PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 02/26/10 EST. NO.02 TIME 08:34 AM R.E. NAME: TAHA, ISSA 08-0J3704 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 02/26/10 EST. NO.02 TIME 08:34 AM R.E. NAME: TAHA, ISSA 08-0J3704 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE PER SECTION 86-8.01 -5,000.00 02 -5,000.00 -5,000.00 TOTAL DEDUCTIONS -5,000.00 -5,000.00 PROGRAM CAS145 PAGE 1 DATE 02/26/10 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-0J3704 TIME 08:34 AM ESTIMATE NO. 02 BID OPENING 09/10/09 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/22/10 R.E. NAME: TAHA, ISSA DATE OF THIS ESTIMATE 02/26/10 LOCATION PROGRESS ESTIMATE 08-SBD-18-102.3/102.6 ----------------- UNIQUE PERFORMANCE IN SAN BERNARDINO CO IN VICTORVILLE CONSTRUCTION INC AND ADELANTO AT VERBENA ROAD 1931 NEWPORT BOULEVARD NO D COSTA MESA CA 92627 FED. AID NO. N O N E INSTALL TRAFFIC SIGNALS ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 SMALL BUSINESS UTILIZATION REPORT EA 250.0000 250.00 0.000 0.00 02 CONSTRUCTION SITE MANAGEMENT LS 500.0000 500.00 0.360 180.00 0.480 240.00 03 PREPARE WATER POLLUTION CONTROL LS 600.0000 600.00 1.000 600.00 PROGRAM 04 STREET SWEEPING LS 250.0000 250.00 0.360 90.00 0.480 120.00 05 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 300.0000 300.00 0.360 108.00 0.360 108.00 06 CONSTRUCTION AREA SIGNS LS 1,500.0000 1,500.00 0.500 750.00 07 TRAFFIC CONTROL SYSTEM LS 1,500.0000 1,500.00 0.360 540.00 0.480 720.00 08 TYPE II BARRICADE EA 50.0000 200.00 2.000 100.00 09 CHANNELIZER (SURFACE MOUNTED) EA 20.0000 680.00 17.000 340.00 10 FLASHING BEACON (PORTABLE) EA 40.0000 160.00 2.000 80.00 11 PORTABLE CHANGEABLE MESSAGE SIGN LS 1,000.0000 1,000.00 0.000 0.00 12 REMOVE TRAFFIC STRIPE LF 0.6600 7,194.00 0.000 0.00 13 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 11.0000 770.00 0.000 0.00 14 REMOVE PAVEMENT MARKER EA 1.0000 440.00 0.000 0.00 15 REMOVE ROADSIDE SIGN EA 44.0000 44.00 0.000 0.00 16 RESET ROADSIDE SIGN (TWO POST) EA 110.0000 110.00 0.000 0.00 17 ROADWAY EXCAVATION CY 65.0000 9,100.00 0.000 0.00 18 LEAD COMPLIANCE PLAN LS 2,900.0000 2,900.00 0.000 0.00 19 CLASS 2 AGGREGATE BASE CY 45.0000 2,880.00 0.000 0.00 20 MINOR HOT MIX ASPHALT TON 130.0000 18,200.00 0.000 0.00 21 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 12.0000 1,104.00 0.000 0.00 (0.063"-UNFRAMED) 22 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 16.0000 336.00 0.000 0.00 (0.080"-UNFRAMED) PROGRAM CAS145 PAGE 2 DATE 02/26/10 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-0J3704 TIME 08:34 AM ESTIMATE NO. 02 BID OPENING 09/10/09 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/22/10 R.E. NAME: TAHA, ISSA DATE OF THIS ESTIMATE 02/26/10 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 ROADSIDE SIGN - TWO POST EA 209.0000 836.00 0.000 0.00 24 MINOR CONCRETE (CURB AND CURB RAMP) CY 250.0000 5,500.00 8.000 2,000.00 8.000 2,000.00 25 METAL BEAM GUARD RAILING (WOOD POST) LF 31.0000 4,960.00 50.000 1,550.00 50.000 1,550.00 26 END ANCHOR ASSEMBLY (TYPE SFT) EA 850.0000 1,700.00 0.000 0.00 27 ALTERNATIVE FLARED TERMINAL SYSTEM EA 2,860.0000 5,720.00 1.000 2,860.00 1.000 2,860.00 28 THERMOPLASTIC PAVEMENT MARKING SQFT 3.5700 1,785.00 0.000 0.00 29 THERMOPLASTIC TRAFFIC STRIPE LF 0.4700 4,982.00 0.000 0.00 (SPRAYABLE) 30 PAVEMENT MARKER (REFLECTIVE-RECESSED) EA 8.2500 3,630.00 0.000 0.00 31 SIGNAL AND LIGHTING LS 105,000.0000 105,000.00 0.550 57,750.00 0.710 74,550.00 PROGRAM CAS145 PAGE 3 DATE 02/26/10 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-0J3704 TIME 08:34 AM ESTIMATE NO. 02 BID OPENING 09/10/09 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/22/10 R.E. NAME: TAHA, ISSA DATE OF THIS ESTIMATE 02/26/10 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 65,078.00 84,018.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED 65,078.00 84,018.00 ORIGINAL CONTRACT AMOUNT 184,131.00 TOTAL WORK COMPLETED 65,078.00 84,018.00 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS -5,000.00 -5,000.00 TOTAL 60,078.00 79,018.00 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 10/13/09 40 01/11/10 01/11/10 03/22/10 20 8 0 0 46% 50% PROGRESS IS SATISFACTORY TAHA, ISSA RESIDENT ENGINEER PROGRAM CAS145 PAGE 7 DATE 02/26/10