PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 10/12/13 EST. NO.03 TIME 08:43 AM R.E. NAME: CHEN, MICHAEL 08-0C7434 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0001 241.16 E.W. @ F.A.(+) 020113 N P1 0 0002 1,006.22 020613 N P2 0 0003 265.34 020413 N P3 0 0004 188.49 020613 N P4 0 0005 4,763.71 040413 N P5 0 6,464.92 TOTAL THIS ESTIMATE 0.00 TOTAL PREVIOUS ESTIMATE 6,464.92 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 10/12/13 EST. NO.03 TIME 08:43 AM R.E. NAME: CHEN, MICHAEL 08-0C7434 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE SOLID WASTE REPORT -10,000.00 02 SOLID WASTE REPORT 10,000.00 03 10,000.00 0.00 TOTAL DEDUCTIONS 10,000.00 0.00 PROGRAM CAS145 PAGE 1 DATE 10/12/13 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-0C7434 TIME 08:43 AM ESTIMATE NO. 03 BID OPENING 03/29/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/07/13 R.E. NAME: CHEN, MICHAEL DATE OF THIS ESTIMATE 10/12/13 LOCATION SEMI-FINAL ESTIMATE 08-SBD-60-R0.0/R10.0 ------------------- PETERSON-CHASE GENERAL IN SAN BERNARDINO AND RIVERSIDE ENGINEERING CONSTRUCTION INC COUNTIES AT VARIOUS LOCATIONS 1792 KAISER AVENUE IRVINE CA 92614 FED. AID NO. ACNH-000C(350)E INSTALL EXIT NUMBERING SIGNS ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 CONSTRUCTION SITE MANAGEMENT LS 825.0000 825.00 1.000 825 002 PREPARE WATER POLLUTION CONTROL LS 660.0000 660.00 1.000 660 PROGRAM 003 CONSTRUCTION AREA SIGNS LS 1,800.0000 1,800.00 1.000 1,800 004 TRAFFIC CONTROL SYSTEM LS 16,000.0000 16,000.00 1.000 16,000 005 PORTABLE CHANGEABLE MESSAGE SIGN EA 600.0000 1,200.00 2.000 1,200 006 REMOVE ROADSIDE SIGN (WOOD POST) EA 125.0000 5,625.00 45.000 5,625 007 LEAD COMPLIANCE PLAN LS 1,500.0000 1,500.00 1.000 1,500 008 FURNISH FORMED PANEL SIGN (OVERHEAD) SQFT 11.6000 24,244.00 2,090.000 24,244 009 FURNISH LAMINATED PANEL SIGN (1"-TYPE A) SQFT 19.0000 28,880.00 1,520.000 28,880 010 FURNISH LAMINATED PANEL SIGN (1"-TYPE B) SQFT 18.0000 5,940.00 330.000 5,940 011 FURNISH LAMINATED PANEL SIGN SQFT 22.0000 16,280.00 740.000 16,280 (2 1/2"-TYPE B) 012 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 9.0000 1,260.00 140.000 1,260 (0.063"-UNFRAMED) 013 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 9.0000 6,660.00 740.000 6,660 (0.080"-UNFRAMED) 014 ROADSIDE SIGN - ONE POST EA 285.0000 11,400.00 40.000 11,400 015 INSTALL SIGN OVERLAY SQFT 15.0000 2,115.00 141.000 2,115 016 INSTALL SIGN PANEL ON EXISTING FRAME EA 825.0000 23,925.00 29.000 23,925 017 INSTALL ROADSIDE SIGN EA 3,700.0000 37,000.00 10.000 37,000 (LAMINATED WOOD BOX POST) 018 OBJECT MARKER (TYPE K-1) EA 70.0000 2,800.00 40.000 2,800 019 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 300.0000 300.00 1.000 300 SYSTEM ELEMENTS DURING CONSTRUCTION PROGRAM CAS145 PAGE 2 DATE 10/12/13 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-0C7434 TIME 08:43 AM ESTIMATE NO. 03 BID OPENING 03/29/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/07/13 R.E. NAME: CHEN, MICHAEL DATE OF THIS ESTIMATE 10/12/13 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 0.00 188,414.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 6,464.92 6,464.92 SUBTOTAL AMOUNT EARNED 6,464.92 194,878.92 ORIGINAL CONTRACT AMOUNT 188,414.00 TOTAL WORK COMPLETED 6,464.92 194,878.92 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 10,000.00 0.00 TOTAL 16,464.92 194,878.92 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN JOB COM- WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR PLETED ON DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 07/23/12 45 11/20/12 11/20/12 05/07/13 43 77 0 0 100% 100% CHEN, MICHAEL RESIDENT ENGINEER PROGRAM CAS145 DATE 10/12/13