PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 03/15/11 EST. NO.06 TIME 01:44 PM R.E. NAME: AZIMA, HASSAN 07-4Y3804 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0002 -1,200.00 A.C. @ L.S.(-) 031511 N 02 0 002 0001 1,343.01 E.W. @ F.A.(+) 010611 N 001 0 003 0002 19,712.88 A.C. @ L.S.(+) 021711 N 02 0 19,855.89 TOTAL THIS ESTIMATE 25,285.53 TOTAL PREVIOUS ESTIMATE 45,141.42 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 03/15/11 EST. NO.06 TIME 01:44 PM R.E. NAME: AZIMA, HASSAN 07-4Y3804 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 03/15/11 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-4Y3804 TIME 01:44 PM ESTIMATE NO. 06 BID OPENING 04/29/10 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 01/27/11 R.E. NAME: AZIMA, HASSAN DATE OF THIS ESTIMATE 03/15/11 LOCATION PROGRESS ESTIMATE AFTER ACCEPTANCE 07-LA-60-0.1/0.1 ---------------------------------- POWELL CONSTRUCTORS, INC. IN LOS ANGELES COUNTY IN LOS 8555 BANANA AVE ANGELES AT 0.1 MILE WEST OF FONTANA, CA 92335 ROUTE 60/10 SEPARATION FED. AID NO. N O N E REPLACE OVERHEAD SIGN STRUCTURE ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 SMALL BUSINESS UTILIZATION REPORT EA 250.0000 750.00 1.000 250.00 02 CONSTRUCTION SITE MANAGEMENT LS 1,500.0000 1,500.00 0.250 375.00 1.000 1,500.00 03 PREPARE WATER POLLUTION CONTROL LS 200.0000 200.00 1.000 200.00 PROGRAM 04 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 1,000.0000 1,000.00 1.000 1,000.00 05 CONSTRUCTION AREA SIGNS LS 1,000.0000 1,000.00 0.250 250.00 1.000 1,000.00 06 TRAFFIC CONTROL SYSTEM LS 9,000.0000 9,000.00 1.000 9,000.00 07 CHANNELIZER (SURFACE MOUNTED) EA 20.0000 140.00 7.000 140.00 08 TEMPORARY RAILING (TYPE K) LF 25.0000 5,000.00 160.000 4,000.00 09 TEMPORARY CRASH CUSHION MODULE EA 300.0000 4,200.00 2.000 600.00 14.000 4,200.00 10 REMOVE METAL BEAM GUARD RAILING LF 12.0000 1,440.00 120.000 1,440.00 11 REMOVE SIGN STRUCTURE EA 10,000.0000 10,000.00 1.000 10,000.00 12 LEAD COMPLIANCE PLAN LS 2,500.0000 2,500.00 1.000 2,500.00 13 STRUCTURE EXCAVATION (TYPE Z-2) CY 500.0000 2,000.00 4.000 2,000.00 (AERIALLY DEPOSITED LEAD) 14 FURNISH SIGN STRUCTURE (TRUSS) LB 3.0000 92,430.00 30,810.000 92,430.00 F) 15 INSTALL SIGN STRUCTURE (TRUSS) LB 0.3000 9,243.00 30,810.000 9,243.00 F) 16 FURNISH FORMED PANEL SIGN (OVERHEAD) SQFT 15.0000 5,700.00 380.000 5,700.00 17 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 10.0000 220.00 22.000 220.00 (0.063"-UNFRAMED) 18 60" CAST-IN-DRILLED-HOLE CONCRETE PILE LF 675.0000 54,000.00 80.000 54,000.00 (SIGN FOUNDATION) 19 ROADSIDE SIGN - ONE POST EA 200.0000 200.00 1.000 200.00 20 METAL BEAM GUARD RAILING (WOOD POST) LF 35.0000 3,500.00 0.000 0.00 21 ALTERNATIVE IN-LINE TERMINAL SYSTEM EA 3,000.0000 3,000.00 1.000 3,000.00 1.000 3,000.00 22 MODIFY SIGN ILLUMINATION LS 9,000.0000 9,000.00 1.000 9,000.00 PROGRAM CAS145 PAGE 2 DATE 03/15/11 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-4Y3804 TIME 01:44 PM ESTIMATE NO. 06 BID OPENING 04/29/10 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 01/27/11 R.E. NAME: AZIMA, HASSAN DATE OF THIS ESTIMATE 03/15/11 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 4,225.00 211,023.00 ADJUSTMENT OF COMPENSATION 18,512.88 43,798.41 EXTRA WORK 1,343.01 1,343.01 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 24,080.89 256,164.42 23 MOBILIZATION LS 19,000.0000 19,000.00 1.000 19,000.00 ORIGINAL CONTRACT AMOUNT 235,023.00 TOTAL WORK COMPLETED 24,080.89 275,164.42 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 24,080.89 275,164.42 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN JOB COM- WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR PLETED ON DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 06/22/10 100 11/29/10 07/07/10 01/27/11 109 32 9 0 100% 100% AZIMA, HASSAN RESIDENT ENGINEER PROGRAM CAS145 DATE 03/15/11