PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 09/25/06 EST. NO.01 TIME 12:00 PM R.E. NAME: YUEN, MICHAEL 08-0J1014 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 09/25/06 EST. NO.01 TIME 12:00 PM R.E. NAME: YUEN, MICHAEL 08-0J1014 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 09/25/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-0J1014 TIME 12:00 PM ESTIMATE NO. 01 BID OPENING 08/31/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/06 R.E. NAME: YUEN, MICHAEL DATE OF THIS ESTIMATE 09/25/06 LOCATION PROGRESS ESTIMATE 08-SBD-40-80.4/97.6 ----------------- YEAGER-SKANSKA IN SAN BERNARDINO COUNTY NEAR 1995 AGUA MANSA ROAD BARSTOW AND NEEDLES FROM MARBLE RIVERSIDE, CA 92509 WASH BRIDGE TO MUSTANG WASH BRIDGE FED. AID NO. ACBR-040 -2(52)E ,IM-040 -2(52)E REPLACE BRIDGES EASTBOUND ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 4,750.0000 4,750.00 0.000 0.00 02 TIME-RELATED OVERHEAD LS 117,000.0000 117,000.00 0.072 8,424.00 0.072 8,424.00 03 PREPARE STORM WATER POLLUTION LS 2,000.0000 2,000.00 0.750 1,500.00 0.750 1,500.00 PREVENTION PLAN 04 WATER POLLUTION CONTROL LS 8,000.0000 8,000.00 0.072 576.00 0.072 576.00 05 TEMPORARY FIBER ROLL M 14.0000 3,360.00 0.000 0.00 06 TEMPORARY SILT FENCE M 9.0000 12,510.00 0.000 0.00 07 TEMPORARY GRAVEL BAG BERM M 17.0000 9,690.00 0.000 0.00 08 TEMPORARY CONSTRUCTION ENTRANCE EA 9,500.0000 57,000.00 3.000 28,500.00 3.000 28,500.00 09 STREET SWEEPING LS 33,000.0000 33,000.00 0.072 2,376.00 0.072 2,376.00 10 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 5,000.0000 5,000.00 0.072 360.00 0.072 360.00 11 REMOVE METAL BEAM GUARD RAILING M 56.0000 23,520.00 315.000 17,640.00 315.000 17,640.00 S) 12 REMOVE ASPHALT CONCRETE DIKE M 5.0000 335.00 67.000 335.00 67.000 335.00 13 COLD PLANE ASPHALT CONCRETE PAVEMENT M2 3.6000 41,760.00 0.000 0.00 S) 14 BRIDGE REMOVAL, LOCATION A LS 106,000.0000 106,000.00 0.900 95,400.00 0.900 95,400.00 15 BRIDGE REMOVAL, LOCATION B LS 151,000.0000 151,000.00 0.900 135,900.00 0.900 135,900.00 16 BRIDGE REMOVAL, LOCATION C LS 184,000.0000 184,000.00 0.900 165,600.00 0.900 165,600.00 17 BRIDGE REMOVAL, LOCATION D LS 114,000.0000 114,000.00 0.900 102,600.00 0.900 102,600.00 18 BRIDGE REMOVAL, LOCATION E LS 146,000.0000 146,000.00 0.900 131,400.00 0.900 131,400.00 19 BRIDGE REMOVAL, LOCATION F LS 143,000.0000 143,000.00 0.900 128,700.00 0.900 128,700.00 20 CLEARING AND GRUBBING LS 12,600.0000 12,600.00 1.000 12,600.00 1.000 12,600.00 21 DEVELOP WATER SUPPLY LS 7,500.0000 7,500.00 1.000 7,500.00 1.000 7,500.00 22 SHOULDER BACKING STA 1,500.0000 34,500.00 0.000 0.00 PROGRAM CAS145 PAGE 2 DATE 09/25/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-0J1014 TIME 12:00 PM ESTIMATE NO. 01 BID OPENING 08/31/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/06 R.E. NAME: YUEN, MICHAEL DATE OF THIS ESTIMATE 09/25/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 STRUCTURE EXCAVATION (BRIDGE) M3 30.0000 47,700.00 1,375.000 41,250.00 1,375.000 41,250.00 F) 24 STRUCTURE BACKFILL (BRIDGE) M3 60.0000 49,200.00 0.000 0.00 F) 25 EROSION CONTROL (TYPE PSFM) M2 1.0000 24,500.00 0.000 0.00 S) 26 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0.00 27 ASPHALT CONCRETE (TYPE C) TONN 80.0000 256,000.00 0.000 0.00 28 ASPHALT CONCRETE (OPEN GRADED) TONN 80.0000 66,400.00 0.000 0.00 29 PLACE ASPHALT CONCRETE (MISCELLANEOUS M2 200.0000 1,000.00 0.000 0.00 AREA) 30 PLACE ASPHALT CONCRETE DIKE (TYPE E) M 14.0000 1,680.00 0.000 0.00 31 PLACE ASPHALT CONCRETE DIKE (TYPE F) M 14.0000 2,100.00 0.000 0.00 32 STRUCTURAL CONCRETE, BRIDGE FOOTING M3 910.0000 268,450.00 80.000 72,800.00 80.000 72,800.00 F) 33 STRUCTURAL CONCRETE, BRIDGE M3 1,192.0000 1,692,640.00 0.000 0.00 F) 34 STRUCTURAL CONCRETE, APPROACH SLAB M3 1,100.0000 460,900.00 0.000 0.00 F) (TYPE N) 35 FURNISH PRECAST PRESTRESSED CONCRETE EA 11,970.0000 634,410.00 0.000 0.00 S) GIRDER (15 M - 20 M) 36 FURNISH PRECAST PRESTRESSED CONCRETE EA 21,800.0000 130,800.00 0.000 0.00 S) GIRDER (25 M - 30 M) 37 FURNISH PRECAST PRESTRESSED CONCRETE EA 22,600.0000 271,200.00 0.000 0.00 S) GIRDER (30 M - 35 M) 38 ERECT PRECAST PRESTRESSED CONCRETE EA 1,675.0000 118,925.00 0.000 0.00 S) GIRDER 39 JOINT SEAL (MR 30 MM) M 130.0000 3,510.00 0.000 0.00 S) (TYPE A SILICONE ONLY) 40 JOINT SEAL (MR 30 MM) M 120.0000 3,720.00 0.000 0.00 S) 41 JOINT SEAL (MR 15 MM) M 95.0000 10,450.00 0.000 0.00 S) 42 BAR REINFORCING STEEL (BRIDGE) KG 3.0000 551,100.00 7,673.800 23,021.40 7,673.800 23,021.40 SF) 43 HEADED BAR REINFORCEMENT EA 82.0000 16,400.00 0.000 0.00 S) 44 REMOVE AND REPLACE ROCK SLOPE M3 34.0000 91,120.00 670.000 22,780.00 670.000 22,780.00 PROTECTION 45 ROCK SLOPE PROTECTION FABRIC M2 3.0000 9,300.00 0.000 0.00 46 MINOR CONCRETE (MISCELLANEOUS M3 320.0000 51,200.00 0.000 0.00 CONSTRUCTION) 47 METAL BEAM GUARD RAILING (WOOD POST) M 111.0000 46,620.00 0.000 0.00 S) 48 TRANSITION RAILING (TYPE WB) EA 3,900.0000 46,800.00 0.000 0.00 S) 49 ALTERNATIVE FLARED TERMINAL SYSTEM EA 3,200.0000 38,400.00 0.000 0.00 S) PROGRAM CAS145 PAGE 3 DATE 09/25/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-0J1014 TIME 12:00 PM ESTIMATE NO. 01 BID OPENING 08/31/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/06 R.E. NAME: YUEN, MICHAEL DATE OF THIS ESTIMATE 09/25/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 50 CONCRETE BARRIER (TYPE 732) M 300.0000 191,400.00 0.000 0.00 F) PROGRAM CAS145 PAGE 4 DATE 09/25/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-0J1014 TIME 12:00 PM ESTIMATE NO. 01 BID OPENING 08/31/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/06 R.E. NAME: YUEN, MICHAEL DATE OF THIS ESTIMATE 09/25/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 999,262.40 999,262.40 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 999,262.40 999,262.40 51 MOBILIZATION LS 265,000.0000 265,000.00 0.950 251,750.00 0.950 251,750.00 ORIGINAL CONTRACT AMOUNT 6,567,450.00 TOTAL WORK COMPLETED 1,251,012.40 1,251,012.40 MATERIALS ON HAND ON SITE 335,353.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 1,251,012.40 1,586,365.40 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 09/14/06 180 09/08/06 09/08/06 03/06/07 13 0 0 0 19% 7% PROGRESS IS SATISFACTORY YUEN, MICHAEL RESIDENT ENGINEER PROGRAM CAS145 PAGE 2 DATE 09/25/06