1.1000 2,717.00 0.000 0 009 REMOVE UNSOUND CONCRETE CF 15.0000 30,705.00 67.890 1,018.35 102.390 1,535 010 PREPARE CONCRETE BRIDGE DECK SURFACE SQFT 0.1300 102,159.07 0.000 0 011 CLEAN BRIDGE DECK DRAIN LF 46.3000 4,861.50 0.000 0 012 LEAD COMPLIANCE PLAN LS 14,375.0000 14,375.00 0.750 10,781 013 AGGREGATE BASE (APPROACH SLAB) CY 434.0000 11,718.00 0.000 0 014 STRUCTURAL CONCRETE, APPROACH SLAB CY 1,211.0000 306,383.00 0.000 0 (TYPE R) 015 PAVING NOTCH EXTENSION CF 152.0000 28,728.00 0.000 0 016 CLEAN EXPANSION JOINT LF 11.1000 67,377.00 1,113.920 12,364.51 5,100.830 56,619 017 RAPID SETTING CONCRETE PATCH CF 20.0000 40,940.00 67.890 1,357.80 102.390 2,047 018 REPAIR SPALLED SURFACE AREA SQFT 287.0000 17,507.00 94.500 27,121.50 94.500 27,121 019 JOINT SEAL (MR 1/2") LF 15.3000 84,654.90 1,113.920 17,042.98 5,045.080 77,189 020 JOINT SEAL (MR 1 1/2") LF 41.9000 37,458.60 55.750 2,335 021 TREAT BRIDGE DECK SQFT 0.2600 204,318.14 0.000 0 (F) 022 FURNISH BRIDGE DECK TREATMENT MATERIAL GAL 40.0000 392,160.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 03/25/13 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-4Y1504 TIME 02:05 PM ESTIMATE NO. 02 BID OPENING 06/28/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/13 R.E. NAME: RAM, MAHINDA DATE OF THIS ESTIMATE 03/25/13 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 PUBLIC SAFETY PLAN LS 575.0000 575.00 0.750 431 024 CLEAN STRUCTURAL STEEL (EXISTING BRIDGE) LS 184,029.0000 184,029.00 0.000 0 025 PAINT STRUCTURAL STEEL (EXISTING BRIDGE) LS 504,682.0000 504,682.00 0.000 0 026 SPOT BLAST CLEAN AND PAINT UNDERCOAT SQFT 39.4000 98,500.00 0.000 0 027 WORK AREA MONITORING LS 1,150.0000 1,150.00 0.000 0 028 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.7000 22,400.00 0.000 0 029 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.4000 4,600.00 0.000 0 (BROKEN 36-12) 030 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.4000 492.00 0.000 0 (BROKEN 17-7) 031 PAVEMENT MARKER (NON-REFLECTIVE) EA 2.8000 2,688.00 0.000 0 032 PAVEMENT MARKER (RETROREFLECTIVE) EA 4.4000 6,644.00 0.000 0 033 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 781.0000 781.00 0.100 78.10 0.200 156 SYSTEM ELEMENTS DURING CONSTRUCTION PROGRAM CAS145 PAGE 3 DATE 03/25/13 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-4Y1504 TIME 02:05 PM ESTIMATE NO. 02 BID OPENING 06/28/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/13 R.E. NAME: RAM, MAHINDA DATE OF THIS ESTIMATE 03/25/13 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 80,858.24 231,328.21 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 80,858.24 231,328.21 034 MOBILIZATION LS 198,800.0000 198,800.00 0.500 99,400 ORIGINAL CONTRACT AMOUNT 2,642,763.21 TOTAL WORK COMPLETED 80,858.24 330,728.21 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 80,858.24 330,728.21 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 08/16/12 285 08/31/12 08/31/12 02/28/14 81 55 0 0 12% 28% PROGRESS IS SATISFACTORY RAM, MAHINDA RESIDENT ENGINEER PROGRAM CAS145 DATE 03/25/13