PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 06/12/08 EST. NO.07 TIME 08:44 AM R.E. NAME: YANG, CHAD 08-0E6804 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 002 0001 4,849.34 E.W. @ F.A.(+) 032508 N 001 0 4,849.34 TOTAL THIS ESTIMATE 1,184.50 TOTAL PREVIOUS ESTIMATE 6,033.84 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 06/12/08 EST. NO.07 TIME 08:44 AM R.E. NAME: YANG, CHAD 08-0E6804 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 06/12/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-0E6804 TIME 08:44 AM ESTIMATE NO. 07 BID OPENING 08/30/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/01/08 R.E. NAME: YANG, CHAD DATE OF THIS ESTIMATE 06/12/08 LOCATION SEMI-FINAL ESTIMATE 08-RIV-15-41.5/ .0 ------------------- J MC LOUGHLIN ENGINEERING CO. IN RIVERSIDE COUNTY IN CORONA AT STEVE VAN DORN P.E. NORTH ROUTE 15 TO WEST ROUTE 91 OPERATIONS MANAGER CONNECTOR OVERCROSSING AND AT 10641 FULTON COURT TEMESCAL WASH BRIDGE OVERHEAD RANCHO CUCAMONGA, CA 91730 FED. AID NO. N O N E BRIDGE DECK REHABILITATION ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 CONSTRUCTION SITE MANAGEMENT LS 8,000.0000 8,000.00 1.000 8,000.00 02 PREPARE WATER POLLUTION CONTROL LS 1,000.0000 1,000.00 1.000 1,000.00 PROGRAM 03 TEMPORARY DRAINAGE INLET PROTECTION EA 550.0000 2,750.00 5.000 2,750.00 04 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 670.0000 670.00 1.000 670.00 05 CONSTRUCTION AREA SIGNS LS 3,200.0000 3,200.00 1.000 3,200.00 S) 06 TRAFFIC CONTROL SYSTEM LS 65,000.0000 65,000.00 1.000 65,000.00 S) 07 TYPE II BARRICADE EA 50.0000 5,500.00 83.000 4,150.00 S) 08 PORTABLE CHANGEABLE MESSAGE SIGN EA 1,400.0000 11,200.00 8.000 11,200.00 S) 09 REMOVE PAVEMENT MARKER EA 1.1000 1,496.00 1,360.000 1,496.00 10 PREPARE CONCRETE BRIDGE DECK SURFACE SQFT 0.5300 32,648.00 61,600.000 32,648.00 11 CLEAN BRIDGE DECK SQFT 0.1700 34,602.65 207,379.000 35,254.43 12 BRIDGE REMOVAL (PORTION) LS 8,000.0000 8,000.00 1.000 8,000.00 13 STRUCTURAL CONCRETE, BRIDGE CY 1,700.0000 6,800.00 4.000 6,800.00 F) 14 CLEAN EXPANSION JOINT LF 22.0000 23,474.00 541.000 11,902.00 15 FURNISH POLYESTER CONCRETE OVERLAY CF 70.0000 323,400.00 4,845.000 339,150.00 16 PLACE POLYESTER CONCRETE OVERLAY SQFT 3.3000 203,280.00 61,600.000 203,280.00 F) 17 JOINT SEAL (MR 1") LF 33.0000 35,211.00 541.000 17,853.00 S) 18 JOINT SEAL ASSEMBLY (MR 2 1/2") LF 330.0000 12,870.00 39.000 12,870.00 S) 19 BAR REINFORCING STEEL (BRIDGE) LB 30.0000 4,290.00 143.000 4,290.00 SF) 20 TREAT BRIDGE DECK SQFT 0.3000 61,063.20 203,544.000 61,063.20 F) 21 FURNISH BRIDGE DECK TREATMENT MATERIAL GAL 55.0000 123,695.00 2,249.000 123,695.00 F) 22 THERMOPLASTIC PAVEMENT MARKING SQFT 7.0000 2,940.00 420.000 2,940.00 S) PROGRAM CAS145 PAGE 2 DATE 06/12/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-0E6804 TIME 08:44 AM ESTIMATE NO. 07 BID OPENING 08/30/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/01/08 R.E. NAME: YANG, CHAD DATE OF THIS ESTIMATE 06/12/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 THERMOPLASTIC TRAFFIC STRIPE LF 0.7500 17,625.00 29,590.000 22,192.50 S) (SPRAYABLE) 24 PAVEMENT MARKER (NON-REFLECTIVE) EA 5.5000 4,015.00 729.000 4,009.50 S) 25 PAVEMENT MARKER (RETROREFLECTIVE) EA 7.5000 4,725.00 594.000 4,455.00 S) PROGRAM CAS145 PAGE 3 DATE 06/12/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-0E6804 TIME 08:44 AM ESTIMATE NO. 07 BID OPENING 08/30/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/01/08 R.E. NAME: YANG, CHAD DATE OF THIS ESTIMATE 06/12/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 0.00 987,868.63 ADJUSTMENT OF COMPENSATION 0.00 1,184.50 EXTRA WORK 4,849.34 4,849.34 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 4,849.34 993,902.47 26 MOBILIZATION LS 110,000.0000 110,000.00 1.000 110,000.00 ORIGINAL CONTRACT AMOUNT 1,107,454.85 TOTAL WORK COMPLETED 4,849.34 1,103,902.47 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 4,849.34 1,103,902.47 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN JOB COM- WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR PLETED ON DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 10/04/07 40 11/19/07 11/19/07 05/01/08 35 77 0 0 100% 100% YANG, CHAD RESIDENT ENGINEER PROGRAM CAS145 PAGE 2 DATE 06/12/08