PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 02/03/12 EST. NO.05 TIME 12:05 PM R.E. NAME: QURESHI, MUJAHID 08-0C4514 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 002 0001 21,231.53 E.W. @ L.S.(+) 010412 N 1 0 21,231.53 TOTAL THIS ESTIMATE 2,000.00 TOTAL PREVIOUS ESTIMATE 23,231.53 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 02/03/12 EST. NO.05 TIME 12:05 PM R.E. NAME: QURESHI, MUJAHID 08-0C4514 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 02/03/12 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-0C4514 TIME 12:05 PM ESTIMATE NO. 05 BID OPENING 03/24/11 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 01/10/12 R.E. NAME: QURESHI, MUJAHID DATE OF THIS ESTIMATE 02/03/12 LOCATION PROGRESS ESTIMATE AFTER ACCEPTANCE 08-RIV-79-32.4/33.8 ---------------------------------- AUTOBAHN CONSTRUCTION INC IN RIVERSIDE COUNTY IN SAN JACINTO P O BOX 11238 ON ROUTE 79 FROM RAMONA SANTA ANA CA 927111238 EXPRESSWAY TO GILMAN SPRINGS ROAD FED. AID NO. N O N E DRAINAGE IMPROVEMENT ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 001 CONSTRUCTION SITE MANAGEMENT LS 250.0000 250.00 1.000 250.00 002 PREPARE WATER POLLUTION CONTROL LS 775.0000 775.00 1.000 775.00 PROGRAM 003 TEMPORARY EROSION CONTROL BLANKET SQYD 2.0000 2,000.00 1,000.000 2,000.00 004 TEMPORARY FIBER ROLL LF 5.0000 6,000.00 1,200.000 6,000.00 005 TEMPORARY COVER SQYD 10.0000 2,000.00 200.000 2,000.00 006 TEMPORARY DRAINAGE INLET PROTECTION EA 350.0000 7,000.00 20.000 7,000.00 007 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 1,500.0000 1,500.00 1.000 1,500.00 008 CONSTRUCTION AREA SIGNS LS 5,000.0000 5,000.00 0.200 1,000.00 1.000 5,000.00 009 TRAFFIC CONTROL SYSTEM LS 92,000.0000 92,000.00 1.000 92,000.00 010 PORTABLE CHANGEABLE MESSAGE SIGN LS 9,000.0000 9,000.00 1.000 9,000.00 011 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 0.1500 4,260.00 33,396.000 5,009.40 STRIPE (HAZARDOUS WASTE) 012 REMOVE METAL BEAM GUARD RAILING LF 5.8000 11,890.00 2,037.500 11,817.50 013 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 0.1500 3,165.00 25,724.000 3,858.60 014 REMOVE PAVEMENT MARKER EA 0.4500 432.00 1,024.000 460.80 015 REMOVE ASPHALT CONCRETE DIKE LF 2.5000 12,875.00 5,150.000 12,875.00 016 REMOVE DOWNDRAIN LF 16.0000 13,280.00 830.000 13,280.00 017 RESET OBJECT MARKER EA 100.0000 400.00 4.000 400.00 018 ROADWAY EXCAVATION CY 100.0000 500.00 6.250 625.00 019 LEAD COMPLIANCE PLAN LS 600.0000 600.00 1.000 600.00 020 IMPORTED BORROW CY 100.0000 1,000.00 12.500 1,250.00 021 MINOR HOT MIX ASPHALT TON 150.0000 36,000.00 274.070 41,110.50 022 PLACE HOT MIX ASPHALT DIKE (TYPE C) LF 0.8600 215.00 250.000 215.00 PROGRAM CAS145 PAGE 2 DATE 02/03/12 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-0C4514 TIME 12:05 PM ESTIMATE NO. 05 BID OPENING 03/24/11 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 01/10/12 R.E. NAME: QURESHI, MUJAHID DATE OF THIS ESTIMATE 02/03/12 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 023 PLACE HOT MIX ASPHALT DIKE (TYPE D) LF 0.8600 3,078.80 3,580.000 3,078.80 024 PLACE HOT MIX ASPHALT DIKE (TYPE F) LF 0.8600 1,135.20 1,320.000 1,135.20 025 PLACE HOT MIX ASPHALT SQYD 24.0000 9,360.00 690.000 16,560.00 (MISCELLANEOUS AREA) 026 MINOR CONCRETE (MINOR STRUCTURE) CY 1,950.0000 5,850.00 3.000 5,850.00 027 DRILL AND BOND DOWEL LF 7.0000 168.00 24.000 168.00 028 12" CORRUGATED STEEL PIPE DOWNDRAIN LF 75.0000 46,500.00 20.000 1,500.00 620.000 46,500.00 (.079" THICK) 029 15" CORRUGATED STEEL PIPE DOWNDRAIN LF 65.0000 14,950.00 230.000 14,950.00 (.079" THICK) 030 12" ENTRANCE TAPER EA 350.0000 4,900.00 14.000 4,900.00 031 15" ENTRANCE TAPER EA 410.0000 2,460.00 6.000 2,460.00 032 12" STEEL FLARED END SECTION EA 55.0000 770.00 14.000 770.00 033 15" STEEL FLARED END SECTION EA 70.0000 420.00 6.000 420.00 034 ROCK SLOPE PROTECTION (LIGHT, METHOD B) CY 365.0000 18,980.00 5.000 1,825.00 52.000 18,980.00 035 ROCK SLOPE PROTECTION FABRIC SQYD 7.0000 1,540.00 20.000 140.00 220.000 1,540.00 036 OBJECT MARKER (TYPE L-1) EA 50.0000 400.00 8.000 400.00 037 METAL BEAM GUARD RAILING (WOOD POST) LF 17.8500 27,489.00 1,600.000 28,560.00 038 VEGETATION CONTROL (MINOR CONCRETE) SQYD 31.0000 27,900.00 900.000 27,900.00 039 TRANSITION RAILING (TYPE WB) EA 3,100.0000 12,400.00 4.000 12,400.00 040 END ANCHOR ASSEMBLY (TYPE SFT) EA 585.0000 2,340.00 4.000 2,340.00 041 ALTERNATIVE FLARED TERMINAL SYSTEM EA 2,150.0000 17,200.00 8.000 17,200.00 042 THERMOPLASTIC TRAFFIC STRIPE LF 0.4000 17,720.00 53,450.000 21,380.00 (SPRAYABLE) 043 PAVEMENT MARKER (RETROREFLECTIVE) EA 3.7500 3,600.00 1,148.000 4,305.00 044 MODIFY LIGHTING LS 15,000.0000 15,000.00 1.000 15,000.00 PROGRAM CAS145 PAGE 3 DATE 02/03/12 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-0C4514 TIME 12:05 PM ESTIMATE NO. 05 BID OPENING 03/24/11 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 01/10/12 R.E. NAME: QURESHI, MUJAHID DATE OF THIS ESTIMATE 02/03/12 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 4,465.00 463,823.80 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 21,231.53 23,231.53 SUBTOTAL AMOUNT EARNED 25,696.53 487,055.33 ORIGINAL CONTRACT AMOUNT 444,303.00 TOTAL WORK COMPLETED 25,696.53 487,055.33 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 25,696.53 487,055.33 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN JOB COM- WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR PLETED ON DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 05/04/11 50 09/08/11 09/01/11 01/10/12 61 25 15 0 100% 100% QURESHI, MUJAHID RESIDENT ENGINEER PROGRAM CAS145 DATE 02/03/12