PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 08/25/06 EST. NO.01 TIME 10:38 AM R.E. NAME: ABUGHARBIEH, IMAD 08-0A4234 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 08/25/06 EST. NO.01 TIME 10:38 AM R.E. NAME: ABUGHARBIEH, IMAD 08-0A4234 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 08/25/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-0A4234 TIME 10:38 AM ESTIMATE NO. 01 BID OPENING 06/29/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/06 R.E. NAME: ABUGHARBIEH, IMAD DATE OF THIS ESTIMATE 08/25/06 LOCATION RERUN PROGRESS ESTIMATE 08-SBD-15-12.7/R15.0 ----------------------- 08-SBD-215-17.3/17.8 COFFMAN SPECIALTIES INC IN SAN BERNARDINO COUNTY IN AND 4375 JUTLAND DRIVE, SUITE 260 NEAR RIALTO AND FONTANA AT VARIOUS SAN DIEGO, CA 92117 LOCATIONS FED. AID NO. N O N E PAVEMENT REHABILITATION ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 12,500.0000 12,500.00 0.000 0.00 02 TIME-RELATED OVERHEAD LS 400,000.0000 400,000.00 0.060 24,000.00 0.060 24,000.00 03 TEMPORARY FENCE (TYPE ESA) M 15.0000 3,000.00 0.000 0.00 04 PREPARE STORM WATER POLLUTION LS 6,750.0000 6,750.00 0.750 5,062.50 0.750 5,062.50 PREVENTION PLAN 05 WATER POLLUTION CONTROL LS 50,000.0000 50,000.00 0.060 3,000.00 0.060 3,000.00 06 TEMPORARY SILT FENCE M 3.0000 30,300.00 755.000 2,265.00 755.000 2,265.00 07 TEMPORARY GRAVEL BAG BERM M 10.0000 28,000.00 0.000 0.00 08 TEMPORARY CONCRETE WASHOUT FACILITY EA 3,500.0000 7,000.00 0.000 0.00 09 INSTALL TEMPORARY SIGN OVERLAY EA 1,000.0000 4,000.00 0.000 0.00 10 TEMPORARY DRAINAGE INLET PROTECTION EA 200.0000 11,000.00 1.000 200.00 1.000 200.00 11 CONSTRUCTION AREA SIGNS LS 50,000.0000 50,000.00 0.294 14,700.00 0.294 14,700.00 S) 12 TRAFFIC CONTROL SYSTEM LS 200,000.0000 200,000.00 0.060 12,000.00 0.060 12,000.00 S) 13 FLASHING ARROW SIGN EA 5,000.0000 20,000.00 4.000 20,000.00 4.000 20,000.00 S) 14 TYPE III BARRICADE EA 75.0000 1,725.00 0.000 0.00 S) 15 TEMPORARY PAVEMENT MARKING (PAINT) M2 15.0000 705.00 0.000 0.00 S) 16 TEMPORARY TRAFFIC STRIPE (PAINT) M 1.0000 22,700.00 1,092.000 1,092.00 1,092.000 1,092.00 S) 17 CHANNELIZER (SURFACE MOUNTED) EA 40.0000 2,920.00 0.000 0.00 S) 18 TEMPORARY PAVEMENT MARKER EA 2.0000 2,900.00 65.000 130.00 65.000 130.00 S) 19 QUICKCHANGE MOVEABLE BARRIER LS 1000,000.0000 1,000,000.00 0.000 0.00 S) SYSTEM 20 PORTABLE CHANGEABLE MESSAGE SIGN EA 7,500.0000 75,000.00 0.600 4,500.00 0.600 4,500.00 S) 21 TEMPORARY RAILING (TYPE K) M 70.0000 613,200.00 2,058.000 144,060.00 2,058.000 144,060.00 22 TEMPORARY CRASH CUSHION MODULE EA 200.0000 12,800.00 1.000 200.00 1.000 200.00 S) PROGRAM CAS145 PAGE 2 DATE 08/25/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-0A4234 TIME 10:38 AM ESTIMATE NO. 01 BID OPENING 06/29/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/06 R.E. NAME: ABUGHARBIEH, IMAD DATE OF THIS ESTIMATE 08/25/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 REMOVE CHIP SEAL M2 10.0000 10,200.00 0.000 0.00 24 REMOVE YELLOW THERMOPLASTIC TRAFFIC M 1.5000 11,565.00 0.000 0.00 S) STRIPE 25 REMOVE THERMOPLASTIC TRAFFIC STRIPE M 1.5000 27,150.00 744.000 1,116.00 744.000 1,116.00 S) 26 REMOVE THERMOPLASTIC PAVEMENT MARKING M2 25.0000 8,250.00 0.000 0.00 S) 27 REMOVE PAVEMENT MARKER EA 2.0000 3,220.00 73.000 146.00 73.000 146.00 S) 28 REMOVE ASPHALT CONCRETE DIKE M 8.0000 18,800.00 0.000 0.00 29 SALVAGE METAL BRIDGE RAILING M 60.0000 3,360.00 0.000 0.00 S) 30 SALVAGE METAL BEAM GUARD RAILING M 50.0000 6,500.00 0.000 0.00 S) (WOOD POST) 31 RECONSTRUCT SINGLE THRIE BEAM BARRIER M 100.0000 31,000.00 289.500 28,950.00 289.500 28,950.00 S) (WOOD POST) 32 RECONSTRUCT METAL BEAM GUARD RAILING M 90.0000 10,800.00 91.000 8,190.00 91.000 8,190.00 S) (WOOD POST) 33 RESET CONCRETE BARRIER (TYPE K) M 25.0000 154,750.00 0.000 0.00 34 RELOCATE ROADSIDE SIGN-ONE POST EA 500.0000 1,000.00 0.000 0.00 35 COLD PLANE ASPHALT CONCRETE PAVEMENT M2 4.5000 288,450.00 0.000 0.00 S) 36 REPAIR PAVEMENT RECESSES M2 15.0000 225.00 0.000 0.00 (POLYESTER CONCRETE) 37 CLEAN BRIDGE DECK M2 6.0000 238,500.00 0.000 0.00 38 BRIDGE REMOVAL (PORTION), LOCATION A LS 15,000.0000 15,000.00 0.000 0.00 39 BRIDGE REMOVAL (PORTION), LOCATION B LS 15,000.0000 15,000.00 0.000 0.00 40 BRIDGE REMOVAL (PORTION), LOCATION C LS 5,000.0000 5,000.00 0.000 0.00 41 ROADWAY EXCAVATION M3 100.0000 2,070,000.00 0.000 0.00 42 ROADWAY EXCAVATION (TYPE Y-1) M3 100.0000 43,000.00 111.080 11,108.00 111.080 11,108.00 (AERIALLY DEPOSITED LEAD) 43 LEAD COMPLIANCE PLAN LS 5,000.0000 5,000.00 1.000 5,000.00 1.000 5,000.00 44 SHOULDER BACKING M3 70.0000 7,000.00 0.000 0.00 45 STRUCTURE EXCAVATION (BRIDGE) M3 200.0000 13,000.00 0.000 0.00 F) 46 STRUCTURE BACKFILL (BRIDGE) M3 220.0000 12,980.00 0.000 0.00 F) 47 DITCH EXCAVATION M3 100.0000 67,000.00 0.000 0.00 48 FIBER (EROSION CONTROL) KG 0.8000 12,960.00 0.000 0.00 S) 49 PURE LIVE SEED (EROSION CONTROL) KG 185.0000 48,100.00 0.000 0.00 S) PROGRAM CAS145 PAGE 3 DATE 08/25/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-0A4234 TIME 10:38 AM ESTIMATE NO. 01 BID OPENING 06/29/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/06 R.E. NAME: ABUGHARBIEH, IMAD DATE OF THIS ESTIMATE 08/25/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 50 STABILIZING EMULSION (EROSION CONTROL) KG 5.0000 6,400.00 0.000 0.00 S) 51 CLASS 2 AGGREGATE BASE M3 80.0000 864,000.00 0.000 0.00 52 AGGREGATE BASE (APPROACH SLAB) M3 200.0000 38,600.00 0.000 0.00 53 ASPHALT CONCRETE (TYPE A) TONN 100.0000 3,150,000.00 0.000 0.00 54 ASPHALT CONCRETE BASE (TYPE C) TONN 140.0000 995,400.00 0.000 0.00 55 PLACE ASPHALT CONCRETE (MISCELLANEOUS M2 9.0000 45,900.00 0.000 0.00 AREA) 56 PLACE ASPHALT CONCRETE DIKE (TYPE E) M 5.5000 12,925.00 0.000 0.00 57 SHOULDER RUMBLE STRIP M 2.0000 22,200.00 0.000 0.00 (AC, GROUND-IN INDENTATIONS) 58 ASPHALTIC EMULSION (PAINT BINDER) TONN 1,100.0000 62,700.00 0.000 0.00 59 SHOULDER RUMBLE STRIP M 4.5000 66,150.00 0.000 0.00 (PCC, GROUND-IN INDENTATIONS) 60 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0.00 61 REPLACE CONCRETE PAVEMENT M3 700.0000 5,348,000.00 0.000 0.00 (RAPID STRENGTH CONCRETE) 62 SEAL PAVEMENT JOINT (SILICONE) M 3.0000 18,390.00 0.000 0.00 63 SEAL LONGITUDINAL ISOLATION JOINT M 5.0000 15,300.00 0.000 0.00 64 GRIND EXISTING CONCRETE M2 7.0000 440,300.00 0.000 0.00 PAVEMENT 65 400 MM CAST-IN-DRILLED-HOLE CONCRETE M 1,200.0000 28,800.00 0.000 0.00 S) PILING 66 1.8 M CAST-IN-DRILLED-HOLE CONCRETE M 5,000.0000 130,000.00 0.000 0.00 S) PILING 67 STRUCTURAL CONCRETE, BRIDGE FOOTING M3 2,000.0000 6,000.00 0.000 0.00 F) 68 STRUCTURAL CONCRETE, BRIDGE M3 1,800.0000 275,400.00 0.000 0.00 F) 69 STRUCTURAL CONCRETE, APPROACH SLAB M3 1,000.0000 31,000.00 0.000 0.00 F) (TYPE N) 70 STRUCTURAL CONCRETE, APPROACH SLAB M3 1,200.0000 1,963,200.00 0.000 0.00 F) (TYPE R) 71 STRUCTURAL CONCRETE, APPROACH SLAB M3 1,100.0000 275,000.00 0.000 0.00 F) (TYPE R MODIFIED) 72 PAVING NOTCH EXTENSION M3 1,500.0000 51,000.00 0.000 0.00 73 DRILL AND BOND DOWEL M 150.0000 1,050.00 0.000 0.00 74 JOINT SEAL (MR 30 MM) M 120.0000 44,160.00 0.000 0.00 S) 75 JOINT SEAL ASSEMBLY (MR 70 MM) M 1,500.0000 31,500.00 0.000 0.00 S) 76 JOINT SEAL (MR 40 MM) M 120.0000 46,320.00 0.000 0.00 S) PROGRAM CAS145 PAGE 4 DATE 08/25/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-0A4234 TIME 10:38 AM ESTIMATE NO. 01 BID OPENING 06/29/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/06 R.E. NAME: ABUGHARBIEH, IMAD DATE OF THIS ESTIMATE 08/25/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 77 JOINT SEAL (MR 50 MM) M 200.0000 34,800.00 0.000 0.00 S) 78 BAR REINFORCING STEEL (BRIDGE) KG 3.0000 101,601.00 0.000 0.00 SF) 79 TREAT BRIDGE DECK M2 7.0000 278,250.00 0.000 0.00 F) 80 FURNISH BRIDGE DECK TREATMENT MATERIAL L 20.0000 324,200.00 0.000 0.00 (LOW ODOR) 81 COLUMN CASING KG 15.0000 150,300.00 0.000 0.00 SF) 82 ROADSIDE SIGN - TWO POST EA 2,100.0000 6,300.00 0.000 0.00 83 SLOPE PAVING (CONCRETE) M3 400.0000 10,800.00 0.000 0.00 F) 84 MINOR CONCRETE (GUTTER) M3 300.0000 63,000.00 0.000 0.00 85 TRANSITION RAILING (TYPE WB) EA 3,650.0000 51,100.00 0.000 0.00 S) 86 ALTERNATIVE FLARED TERMINAL SYSTEM EA 2,700.0000 2,700.00 0.000 0.00 S) 87 CONCRETE BARRIER (TYPE 732) M 300.0000 16,800.00 0.000 0.00 F) 88 CONCRETE BARRIER (TYPE 736) M 350.0000 431,200.00 0.000 0.00 F) 89 BARRIER MODIFICATION WORK, LOCATION A LS 3,000.0000 3,000.00 0.000 0.00 90 BARRIER MODIFICATION WORK, LOCATION B LS 3,000.0000 3,000.00 0.000 0.00 91 BARRIER MODIFICATION WORK, LOCATION C LS 3,000.0000 3,000.00 0.000 0.00 92 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0.00 93 BARRIER MODIFICATION WORK, LOCATION E LS 5,000.0000 5,000.00 0.000 0.00 94 BARRIER MODIFICATION WORK, LOCATION F LS 3,500.0000 3,500.00 0.000 0.00 95 BARRIER MODIFICATION WORK, LOCATION G LS 3,000.0000 3,000.00 0.000 0.00 96 THERMOPLASTIC PAVEMENT MARKING M2 45.0000 14,400.00 0.000 0.00 S) 97 THERMOPLASTIC TRAFFIC STRIPE M 1.0000 66,500.00 0.000 0.00 S) (SPRAYABLE) 98 PAVEMENT MARKER EA 15.0000 72,150.00 0.000 0.00 S) (RETROREFLECTIVE-RECESSED) 99 MODIFY RAMP METERING SYSTEM LS 5,000.0000 5,000.00 0.000 0.00 S) 00 MODIFY CLOSED CIRCUIT TELEVISION SYSTEM LS 25,000.0000 25,000.00 0.000 0.00 S) 01 MODIFY LIGHTING AND SIGN ILLUMINATION LS 250,000.0000 250,000.00 0.000 0.00 S) PROGRAM CAS145 PAGE 5 DATE 08/25/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-0A4234 TIME 10:38 AM ESTIMATE NO. 01 BID OPENING 06/29/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/06 R.E. NAME: ABUGHARBIEH, IMAD DATE OF THIS ESTIMATE 08/25/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 285,719.50 285,719.50 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 285,719.50 285,719.50 02 MOBILIZATION LS 2045,000.0000 2,045,000.00 0.000 0.00 ORIGINAL CONTRACT AMOUNT 23,621,606.00 TOTAL WORK COMPLETED 285,719.50 285,719.50 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 285,719.50 285,719.50 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 07/27/06 100 00/00/00 00/00/00 01/05/07 6 0 0 0 1% 6% PROGRESS IS SATISFACTORY ABUGHARBIEH, IMAD RESIDENT ENGINEER PROGRAM CAS145 DATE 08/25/06