PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 02/26/07 EST. NO.08 TIME 04:02 PM R.E. NAME: ABDELKHALEQ, HUSSAM/SAOUD, NAHRO 08-0C1804 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0011 932.29 E.W. @ F.A.(+) 011907 N 013 0 932.29 TOTAL THIS ESTIMATE 221,970.94 TOTAL PREVIOUS ESTIMATE 222,903.23 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 02/26/07 EST. NO.08 TIME 04:02 PM R.E. NAME: ABDELKHALEQ, HUSSAM/SAOUD, NAHRO 08-0C1804 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE PCC FAILED GRADATION -1,053.40 08 -1,053.40 -1,053.40 TOTAL DEDUCTIONS -1,053.40 -1,053.40 PROGRAM CAS145 PAGE 1 DATE 02/26/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-0C1804 TIME 04:02 PM ESTIMATE NO. 08 BID OPENING 05/04/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/07 R.E. NAME: ABDELKHALEQ, HUSSAM/SAOUD, NAHRO DATE OF THIS ESTIMATE 02/26/07 LOCATION PROGRESS ESTIMATE 08-SBD-215-2.7/5.0 ----------------- BEADOR CONSTRUCTION COMPANY IN SAN BERNARDINO COUNTY IN COLTON INC AND SAN BERNARDINO FROM WASHINGTON 26320 LESTER CIRCLE AVENUE OVERCROSSING TO 0.4 KM SOUTH CORONA CA 92883 OF ORANGE SHOW ROAD OVERCROSSING FED. AID NO. N O N E UPGRADE MEDIAN BARRIER ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 PREPARE STORM WATER POLLUTION LS 4,500.0000 4,500.00 1.000 4,500.00 PREVENTION PLAN 02 WATER POLLUTION CONTROL LS 12,500.0000 12,500.00 0.400 5,000.00 03 TEMPORARY CONCRETE WASHOUT FACILITY EA 1,850.0000 5,550.00 2.000 3,700.00 04 TEMPORARY CONSTRUCTION ENTRANCE EA 5,500.0000 22,000.00 2.000 11,000.00 05 TEMPORARY CHECK DAM M 33.0000 3,300.00 0.000 0.00 06 TEMPORARY DRAINAGE INLET PROTECTION EA 700.0000 3,500.00 6.000 4,200.00 07 CONSTRUCTION AREA SIGNS LS 14,000.0000 14,000.00 0.050 700.00 0.850 11,900.00 S) 08 TRAFFIC CONTROL SYSTEM LS 130,000.0000 130,000.00 0.050 6,500.00 0.750 97,500.00 S) 09 TEMPORARY TRAFFIC STRIPE (PAINT) M 3.5000 62,650.00 10,077.000 35,269.50 S) 10 TEMPORARY RAILING (TYPE K) M 58.0000 323,060.00 5,768.000 334,544.00 11 TEMPORARY CRASH CUSHION MODULE EA 265.0000 11,130.00 28.000 7,420.00 12 TEMPORARY TRAFFIC SCREEN M 10.0000 55,700.00 5,170.000 51,700.00 13 ABANDON CULVERT M 79.0000 2,212.00 28.000 2,212.00 14 REMOVE MARKER EA 125.0000 2,250.00 18.000 2,250.00 S) 15 REMOVE METAL BEAM GUARD RAILING M 55.0000 1,650.00 30.000 1,650.00 S) 16 REMOVE SINGLE METAL BEAM BARRIER M 25.0000 48,750.00 1,950.000 48,750.00 S) 17 REMOVE DOUBLE METAL BEAM BARRIER M 50.0000 79,000.00 1,580.000 79,000.00 S) 18 REMOVE YELLOW THERMOPLASTIC TRAFFIC M 2.2500 11,025.00 6,290.000 14,152.50 S) STRIPE 19 REMOVE THERMOPLASTIC TRAFFIC STRIPE M 1.9000 24,700.00 3,948.000 7,501.20 S) 20 REMOVE PAVEMENT MARKER EA 1.2500 5,612.50 5,387.000 6,733.75 S) 21 REMOVE ROADSIDE SIGN EA 220.5000 661.50 3.000 661.50 22 REMOVE PIPE M 500.0000 5,500.00 11.000 5,500.00 PROGRAM CAS145 PAGE 2 DATE 02/26/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-0C1804 TIME 04:02 PM ESTIMATE NO. 08 BID OPENING 05/04/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/07 R.E. NAME: ABDELKHALEQ, HUSSAM/SAOUD, NAHRO DATE OF THIS ESTIMATE 02/26/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 REMOVE INLET EA 1,850.0000 5,550.00 3.000 5,550.00 24 SALVAGE CONCRETE BARRIER (TYPE K) M 30.0000 4,500.00 150.000 4,500.00 25 RECONSTRUCT DOUBLE METAL BEAM BARRIER M 165.0000 26,400.00 0.000 0.00 S) 26 REMOVE CONCRETE BARRIER (TYPE 50) M 260.0000 4,940.00 0.000 0.00 27 CAP INLET EA 2,000.0000 10,000.00 5.000 10,000.00 28 CLEARING AND GRUBBING LS 5,000.0000 5,000.00 1.000 5,000.00 29 ROADWAY EXCAVATION M3 32.0000 192,640.00 8,919.510 285,424.32 30 ROADWAY EXCAVATION (TYPE Z-2) M3 106.0000 368,880.00 0.000 0.00 (AERIALLY DEPOSITED LEAD) 31 LEAD COMPLIANCE PLAN LS 4,000.0000 4,000.00 1.000 4,000.00 32 SAND BACKFILL M3 575.0000 4,600.00 8.000 4,600.00 33 FINISHING ROADWAY LS 11,000.0000 11,000.00 0.000 0.00 34 CLASS 2 AGGREGATE SUBBASE M3 61.0000 56,120.00 937.000 57,157.00 35 CLASS 2 AGGREGATE BASE M3 57.0000 236,550.00 3,200.000 182,400.00 36 LEAN CONCRETE BASE M3 195.0000 126,750.00 600.000 117,000.00 600.000 117,000.00 37 ASPHALT CONCRETE (TYPE A) TONN 87.0000 359,310.00 1,683.700 146,481.90 38 ASPHALTIC EMULSION (PAINT BINDER) TONN 920.0000 11,040.00 11.000 10,120.00 39 CONCRETE PAVEMENT M3 335.0000 442,200.00 440.000 147,400.00 440.000 147,400.00 40 SEAL PAVEMENT JOINT M 20.5000 27,675.00 0.000 0.00 41 SEAL LONGITUDINAL ISOLATION JOINT M 22.0000 39,600.00 0.000 0.00 42 MINOR CONCRETE (MINOR STRUCTURE) M3 2,350.0000 33,135.00 14.100 33,135.00 F) 43 METAL (BARRIER MOUNTED SIGN) KG 40.0000 2,200.00 0.000 0.00 F) 44 ROADSIDE SIGN - ONE POST EA 550.0000 1,650.00 3.000 1,650.00 45 PREPARING AND PAINTING CONCRETE BARRIER M2 18.5000 156,325.00 0.000 0.00 S) SURFACES 46 450 MM ALTERNATIVE PIPE CULVERT M 282.0000 121,260.00 430.000 121,260.00 47 GRATED LINE DRAIN M 236.0000 66,080.00 70.000 16,520.00 48 PRE-CAST CONCRETE MANHOLE M 1,310.0000 2,751.00 2.100 2,751.00 49 MISCELLANEOUS IRON AND STEEL KG 3.6500 9,563.00 2,620.000 9,563.00 F) PROGRAM CAS145 PAGE 3 DATE 02/26/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-0C1804 TIME 04:02 PM ESTIMATE NO. 08 BID OPENING 05/04/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/07 R.E. NAME: ABDELKHALEQ, HUSSAM/SAOUD, NAHRO DATE OF THIS ESTIMATE 02/26/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 50 MILEPOST MARKER EA 230.0000 2,760.00 0.000 0.00 51 SINGLE THRIE BEAM BARRIER (WOOD POST) M 160.0000 5,600.00 0.000 0.00 S) 52 DOUBLE THRIE BEAM BARRIER (WOOD POST) M 735.0000 4,410.00 0.000 0.00 S) 53 CONCRETE BARRIER (TYPE 60) M 300.0000 33,000.00 0.000 0.00 54 CONCRETE BARRIER (TYPE 60C) M 220.0000 475,200.00 365.000 80,300.00 1,225.000 269,500.00 55 CONCRETE BARRIER MODIFIED (TYPE 60 R) M 670.0000 154,100.00 0.000 0.00 56 CONCRETE BARRIER MARKER EA 77.0000 13,860.00 0.000 0.00 57 THERMOPLASTIC TRAFFIC STRIPE M 1.1000 19,690.00 0.000 0.00 S) (SPRAYABLE) 58 PAVEMENT MARKER (REFLECTIVE) EA 1.6000 7,184.00 5,216.000 8,345.60 S) 59 MODIFY SIGN ILLUMINATION LS 85,000.0000 85,000.00 0.000 0.00 S) 60 MODIFY TRAFFIC MONITORING STATION LS 32,000.0000 32,000.00 0.260 8,320.00 0.380 12,160.00 S) 61 MODIFY TRAFFIC MONITORING STATION LS 24,000.0000 24,000.00 0.100 2,400.00 0.410 9,840.00 S) (COUNT) 62 MODIFY RAMP METERING SYSTEM LS 22,000.0000 22,000.00 0.090 1,980.00 0.090 1,980.00 S) 63 RAMP METERING SYSTEM LS 23,000.0000 23,000.00 0.060 1,380.00 0.430 9,890.00 S) 64 MODIFY LIGHTING LS 48,000.0000 48,000.00 0.220 10,560.00 S) PROGRAM CAS145 PAGE 4 DATE 02/26/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-0C1804 TIME 04:02 PM ESTIMATE NO. 08 BID OPENING 05/04/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/07 R.E. NAME: ABDELKHALEQ, HUSSAM/SAOUD, NAHRO DATE OF THIS ESTIMATE 02/26/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 365,980.00 2,221,932.27 ADJUSTMENT OF COMPENSATION 0.00 166,063.25 EXTRA WORK 932.29 56,839.98 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 366,912.29 2,444,835.50 65 MOBILIZATION LS 260,526.0000 260,526.00 0.050 13,026.30 1.000 260,526.00 ORIGINAL CONTRACT AMOUNT 4,369,300.00 TOTAL WORK COMPLETED 379,938.59 2,705,361.50 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS -1,053.40 -1,053.40 TOTAL 378,885.19 2,704,308.10 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 06/06/06 150 06/21/06 06/21/06 04/23/07 151 11 45 3 61% 76% PROGRESS UNSATISFACTORY ABDELKHALEQ, HUSSAM/SAOUD, NAHRO RESIDENT ENGINEER PROGRAM CAS145 PAGE 4 DATE 02/26/07